ML20127F657: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:,, . (_,      )
    ,
          #p"%go
          .
                                                UNITED STATES
                                                                                      ,y -            !
        8
  '
                      ,,
                                      NUCLEAR REGULATORY COMMISSION
  ,,    $            "$
                      #
                                                    REGION ill
        o                                      799 ROOSEVELT ROAD
                                            GLEN ELLYN. ILLINOIS 60137                          *    l
            .....
                                                  . R#1 2 5 G22
            Docket No. 50-3J9e
            Docket No. 50 30 ,)
            Consumers Power Company
            ATTN:  Mr. James W. Cook
                    Vice President
                    Midland Project
            1945 West Parnall Road
            Jackson', MI 49201
            Gentlemen:
            This refers to the routine safety inspection conducted by Mr. K. D. Ward
  .          of this office on June 1 and 2,1982, of activities at the Midland Plant,
            Units 1 and 2, authorized by NRC Construction Permits No. CPPR-81 and
            No. CPPR-82 and to the discussion of our findings with you and Mr.
            R. Whitaker at the conclusion of the inspection.
            The <:nclosed copy of our inspection report identifies areas examined during
            the inspection. Within these areas, the inspection consisted of a selective
            examination of procedures and representative records, observations, and
            interviews with personnel.
            No items of noncompliance with NRC requirements were identified during the
            course of this inspection.
            In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
            of this letter and the enclosed inspection report will be placed in the
            NRC's Public Document Room.    If this report contains any information
            that you (or your contractors) believe to be exempt from disclosure under
            10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
            phone within ten (10) days from the date of this letter of your intention
                                                                                                    ,
            to file a request for withholding; and (b) submit within twenty-five (25)
            days from the date of this letter a written application to this office
            to withhold such information. If your receipt of this letter has been
            delayed such that less than seven (7) days are available for your review,
            please notify this office promptly so that a new due date may be estab-
            lished. Consistent with Section 2.790(b)(1), any such application must
>
                                                                                                  _
      %)
      .!
                  hDR hh0850418
                  WDE85- 213        PDR
                                      -
 
    e
    '
          Consumers Power Company
                                                                                '
                                                        2                                2 5 ISS2
                                                                                                                                                    .
          be acccmpanied by an affidavit executed by the owner of the in format ion
          which identifies the document or part sought to be withheld, and which
          contains a full statement of the rea ans which are the bases for the
          claim that the information should be withheld from public disclosure.
          This section further requires the statement to address with specificity
          the considerations listed in 10 CFR 2.790(b)(4). The information sought
          to be withheld shall be incorporated as far as possible into a separate
          part of the affidavit.      If we do not hear from you in this regard within
          the specified periods noted above, a copy of this letter and the enclosed
          inspection report will be placed in the Public Document Rocm.
          We will gladly discuss any questions you have concerning this inspection.
                                                  Sincerely,
  ,                                              /6 f      17) Y-
                                                  W. S. Little, Chief
                                                  Engineering Inspection Branch
          Enclosure:    Inspection
            Report No. 50-329/82- 12 (DETP)
            and No. 50-330/82-12(DETP)
          cc w/ encl:
          DMB/ Document Control Desk (RIDS)
          Resident Inspector, RIII
          The Honorable Charles Bechhoefer, ASLB
          The Honorable Jerry Harbour, ASLB
          The Honorable Frederick P. Cowan, ASLB
          The Honorable Ralph S. Decker, ASLB
          Michael Miller
          Ronald Callen, Michigan
              Public Service Commission                                                                                                                  -
          Myron M. Cherry
          Barbara Stamiris
          Mary Sinclair
          Wendell Marshall
          Colonel Steve J. Gadler (P.E.)
                                                                                                                                                      -
          RIII              RIII            RIIIq          RIII          RII
            -)lg            /jp:/M                            /6
                                                                                  '
        '
          Wdrd/jp          Danielson        Boyd            Knop / 3,,    Lttle/
      .) 6/11/82            g,j g-        jgfa            j,            g f.!c
l
L
\
i
                                                                                  . - . -      - . - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
}}
}}

Latest revision as of 17:59, 23 July 2020

Forwards Safety Insp Repts 50-329/82-12 & 50-330/82-12 on 820601-02.No Noncompliance Noted
ML20127F657
Person / Time
Site: Midland, 05000000
Issue date: 06/25/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20127F538 List:
References
FOIA-85-213 NUDOCS 8506250220
Download: ML20127F657 (2)


See also: IR 05000329/1982012

Text

,, . (_, )

,

  1. p"%go

.

UNITED STATES

,y -  !

8

'

,,

NUCLEAR REGULATORY COMMISSION

,, $ "$

REGION ill

o 799 ROOSEVELT ROAD

GLEN ELLYN. ILLINOIS 60137 * l

.....

. R#1 2 5 G22

Docket No. 50-3J9e

Docket No. 50 30 ,)

Consumers Power Company

ATTN: Mr. James W. Cook

Vice President

Midland Project

1945 West Parnall Road

Jackson', MI 49201

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward

. of this office on June 1 and 2,1982, of activities at the Midland Plant,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-81 and

No. CPPR-82 and to the discussion of our findings with you and Mr.

R. Whitaker at the conclusion of the inspection.

The <:nclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room. If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

,

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information. If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

>

_

%)

.!

hDR hh0850418

WDE85- 213 PDR

-

e

'

Consumers Power Company

'

2 2 5 ISS2

.

be acccmpanied by an affidavit executed by the owner of the in format ion

which identifies the document or part sought to be withheld, and which

contains a full statement of the rea ans which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Rocm.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

, /6 f 17) Y-

W. S. Little, Chief

Engineering Inspection Branch

Enclosure: Inspection

Report No. 50-329/82- 12 (DETP)

and No. 50-330/82-12(DETP)

cc w/ encl:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

The Honorable Charles Bechhoefer, ASLB

The Honorable Jerry Harbour, ASLB

The Honorable Frederick P. Cowan, ASLB

The Honorable Ralph S. Decker, ASLB

Michael Miller

Ronald Callen, Michigan

Public Service Commission -

Myron M. Cherry

Barbara Stamiris

Mary Sinclair

Wendell Marshall

Colonel Steve J. Gadler (P.E.)

-

RIII RIII RIIIq RIII RII

-)lg /jp:/M /6

'

'

Wdrd/jp Danielson Boyd Knop / 3,, Lttle/

.) 6/11/82 g,j g- jgfa j, g f.!c

l

L

\

i

. - . - - . - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .