Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20205T6491988-11-0707 November 1988 Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20205R6731988-11-0404 November 1988 Forwards NRC Testimony of Jj Swift Addressing ASLB Inquiries of 881018 & Two Attachments.Related Correspondence ML20205N3691988-10-28028 October 1988 Advises That ASLB Tentatively Calling for Telcon on 881109 W/Parties & State of Tn to Discuss Need for Further Prehearing Conference & Other Scheduling Matters,Per 881026 Request.Served on 881031 ML20206B2481988-10-27027 October 1988 Notice of Significant Licensee Meeting 88-174 on 881118 in King of Prussia,Pa to Discuss Configuration Mgt ML20195B6131988-10-26026 October 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20205K3321988-10-26026 October 1988 Forwards SER Re Const Mod & Licensing of & Application for CP for Facilities.Nrc Review of Safeguards/Security Plans for Two Proposed Facilities Sent to Board & Applicant.Telcon to Discuss Scheduling Matters Requested.W/O Encls ML20155H3621988-10-18018 October 1988 Requests Addl Info Re NRC Environ Assessments Submitted on 880914 for Uncontested Proceedings,To Complete Review of Adequacy of NEPA Assessments.Served on 881018 ML20204G0741988-10-17017 October 1988 Forwards Mh Mobley from State of Tn to NRC Not Received Until 881014.NRC Will Address Matters in Ltr in SER ML20205L2281988-10-12012 October 1988 Forwards AEOD/e807, Pump Damage Due to Low Flow Cavitation, in Response to Action Item 5 Assigned by EDO in 880406 Memo Re Diagnostic Evaluation Team Rept for Plant. NRR Issued Bulletin 88-004 Addressing Recirculation Problem ML20204J5841988-10-12012 October 1988 Forwards AEOD/E807, Pump Damage Due to Low Flow Cavitation, in Response to Item 5 of Actions Directed by EDO to Respond to Diagnostic Evaluation Team Rept.Nrr Issued Bulletin 88-004 Addressing Low Flow Problem ML20155C6941988-10-0505 October 1988 Advises That Review Briefing for Listed Plants Scheduled for 881013.Viewgraphs Encl ML20205Q4941988-10-0303 October 1988 Discusses Concerns Raised by State of Tn Re Abundance of Naturally Occurring Radioactivity in Alchemie Processing. Enrichment of Naturally Occurring Radioisotopes Will Not Pose Significant Health Hazard ML20206E0861988-09-28028 September 1988 Requests Verbal Concurrence W/Publishing Notice of Receipt of Petition for Rulemaking PRM-50-50,per 880926 Telcon W/ C Young.Related Info Encl 1990-02-26
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20205T6491988-11-0707 November 1988 Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20205R6731988-11-0404 November 1988 Forwards NRC Testimony of Jj Swift Addressing ASLB Inquiries of 881018 & Two Attachments.Related Correspondence ML20205N3691988-10-28028 October 1988 Advises That ASLB Tentatively Calling for Telcon on 881109 W/Parties & State of Tn to Discuss Need for Further Prehearing Conference & Other Scheduling Matters,Per 881026 Request.Served on 881031 ML20206B2481988-10-27027 October 1988 Notice of Significant Licensee Meeting 88-174 on 881118 in King of Prussia,Pa to Discuss Configuration Mgt ML20205K3321988-10-26026 October 1988 Forwards SER Re Const Mod & Licensing of & Application for CP for Facilities.Nrc Review of Safeguards/Security Plans for Two Proposed Facilities Sent to Board & Applicant.Telcon to Discuss Scheduling Matters Requested.W/O Encls ML20195B6131988-10-26026 October 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20155H3621988-10-18018 October 1988 Requests Addl Info Re NRC Environ Assessments Submitted on 880914 for Uncontested Proceedings,To Complete Review of Adequacy of NEPA Assessments.Served on 881018 ML20204G0741988-10-17017 October 1988 Forwards Mh Mobley from State of Tn to NRC Not Received Until 881014.NRC Will Address Matters in Ltr in SER ML20204J5841988-10-12012 October 1988 Forwards AEOD/E807, Pump Damage Due to Low Flow Cavitation, in Response to Item 5 of Actions Directed by EDO to Respond to Diagnostic Evaluation Team Rept.Nrr Issued Bulletin 88-004 Addressing Low Flow Problem ML20205L2281988-10-12012 October 1988 Forwards AEOD/e807, Pump Damage Due to Low Flow Cavitation, in Response to Action Item 5 Assigned by EDO in 880406 Memo Re Diagnostic Evaluation Team Rept for Plant. NRR Issued Bulletin 88-004 Addressing Recirculation Problem 1990-02-26
[Table view] |
Text
.
, # UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION IS File 8212 E .l REGION lli 790 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137 March 5, 1982 Contains ider.tity o' confidential scnce MEMORANDUM FOR: Region III Files, Midland ,
FROM: James E. Foster, Investigator
SUBJECT:
INFORMATION DEVELOPED, ALLEGATIONS RE WELDING AT MIDLAND (REFERENCE FOSTER MEMOS DATED 3/4/82, 3/5/82)
I was contacted by Ron Cook and Kavin Ward three times on March 3, 1982, to discuss their findings regarding allegations provided by E. Earl Kent, and determine further actions.
I was initially contacted at approximately 9:35 a.m. Cook and Ward had found that Kent had not been qualified to inspect welds at Midland, as he could not past the test for weld inspectors and was " erratic."
The licensee had advised that Bechtel had recently informed them an inspector named Morris had performed some questionable socket weld inspections.
Apparently, in December or January, it had been noticed that Morris had begun to make mistakes and transpositions on the welding documentation he was generating. It was then decided to inspect some of the welds he had inspected to insure that hardware errors had also not been made. When this inspection was done, it was found that some undersized socket welds had been accepted by Morris, and his inspector's qualification was revoked. The Midland Plant Quality Assurance Department was aware of the situation, and was preparing a program to reinspect the welds Morris had previously accepted to verify their acceptability. (This will be carried by Ward as an open item.)
Morris has been retrained and requalified.
I was recontacted at approximately 12:40 p.m. Cook and Ward had inspected the three welds described by Kent, and a sample of 26 additional socket welds.
The three welds described by Kent were fully acceptable, and of good appearance.
Ward indicated that the welds almost appeared machine produced, with no starts or stops evident. The additional sample of welds were also fully acceptable.
Discussion indicated that Kent had failed the Level I visual inspection qualification test. He had subsequently received additional training and orientation, but (according to site personnel) had spent much of his time indicating things he looked at "did not look right." He was given a second chance to pass the Level I visual qualification exam, and again failed the test. Also according to information from site personnel, Kent became loud and accusatory when confronted with his test failure, claiming that thousands of unacceptable welds had been accepted, and indicating he had vast expertise in the welding field.
DO ;TT D x ;,c :,
Cco u. , ~. i p r eg 8506250270 850418 PDR FOIA GARDE 85-213 PDR
Inv. EIS '8212 k , .
! b0 NOT DISCLOSE Contains identity CI confidential source
- Region III Files Midland 3/5/82 The third contact came at approximately 3:30 p.m. Vanderbosch had identified the 36 inch diameter steam line weld which Kent had questioned. Ward indicated the weld has an inservice inspection weld prep (ground weld), has a i slight mismatch which is fully acceptable for the line size, and has successfully passed an ultrasonic examination performed to assure minimum wall size. The weld was judgid fully acceptable. ~
s Discussion with licensee personnel indicated that a review by Hartford Steam
'l Boiler and Insurance Company of all containment liner plate weld radiography
.(welds performed by Southern Boiler Works) had indicated approximately 20 radiographs which appeared to have technique or quality defects. The total sample of containment liner plate welds numbers approximately 900. This issue is documented on a Nonconformance Report dated February 19, 1982, and a will be processed under the licensee's system.
- Ron Cook noted that it was true that many Midland pipe hangers are welded i only on the web, not on the flange, but he considers this acceptable per the
- forces placed on the hangers. No further review was indicated at present.
I briefly discussed Kent's comments on Bechtel welding specifications with 3
Cook, and he indicated that the concerns did not have any technical j ,
significance or validity.
^;M4 -
l James E. Foster Investigator i
$ DO NOT DISCLOSE Contains identity of confidential source
. .. gTLPC'K.
UNITED STATES 8 NUCLEAR REGULATORY COMMISSION g
. nEoioN iii i e, 799 ROOSEVELT ROAD _
GLEN ELLYN. lLLINOIS 80137 eeese luR 2 ' E82 Docket No. 50-329(DETP) '
Docket No. 50-330(DETP)
Consumers Power Company fj ATTN: Mr. James W. Cook Vice President Midland Project 1945 West Parnall Road ,
Jackson, MI 49201 Gentlemen: 7
' /[
This refers to the routine safety inspection conducted by Mr. K. D. War of this office on March 2-4, 1982, of activities at the Midland Plant, Units 1 and 2, authorized by NRC Construction Permits N CPPR-81 a No. CPPR-82 and to the discussion of our findings with Mr. .
and J
others at the conclusion of the inspection. -
The enclosed copy of our inspection report identifies areas examined ,
during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CTR 9.5(a)(4), it is necessary that you (a) notify this office by tele-phone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than seven (7) days are available for your review,
[ pS f -
(
- , jm v rs
1
.l usqa4"iill Consumers Power Company 2 6*
please notify this office promptly so that a new due date may be estab-lished. Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons which are the bases for the l claim that the information should be withheld from public disclosure.
- This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought l to be withheld shall be incorporated as far as possible into a separate l part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be plaped in the Public Document Room.
i We will gladly discuss any questions you have concerning this inspection.
i Sincerely,
/ /
. . E. Norelius, Director Division of Engineering and Technical Programs
Enclosure:
Inspection Report No. 50-329/82-04(DETP) and No. 50-330/82-04(DETP) cc w/ enc 1:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII I The Honorable Charles Bechhoefer, ASLB
! The Honorable Jerry Harbour, ASLB The Honorable Frederick P. Cowan, ASLB The Honorable Ralph S. Decker, ASLB Hichael Hiller l
Ronald Callen, Michigan l Public Service Commission l Myron H. Cherry Barbara Stamiris Mary Sinclair Wendell Marshall Steve J. Gadler i
G .
U.S. NUCLEAR REGULATORY COMMISSION REGION III Report No. 50-329/82-04(DETP); 50-330/82-04(DETP)
Docket No. 50-329; 50-330 License No. CPPR-81; CPPR-82 Licensee: Consumers Power Company 1945 W. Parnell Road Jackson, MI 49201 Facility Name: Midland Plant, Units 1 and 2 Inspection At: Midland Site, Midland, MI Inspection Conducted: March 2-4, 1982 MMut b~ I Inspector: ' K. D. Ward 3/'c/d>p Approved By:
/sN&al[%~~
D. H. Danielson, Chief 3/!' #/I'~
Materials & Processes Section Inspection Summary Inspection on March 2-4, 1982 (Report No. 50-329/82-04(DETP); 50-330/82-04(DETP))
Areas Inspected: Reports and radiographs of shop welds; previous inspection findings; nondestructive examination (NDE) personnel certifications of CPCo individuals; allegation. The inspection involved a total of 30 inspection-hours onsite by one NRC inspector.
- Results
- No items of noncompliance or deviations were identified.
e 4
y cg.
~
s .
pETAILS Persons Contacted Consumers Power Company (CPCo)
- B. Marguglio, Director QA
- R. Whitaker, Section Head - Fluids and Mechanical QA
- R. Davis, NDE/ Welding Group Supervisor QA M. Curland, QA Superintendent Bechtel Power Company (BPCo)
- M. Dietrich, Project QA Engineer D. Fredianelli, LWQCE W. Creel, LPMQCE A. Van Den Bosch, CQCE A. McClure, PQAE The inspector also contacted and interviewed other licensee and contractor employees.
