. (_,
)
- p"%g
,y -
,,
,
.
o
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
'
,,
$
"$
REGION ill
,,
o
799 ROOSEVELT ROAD
GLEN ELLYN. ILLINOIS 60137
l
.....
. R#1 2 5 G22
Docket No. 50-3J9e
Docket No. 50 30 ,)
Consumers Power Company
ATTN:
Mr. James W. Cook
Vice President
Midland Project
1945 West Parnall Road
Jackson', MI 49201
Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. D. Ward
of this office on June 1 and 2,1982, of activities at the Midland Plant,
.
Units 1 and 2, authorized by NRC Construction Permits No. CPPR-81 and
No. CPPR-82 and to the discussion of our findings with you and Mr.
R. Whitaker at the conclusion of the inspection.
The <:nclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
,
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
>
_
%)
.!
hDR hh0850418
WDE85- 213
-
.
.
e
Consumers Power Company
2
'
2 5 ISS2
'
.
be acccmpanied by an affidavit executed by the owner of the in format ion
which identifies the document or part sought to be withheld, and which
contains a full statement of the rea ans which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Rocm.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
17) Y-
/6 f
,
W. S. Little, Chief
Engineering Inspection Branch
Enclosure:
Inspection
Report No. 50-329/82- 12 (DETP)
and No. 50-330/82-12(DETP)
cc w/ encl:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
The Honorable Charles Bechhoefer, ASLB
The Honorable Jerry Harbour, ASLB
The Honorable Frederick P. Cowan, ASLB
The Honorable Ralph S. Decker, ASLB
Michael Miller
Ronald Callen, Michigan
Public Service Commission
-
Myron M. Cherry
Barbara Stamiris
Mary Sinclair
Wendell Marshall
Colonel Steve J. Gadler (P.E.)
-
RIII
RIII
RIIIq
RIII
RII
-)lg
/jp:/M
/6
Lttle/
'
Wdrd/jp
Danielson
Boyd
Knop /
3,,
'
. )
6/11/82
g,j g-
jgfa
j,
g f.!c
l
L\\
i
. - . -
- . - -
.