ML20195J790: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:.          -              .    .-    ..
  (
  ,, ,
        In Reply Refer To:                    m 221988
        Docket:    50-458/87-29
,        Gulf States Utilities
        ATTN:  Mr. James C. Deddens
                Senior Vice President, (RBNG)
                Nuclear Licensing
        P.O. Box 220
        St. Francisville, LA 70775
        Gentlemen:
        This refers to the inspection conducted by Messrs. D. D. Chamberlain and
        W. B. Jones of.this office during the period November 22 through December 31,.
        1987, of activities authorized by NRC Operating License NPF-47 for the River
        Bend Station, and to the discussion of our findings with you and other members
        of your staff at the conclusion of the inspection.
        Areas examined during the inspec+.en included status of facility operating
        license conditions, review of licensee action on NRC Bulletin 87-02, 10 CFR
        Part 21 reports, surveillance test observation, maintenance observation, safety
        system walkdown, and operational safety verification. Within these areas, the
        inspection consisted of selective examination of procedures and representative
        records, interviews with personnel, and observations by the NRC inspectors.
        The inspection findings are documented in the enclosed inspection report.
        During this inspection, it was found that certain of your activitics were in
        violation of NRC requirements.      Consequently, you are required to respond to
        this violation, in writing, in accordance with the provisions of Section 2.201
        of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
        Regulations.    Your response should be based on the specifics contained in the
        Notice of Violation enclosed with this letter.
        We have also examined actions you have taken with regard to previously
        identified inspection findings.      The status of these items are identified in
        paragraph 2 of the enclosed report.
        The response directed by this letter and the accompanying Notice is not subject
        to the clearance precedures of the Office of Management and Budget as required
        by the Paperwork Reduction Act of 1980, PL 96-511.
        RIV:DRP/ SRI    Y'        DRP/C              ORP/C                DRP
        ODChamberlain;dp            CLMadsen            EHoller              LJCallan
        / /;VJ/88                    / W88              //go/88            ( /sV88
      .                                  e
        8901290016 880122
        PDR
        O
                ADOCK 05000458                                                          /
                                                                                          /
                                                                                              '
                                                                                                /
                                                                                                .
                            PDR
                                                                                      /
                                                                                                    k
 
i .
    Gulf States Utilities                    -2-
    Should you have any questions concerning this inspection, we will be pleased to
    discuss them with you.
                                              Sincerely,
                                                Orfginal Signed By
                                                    L J. Callan
                                              L. J. Callan, Director
                                              Division of Reactor Projects
    Enclosures:
    1.  Appendix A - Notice of Violation
    2.  Appendix B - NRC Inspection Report
          50-458/87-29
    cc w/ enclosure: Gulf States Utilities
    ATTN:  J. E. Booker, Manager-
              River Bend Oversight
    P.O. Box 2951
    Beaumont, Texas 77704
    Louisiana State University,
      Government Documents Department
    Louisiana Radiation Control Program Director
    bec to DMB (IE01)
    bec distrib. by RIV:
    *DRP                                * Resident Inspector
    R. D. Martin, RA                  *Section Chief (DRP/C)
    *Lisa Shea, RM/ALF                  * MIS System
    RPSB-DRSS                          *RSTS Operator
    * Project Engineer, DRP/C          *RIV File
    *W. Paulson, NRR Project Manager    *R.  Hall
    *DRS                                *TSS
    *w/766
}}
}}

Latest revision as of 14:02, 13 November 2020

Forwards Insp Rept 50-458/87-29 on 871122-1231 & Notice of Violation
ML20195J790
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/22/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20195J794 List:
References
IEB-87-002, IEB-87-2, NUDOCS 8801290016
Download: ML20195J790 (2)


See also: IR 05000458/1987029

Text

. - . .- ..

(

,, ,

In Reply Refer To: m 221988

Docket: 50-458/87-29

, Gulf States Utilities

ATTN: Mr. James C. Deddens

Senior Vice President, (RBNG)

Nuclear Licensing

P.O. Box 220

St. Francisville, LA 70775

Gentlemen:

This refers to the inspection conducted by Messrs. D. D. Chamberlain and

W. B. Jones of.this office during the period November 22 through December 31,.

1987, of activities authorized by NRC Operating License NPF-47 for the River

Bend Station, and to the discussion of our findings with you and other members

of your staff at the conclusion of the inspection.

Areas examined during the inspec+.en included status of facility operating

license conditions, review of licensee action on NRC Bulletin 87-02, 10 CFR

Part 21 reports, surveillance test observation, maintenance observation, safety

system walkdown, and operational safety verification. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspectors.

The inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activitics were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items are identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance precedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RIV:DRP/ SRI Y' DRP/C ORP/C DRP

ODChamberlain;dp CLMadsen EHoller LJCallan

/ /;VJ/88 / W88 //go/88 ( /sV88

. e

8901290016 880122

PDR

O

ADOCK 05000458 /

/

'

/

.

PDR

/

k

i .

Gulf States Utilities -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Orfginal Signed By

L J. Callan

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-458/87-29

cc w/ enclosure: Gulf States Utilities

ATTN: J. E. Booker, Manager-

River Bend Oversight

P.O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • DRP * Resident Inspector

R. D. Martin, RA *Section Chief (DRP/C)

  • Lisa Shea, RM/ALF * MIS System

RPSB-DRSS *RSTS Operator

  • Project Engineer, DRP/C *RIV File
  • W. Paulson, NRR Project Manager *R. Hall
  • DRS *TSS
  • w/766