- Denotes those attending the exit interview.
i Licensee Action on Previous Inspection Findings i .
(Closed) Deviation (329/80-01-02; 330/80-01-03): ""No positive way of track-ing design changes and assuring that completed work is modified in accordance with design changes and no procedure for handling design changes made after completion of.nork." The inspector reviewed the final response to RIII from CPCo dated May 15, 1980 and the following procedures which state the required information.
. Bechtel, Design Change Packages Interim Drawing Changes Notices, EDP14.47.1
. Bechtel, Tunctional Turnover of Systems, subsystems and Items,
! AAPD/PSPG-11.1 l
(Open) Unresolved Item (329/80-17-02; 330/80-19-02): " Radiographic linear indications of welds in two borated water storage tanks." In the Summer of,1982, the tanks may be drained and made available for radiography.
(0 pen) Unresolved Item (329/81-21-01): Possible altered radiographs.
Waiting results of RIV inspection of Grinnell. Four welds of altered radiographs were found out of 46,505 shop radiographic views reviewed on site.
2
~
i.
~
Functional or Program Areas Inspected
- 1. Allegations
- a. Region III received. allegations indirectly from an individual who was previously employed at the Midland site by Bechtel Power Corporation for the purpose of training to be a Level I weld inspector in accordance with Bechtel Quality Control Instruction, Level I Fabrication, Welding, Heat Treating and Nondestructive Examinations of ASME Section III - Piping, PW-100. The individual failed the Level 1 test two times and was terminated.
The allegations were as follows:
. Socket welds not being completely welded.
. A steam line weId had concavity.
. Problems in containment liner plate weld radiography.
BPCo had previously identified questionable areas in the inspec-tion efforts of one QC welding inspector assigned to inspect socket welds. CPCo was notified of the problem March 2, 1982.
BPCo is going to revieu 100% of the one QC welding inspector's efforts and random sample other inspector efforts in inspecting socket welds. CPCo may monitor the BPCo program. This is con-sidered an unresolved item (329/82-04-01; 330/82-04-01) and the inspector will review this in depth at the next inspection.
The inspector visually examined the following socket welds in accordance with ASME Section III, 1971 Edition, Summer 1973 Addenda.
Line # Field Weld # Diameter FSK-M-1HBC-58-2 FW50 2" 51 2" l "
56 2" 61 -
1" 62 1" 63 1" 64 2" 65 2" 88 2" 89 2"
. 90 2" 91 2" FSK-M-1MBC-57-5 10 2" 11 2" 12 2" 13 2" l
3
- - - - = . _ _ _ _ _ - _ . - . . . _-_= __--- ..
. . l
. s .
+
Line # Field Weld # Diameter FSK-M-2HBC-57-1 118 2" l
122 2" 123 -
2" 124 2" 125 2" 126 ~
2"
. 127 2" TSK-M-2HBC-57-1 128 2" 129 2" 130 2" 131 2" 1
132 2" l 133 2" The inspector visually examined steam line 2ELB-11 field weld 1, 36" diameter, nominal wall thickness 2.375". There is a slight i offset which met ASME Section III, 1971 Edition, Summer 1973 Addenda. The weld has been blended for inservice inspection and appeared to be acceptable.
