ML20195H581: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:--      _  -__ __ __________. __    _.
NOV 161988 Carver Public Library ATTN:  Librarian Post Office Box 328 1
Main Street Carver, Massachusetts 02330 Gentlemen:
!                This letter forwards a copy of the transcripts of the Public Meeting held by the Nuclear Regulatory Commission (NRC) on September 29, 1988, at Memorial Hall, Plymouth, Massachusetts, to describe the bases for the NRC staff's con-t clusion regarding technical and management issues at the Pilgrim Nuclear Power Station (PNPS), and of the public meeting held by NRC on October 5,1988, in Rockville, Maryland, on the status of readiness for restart of PNPS.
k                Please place this material with the copy of the PNPS Restart Plan and Self-L              Assessment Report, which were previously provided, and make it available for public review.
Thank you for your continuing cooperation in this matter.
Sincerely, 09 pal SIGffED BY Samuel J. Collins, Deputy Director Division of Reactor Projects
 
==Enclosures:==
 
As stated cc w/o enc 1s:
Public Document Room (POR) local Public Document Room (LPOR) bec w/o encis:
L. T. Doerflein, DRP M. J. 010onato, OP.P M. T. Miller, SLO 88113004B5 301116 DR  ADOCA O        g3 0FFICIAL RECORD COPY LIBRARY CARVER - 0001.0.0              y    e) 11/16/88                                    /
l0
 
r a  ..'
            ' Carver Public Library 2
d
(                                      s RI:0RP                    RI:DRP          I:DRP          R $RP LDoerflein/mjd                        a JWiggins            tfilins (gRBlough 11/86/88                  11/Ie/88      11/[b/88          11/\0/88 0FFICIAL RECORD COPY LIBRARY CARVER - 0002.0.0 11/16/88 L}}

Latest revision as of 17:15, 13 November 2020

Forwards Transcripts of Public Meetings on 880929 in Plymouth,Ma Re Technical & Mgt Issues at Plant & 881005 Public Meeting in Rockville,Md Re Status of Readiness for Restart of Plant.W/O Encls
ML20195H581
Person / Time
Site: Pilgrim
Issue date: 11/16/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
CARVER, MA
References
NUDOCS 8811300485
Download: ML20195H581 (2)


Text

-- _ -__ __ __________. __ _.

NOV 161988 Carver Public Library ATTN: Librarian Post Office Box 328 1

Main Street Carver, Massachusetts 02330 Gentlemen:

! This letter forwards a copy of the transcripts of the Public Meeting held by the Nuclear Regulatory Commission (NRC) on September 29, 1988, at Memorial Hall, Plymouth, Massachusetts, to describe the bases for the NRC staff's con-t clusion regarding technical and management issues at the Pilgrim Nuclear Power Station (PNPS), and of the public meeting held by NRC on October 5,1988, in Rockville, Maryland, on the status of readiness for restart of PNPS.

k Please place this material with the copy of the PNPS Restart Plan and Self-L Assessment Report, which were previously provided, and make it available for public review.

Thank you for your continuing cooperation in this matter.

Sincerely, 09 pal SIGffED BY Samuel J. Collins, Deputy Director Division of Reactor Projects

Enclosures:

As stated cc w/o enc 1s:

Public Document Room (POR) local Public Document Room (LPOR) bec w/o encis:

L. T. Doerflein, DRP M. J. 010onato, OP.P M. T. Miller, SLO 88113004B5 301116 DR ADOCA O g3 0FFICIAL RECORD COPY LIBRARY CARVER - 0001.0.0 y e) 11/16/88 /

l0

r a ..'

' Carver Public Library 2

d

( s RI:0RP RI:DRP I:DRP R $RP LDoerflein/mjd a JWiggins tfilins (gRBlough 11/86/88 11/Ie/88 11/[b/88 11/\0/88 0FFICIAL RECORD COPY LIBRARY CARVER - 0002.0.0 11/16/88 L