{{#Wiki_filter:kCCESSIGlu NBP, FACIL'0 31 5 50-3ib AUTH, NAME SMITH>A.G.REC IP.NAf'lE DAVIS.A, B.REGULATQRE tJFQRMATIOt~~
{{#Wiki_filter:REGULATQRE       tJFQRMATIOt~~ DISTRIBUTION     S:EM   <RIDS) kCCESSIGlu      NBP,  S802ih0035         DGC. DATE: BS/02/05       NOTARIZED: NO         DOCKET FACIL'0      31 5  Dona'd C, Cook NucleaT Power Planti Unit ii Indiana                 05000315 50-3ib Donald C, Cook NucleaT PoweT P AUTHOR AFFILIATION lant'nit       2i Indiana   05000316 AUTH, NAME SMITH> A. G.            indiana Michigan Power       Co. < formerly Indiana '~ Michigan Ele REC IP. NAf'lE            RECIP IENT AFFILIATION DAVIS. A, B.                  Document Control Branch <Document Control Desk)
DISTRIBUTION S:EM<RIDS)DOCKET 05000315 05000316 S802ih0035 DGC.DATE: BS/02/05 NOTARIZED:
NO Dona'd C, Cook NucleaT Power Planti Unit ii Indiana Donald C, Cook NucleaT PoweT P lant'nit 2i Indiana AUTHOR AFFILIATION indiana Michigan Power Co.<formerly Indiana'~Michigan Ele RECIP IENT AFFILIATION Document Control Branch<Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Special rept: on SS0112~ionization Wire detectors declared inoperable.
Special rept: on SS0112~ ionization Wire detectors declared inoperable. Caused bg smoke geneTated bg extensive weldina taking place on aux liar's bldg crane. Detectors cleaned o.
Caused bg smoke geneTated bg extensive weldina taking place on aux liar's bldg crane.Detectors cleaned o.T eturned to svc upon comp l etion of crane upgrade proJect.DIS lRIBUTIGN CODE.IE22D COPIES RECEIVED: LTR ENCL SIZE: TITLE: 50.73 L censee Event Report<LER)i Incident Rpt.etc.RECIPI.p''ID CODE/NAME PD3-3 LA~)IGG ING>Gr,)D'NTERtAAL; ACRS l'l I CHE SOD AEQD/DQA AEQD/DSP/RQAB ARM/DC1S/DAB tiRR/DLST/ADS NRR/DEBT/"".
T eturned to svc upon comp l etion of crane upgrade proJect.
LB NRR/DES l/t'tEB NRR/DEST/PSB NRR/DEBT/SGB NRR/DL: G/3<<B NRR/DRFP/t:AB NRR/DRIS,"~IB REG F.Le./c.slI RGti3 F ILE 01, 0 E~r.TERt'~AL".
DIS lRIBUTIGN CODE. IE22D COPIES RECEIVED: LTR                     ENCL     SIZE:
EG~~G GROH t)H ST LOBBY WARD NRC PDR NSIC MAYS G CGP IES l TTR Et'1 1 2 1 I 1 1 1 REC IP IENT ID CODE/NAME PD3-3 PD ACRS MOELLER AEGD/DSP/N*S AEQD/DSP/TPAB DEDRO NRR/DEST/CEB NRR/DEST/ICSB twRR/DEST/MTB NRR/DEST/RSB NRR/DLPG/HFB ERR/DQEA/EAB NRR/DREP/RPB ERR/P t'tAS/ILRB RES TELFORDi J RES/DRPS DIR FORD BLDG HGY A LPDR NSIC HARRiS>J COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 TOTAL NUMBER OF COPIES R QUIRED."LTTP, 46 ENCL Indiana Michigan Power Company Cook Huciear PianI PO 8ox 458 Bndgrna" I'/~I 49106 616 46~)5991 February 5, 1988 Z lNDlANA NICHlGAN POEM Donald C.Cook Nuclear Plant Unit Nos.1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Attn: A.B.Davis  
TITLE: 50. 73 L censee Event Report <LER)i Incident Rpt.                   etc.
RECIPI .p''           CGP  IES          REC IP IENT            COPIES ID CODE/NAME            l TTR Et'        ID CODE/NAME         LTTR ENCL PD3-3 LA                                   PD3-3 PD
                ~)IGG ING Gr,) D
'NTERtAAL; ACRS l'l I CHE SOD               1            ACRS MOELLER AEQD/DQA                     1            AEGD/DSP/N*S              1 AEQD/DSP/RQAB                 2            AEQD/DSP/TPAB              1 ARM/DC1S/DAB                 1            DEDRO                      1 tiRR/DLST/ADS                             NRR/DEST/CEB              1 NRR/DEBT/"". LB                           NRR/DEST/ICSB              1 NRR/DES l /t'tEB               I          twRR/DEST/MTB              1 NRR/DEST/PSB                 1            NRR/DEST/RSB              1 NRR/DEBT/SGB                               NRR/DLPG/HFB              1 NRR/DL: G/3<<B                             ERR/DQEA/EAB NRR/DRFP/t:AB                             NRR/DREP/RPB NRR/DRIS,"~IB                             ERR/P t'tAS/ ILRB          1 REG F .Le.         0        1            RES TELFORDi    J        1
                        / c.slI             1            RES/DRPS    DIR          1 RGti3     F ILE   01, E~r. TERt'~AL". EG~~G GROH t)                             FORD BLDG HGY A H ST LOBBY WARD                           LPDR NRC PDR                                   NSIC HARRiS> J NSIC MAYS G TOTAL NUMBER OF COPIES             R QUIRED."LTTP,     46   ENCL
 