CPCo recently contracted Hartford Steam and Boiler /NDT Engineering, i a company with qualified / certified radiographic film interpreters, to interpret the shop weld radiographs of Units 1 and 2 containment liner plates 100%. This consisted of approximately 900 views. The results of the review found that approximately 20 welds had weld
, quality or radiographic technique problems. The results'are docu-mented in nonconformance report #M-01-9-2-025 issued February 19, 1982.
t
- b. CPCo received four allegations concerning B&W NDE work from an individual previously employed at the Midland Site (File 16.0, Serial 98FWA80, dated April 11, 1980). Three of the allegations were closed (Reference NRC Report No. 50-329/80-27; 50-330/80-28 and No. 50-329/81-06; 50-330/81-06). The fourth allegation has
- not been resolved to date. CPCo management in Jackson, Michigan
! is reviewing the allegation and has hired Teledyne Engineering l Services to analyze the as-welded conditions for acceptability.
l l No items of noncompliance or deviations were identified.
l
- 2. Radiographic Review of Shop Radiographs (See NRC Report No. 329/81-21; 330/81-21 i
The inspector reviewed several nonconformance reports on the 46,505 shop radiographs reviewed in 1981. Approximately 50 items that were radiographed were found to be unacceptable in weld quality or radio-graphic techniques. The items are to be resolved in the near future.
t No items of noncompliance or deviations were identified.
l i
i 4
1
- 3. NDE Personnel Certifications The inspector reviewed the following CPCo NDE personnel certifications in accordance with SNT-TC-1A, 1975 Edition:
Name E _PT _MT R. Davis II II II -
T. Charette II II No items of noncompliance or deviations were identified.
- 4. Review of Shop Radiographs The inspector reviewed ra,diographs and reports of the following shop components.
- a. Radiography performed by ARMCo for Guyon Alloy Company in accordance with ASME Section III,1977 Edition, Winter 1978 Addenda.
System Weld Diameter Thickness Date RT SNO-8842 1P 12" 1.371" 8/8/80 SNO-8843 IP 12" 1.371" ~
8/8/80
- b. Radiography performed by Peabody Testing, X-Ray Engineering Compa.ny for Bechtel Corporation in accordance with ASME Section III, 1974 Edition, Summer 1974 Addenda.
Component Diameter Thickness Date RT 5346-14-1-8 Gate Valve 4" 1/8" - 1 1/2" 10/13/76
- c. Radiography performed by Taylor-Bonney Division for McJunkin Corporation in accordance with ASME Section III, 1977 Edition, l Winter 1978 Addenda.
l l
Component Weld Diameter Thickness Date RT j 90 Ell 802352 14 18" 0.395 12/17/79
- d. Radiography performed by ITT Grinnell Industrual Piping Inc. for CPCo in accordance with ASME Section III, 1971 Edition, Summer
. 1973 Addenda.
System Weld Diameter Thickness Date Rt 1
2CCB-6-S-604-9-L E 4" 0.593" 1/25/77 2HCB-2-5-613-5-11 CR3 18" 0.437" 8/9/76 5
G
j .*
e
! ~.
. 2ELB-11-S-632-1-1 BUZ 36" 1.379" 10/30/78 2HCB-16-S-604-6-2 C 6" 0.156" 6/22/77 2FCB-18-S-604-5-9 A 6" 0.312" 4/25/77 No items of noncompliance or deviations were identified.
i Unresolved Matters . .
Unresolved matters are items about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance, or deviations. Unresolved items disclosed during this inspection are discussed under the paragraph 1.a.
Exit Interview e
The inspector met with site representatives (denoted in Persons Contacted paragraph) at the conclusion of the inspection. The inspector summarized the scope and findings of the inspection noted in this report. The in-spector has been going on inspections to Hidland since September 1978 and i this was the most hostile exit interview ever encountered. The acting NDE and Welding Supervisor, Section Head, Fluids and Mechanical QA and the new Site QA Superintendent were very concerned with the socket weld
- problem noted in paragraph 1.a. The Site QA Superintendent informed the inspector prior to the exit that CPCo would establish an overview program to check into the welding and inspection of socket welds and qualification of QC personnel. However, at the exit this program was completely unac-ceptable to the QA Manager and Director. This matter is an unresolved item and this area will be reviewed indepth during a subsequent inspection.
~
l l
l r
I
\
5 e
6
_ _ _ ...-~. . _ _ _ _ . . _ _ ._- _ . . .- _ __ , _ - - _ _ _ _ _