ML20154D514: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:-
    . .-                                  Igy  9 1988
  ,
      In Reply Refer To:                                                  Document Contains
      Dockets: 50-313/88-08
                  50-368/88-08                                        SAFEGUARDS INFORMATION
      Arkansas Power & Light Company
      ATTN: Mr. Gene Campbell
              Vice President, Nuclear
                Operations
      P.O. Box 551
      Little Rock, Arkansas 72203
      Gentlemen:
      This refers to the inspection conducted by Mr. R. A. Caldwell of this office
      during the period March 21-25, 1988, of activities authorized by NRC Operating
      Licenses DPR-51 and NPF-6 for the Arkansas Nuclear One, Units 1 and 2, and to
      the discussion of our findings with Mr. E. C. Ewing and other members of your
      staff at the conclusion of the inspection.
      The inspection reviewed certain areas of your physical security program.
      Within these areas, the inspection consisted of selective examination of
      procedures and representative records, interviews with personnel, and
      observations by the NRC inspector. The areas inspected and the inspection
      findings are documented in the enclosed inspection report.
      During this inspection, it was found that certain of your activities were in
      violation of NRC requirements.    Consequently, you are required to respond to
      these violations, in writing, in accordance with the provisions of
      Section 2.201 of the NRC's "Reles of Practice," Part 2, Title 10, Code of
      Federal Regulations. Your response should be based on the specifics contained
      in the Notice of Violation enclosed with this letter.                                      )
      One unresolved item is identified in paragraph 8 of the enclosed inspection
      report.
      We have also examined action you have taken with regard to previously
      identified inspection findings.    The status of these items is identified in
      paragraph 2 of the enclosed report.
      The material enclosed herewith contains Safeguards Information as defined by
      10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
      by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the
      material, with the exception of the report cover page which is an inspection
      summary, will not be placed in the Public Document Room.
                                                                                                  j
      RIVQk: RPSB        C:    PSB    C:RPSB    A0 r,6    C:DRP/A            D:DRP
      RACa mwell/tw      RJE    tt    ,BMurray    MEEmerson    C ,amberlain    LJCallan
      6/5/88            5/ /88
                                      9 / /88 f/f/88          /3/88          f/f'/88
          Document Contains                                  ENCLOSURE CONTAINS
      SAFEGUARDS INFORMATION                                  SAFEGUARDS INFORMATION.      I
                                                              UPON SEPARATION THIS
      8805170215 880509                                      PAGE IS DECONTROLLED.          /
                                                                                                %
      PDR    ADOCK 05000313
      Q                    DCD
                                  ,
                                                                                            h@0  .
                                                                                                  '
 
      .                          ..          _      . _ .      _.                            -    .
                                                                                                        I
            .
    .
        ,
4  ,
          Arkansas Power & Light Company                    -2-
          The response directed by this letter and the accompanying Notice is not subject
          to the clearance procedures of the Office of Management and Budget as required
;          by the Paperwork Reduction Act of 1980, PL 96-511.
          Should you have any questions concerning this inspection, we will be pleased to
          discuss them with you.
.!                                                            Sincerely,
                                                              Original Signed By
                                                                    L. J. Callan                        -
                                                                                                        ,
                                                              L. J. Callan, Director
                                                              Division of Reactor Projects
          Enclosures:
          1.        Appendix A - Notice of Violation                                                  '
          2.        Appendix B - NRC Inspection Report
                        50-313/88-08
                        50-368/88-08
I
          cc w/ summary page only:                                                                      ,
          Arkansas Nuclear One                                                                          '
          ATTN:        J. M. Levine, Director
                          Site Nuclear Operations
          P.O. Box 608
          Russellville, Arkansas 72801
          Arkansas Radiation Control Program Director
          bec: Copy of er. tire report:
                        RIV Security File
                        P. A. Starcher, RSGB/NRR
-                      Resident Inspector
j                      R. D. Martin, RA                                                                i'
!                      R. L. Bangart, DRSS
4
                        Security Inspector
                        Chief, RPSB
                        RPSB Security File
,
                        H. L. Scott, E0
1
                        M. E. Emerson (2)
          bec: RIV - Letter and Inspection Summary only w/766:
          DRP                          Lisa Shea, RM/ALF                    Section Chief, DRP/A        '
          RIV File                    MIS                                  RSTS Operator                ,
          RPSB                        R. E. Hall, DRSS                      Project Engineer, DRP/A      '
          bcc: RIV - Letter and Inspection Summary only w/out 766:                                        l
                                                                                                          i
t
        A)MB - IE-04                                                                                      l
          DRS
:!                                                                                                        !
          G. Dick, NRR Project Inspector
                                                                              F.NCLOSURE CONTAINS      l
                                                                              SAFEGUARDS INFORMATION.
                                                                                                          l
;
                                                                              UPON SEPARATION THIS
                                                                              PAGE IS DECONTROLLED.
                                                                                                          '
!                                                                                                        ,
              . - --__
}}
}}