Indiana Michigan Power Company Cook Huciear PianI PO 8ox 458 Z
Bndgrna" I'/~I 49106 616 46~) 5991 lNDlANA NICHlGAN POEM February 5, 1988 Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 U.S. Nuclear Regulatory Commission Document           Control Desk Washington, D. C. 20555 Attn:         A. B. Davis
 
==Dear Mr. Davis:==


==Dear Mr.Davis:==
This special report is being submitted as required by Technical Specification Sections 3.3.3.7b for Unit 1 and 3.3.3.8b for Unit 2 to inform you that the Auxiliary Building 650'levation Fire Detection System is not operable as required by Technical Specification Section 3.3.3.7 and 3.3.3.8 for Units 1 and 2, respectively.
This special report is being submitted as required by Technical Specification Sections 3.3.3.7b for Unit 1 and 3.3.3.8b for Unit 2 to inform you that the Auxiliary Building 650'levation Fire Detection System is not operable as required by Technical Specification Section 3.3.3.7 and 3.3.3.8 for Units 1 and 2, respectively.
The ionization fire detectors for this area were declared inoperable on January 12, 1988, due to the smoke generated by the extensive welding taking place on the Auxiliary Building crane.Due to the smoke, the fire detectors have become dirty and will not reset when the smoke is cleared from the area.Because the welding is continuing on a 20 to 24 hour a day basis, we will not attempt to clean the detectors and return them to service until the completion of the Auxiliary Building crane upgrade project.Zt is expected that the detectors can be returned to service by March 31, 1988.Fire watches, as required by Technical Specification Sections 3.3.3.7 and 3.3.3.8 for Units 1 and 2, respectively, were promptly initiated and will be maintained until the Fire Detection System is returned to service.Respectfully, W.G.Smith, Ur.Plant Manager/bab cc: See Attached Distribution 8802160035 880205 PDR ADOCK 05000315 S PDR CC'.D.H.Williams, Jr.R:.B~Davis, Region III M.P.Alexich R;F.Kroeger H.B.Brugger R.W.Jurgensen NRC Resident Inspector D.L.Wigginton, NRC R.C.Callen G.Charnoff, Esq.Dottie Sherman, ANI Library D.Hahn INPO PNSRC A.A.Blind P.A.Barrett/P.
The     ionization fire detectors for this area were declared inoperable on January 12, 1988, due to the smoke generated by the extensive welding taking place on the Auxiliary Building crane. Due to the smoke, the fire detectors have become dirty and will not reset when the smoke is cleared from the area. Because the welding is continuing on a 20 to 24 hour a day basis, we will not attempt to clean the detectors and return them to service until the completion of the Auxiliary Building crane upgrade project. Zt is expected that the detectors can be returned to service by March 31, 1988.
Lauzau}}
Fire watches, as required by Technical Specification Sections 3.3.3.7 and 3.3.3.8 for Units 1 and 2, until the Fire Detection System is returnedwill respectively, were promptly initiated and           be maintained to service.
Respectfully, W.G.     Smith,     Ur.
Plant Manager
  /bab cc: See Attached Distribution 8802160035 880205 PDR     ADOCK 05000315 S                         PDR
 
CC '. D. H. Williams, Jr.
R:. B~ Davis, Region III M. P. Alexich R; F. Kroeger H. B. Brugger R. W. Jurgensen NRC Resident Inspector D. L. Wigginton, NRC R. C. Callen G. Charnoff, Esq.
Dottie Sherman, ANI Library D. Hahn INPO PNSRC A. A. Blind P. A. Barrett/P. Lauzau}}

Latest revision as of 01:56, 4 February 2020

Special Rept:On 880112,ionization Fire Detectors Declared Inoperable.Caused by Smoke Generated by Extensive Welding Taking Place on Auxiliary Bldg Crane.Detectors Cleaned & Returned to Svc Upon Completion of Crane Upgrade Project
ML17326B338
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/05/1988
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Davis A
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8802160035
Download: ML17326B338 (3)


Text

REGULATQRE tJFQRMATIOt~~ DISTRIBUTION S:EM <RIDS) kCCESSIGlu NBP, S802ih0035 DGC. DATE: BS/02/05 NOTARIZED: NO DOCKET FACIL'0 31 5 Dona'd C, Cook NucleaT Power Planti Unit ii Indiana 05000315 50-3ib Donald C, Cook NucleaT PoweT P AUTHOR AFFILIATION lant'nit 2i Indiana 05000316 AUTH, NAME SMITH> A. G. indiana Michigan Power Co. < formerly Indiana '~ Michigan Ele REC IP. NAf'lE RECIP IENT AFFILIATION DAVIS. A, B. Document Control Branch <Document Control Desk)

SUBJECT:

Special rept: on SS0112~ ionization Wire detectors declared inoperable. Caused bg smoke geneTated bg extensive weldina taking place on aux liar's bldg crane. Detectors cleaned o.

T eturned to svc upon comp l etion of crane upgrade proJect.

DIS lRIBUTIGN CODE. IE22D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: 50. 73 L censee Event Report <LER)i Incident Rpt. etc.

RECIPI .p CGP IES REC IP IENT COPIES ID CODE/NAME l TTR Et' ID CODE/NAME LTTR ENCL PD3-3 LA PD3-3 PD

~)IGG ING Gr,) D

'NTERtAAL; ACRS l'l I CHE SOD 1 ACRS MOELLER AEQD/DQA 1 AEGD/DSP/N*S 1 AEQD/DSP/RQAB 2 AEQD/DSP/TPAB 1 ARM/DC1S/DAB 1 DEDRO 1 tiRR/DLST/ADS NRR/DEST/CEB 1 NRR/DEBT/"". LB NRR/DEST/ICSB 1 NRR/DES l /t'tEB I twRR/DEST/MTB 1 NRR/DEST/PSB 1 NRR/DEST/RSB 1 NRR/DEBT/SGB NRR/DLPG/HFB 1 NRR/DL: G/3< J NSIC MAYS G TOTAL NUMBER OF COPIES R QUIRED."LTTP, 46 ENCL

Indiana Michigan Power Company Cook Huciear PianI PO 8ox 458 Z

Bndgrna" I'/~I 49106 616 46~) 5991 lNDlANA NICHlGAN POEM February 5, 1988 Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Attn: A. B. Davis

Dear Mr. Davis:

This special report is being submitted as required by Technical Specification Sections 3.3.3.7b for Unit 1 and 3.3.3.8b for Unit 2 to inform you that the Auxiliary Building 650'levation Fire Detection System is not operable as required by Technical Specification Section 3.3.3.7 and 3.3.3.8 for Units 1 and 2, respectively.

The ionization fire detectors for this area were declared inoperable on January 12, 1988, due to the smoke generated by the extensive welding taking place on the Auxiliary Building crane. Due to the smoke, the fire detectors have become dirty and will not reset when the smoke is cleared from the area. Because the welding is continuing on a 20 to 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day basis, we will not attempt to clean the detectors and return them to service until the completion of the Auxiliary Building crane upgrade project. Zt is expected that the detectors can be returned to service by March 31, 1988.

Fire watches, as required by Technical Specification Sections 3.3.3.7 and 3.3.3.8 for Units 1 and 2, until the Fire Detection System is returnedwill respectively, were promptly initiated and be maintained to service.

Respectfully, W.G. Smith, Ur.

Plant Manager

/bab cc: See Attached Distribution 8802160035 880205 PDR ADOCK 05000315 S PDR

CC '. D. H. Williams, Jr.

R:. B~ Davis, Region III M. P. Alexich R; F. Kroeger H. B. Brugger R. W. Jurgensen NRC Resident Inspector D. L. Wigginton, NRC R. C. Callen G. Charnoff, Esq.

Dottie Sherman, ANI Library D. Hahn INPO PNSRC A. A. Blind P. A. Barrett/P. Lauzau