Latest revision as of 04:00, 4 November 2020

Forwards Insp Repts 50-313/88-08 & 50-368/88-08 on 880321-25
ML20154D514
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/09/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20154D519 List:
References
NUDOCS 8805190215
Download: ML20154D514 (2)


See also: IR 05000313/1988008

Text

-

. .- Igy 9 1988

,

In Reply Refer To: Document Contains

Dockets: 50-313/88-08

50-368/88-08 SAFEGUARDS INFORMATION

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. R. A. Caldwell of this office

during the period March 21-25, 1988, of activities authorized by NRC Operating

Licenses DPR-51 and NPF-6 for the Arkansas Nuclear One, Units 1 and 2, and to

the discussion of our findings with Mr. E. C. Ewing and other members of your

staff at the conclusion of the inspection.

The inspection reviewed certain areas of your physical security program.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspector. The areas inspected and the inspection

findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's "Reles of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter. )

One unresolved item is identified in paragraph 8 of the enclosed inspection

report.

We have also examined action you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

material, with the exception of the report cover page which is an inspection

summary, will not be placed in the Public Document Room.

j

RIVQk: RPSB C: PSB C:RPSB A0 r,6 C:DRP/A D:DRP

RACa mwell/tw RJE tt ,BMurray MEEmerson C ,amberlain LJCallan

6/5/88 5/ /88

9 / /88 f/f/88 /3/88 f/f'/88

Document Contains ENCLOSURE CONTAINS

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION. I

UPON SEPARATION THIS

8805170215 880509 PAGE IS DECONTROLLED. /

%

PDR ADOCK 05000313

Q DCD

,

h@0 .

'

. .. _ . _ . _. - .

I

.

.

,

4 ,

Arkansas Power & Light Company -2-

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

.! Sincerely,

Original Signed By

L. J. Callan -

,

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation '

2. Appendix B - NRC Inspection Report

50-313/88-08

50-368/88-08

I

cc w/ summary page only: ,

Arkansas Nuclear One '

ATTN: J. M. Levine, Director

Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec: Copy of er. tire report:

RIV Security File

P. A. Starcher, RSGB/NRR

- Resident Inspector

j R. D. Martin, RA i'

! R. L. Bangart, DRSS

4

Security Inspector

Chief, RPSB

RPSB Security File

,

H. L. Scott, E0

1

M. E. Emerson (2)

bec: RIV - Letter and Inspection Summary only w/766:

DRP Lisa Shea, RM/ALF Section Chief, DRP/A '

RIV File MIS RSTS Operator ,

RPSB R. E. Hall, DRSS Project Engineer, DRP/A '

bcc: RIV - Letter and Inspection Summary only w/out 766: l

i

t

A)MB - IE-04 l

DRS

!  !

G. Dick, NRR Project Inspector

F.NCLOSURE CONTAINS l

SAFEGUARDS INFORMATION.

l

UPON SEPARATION THIS

PAGE IS DECONTROLLED.

'

! ,

. - --__