ML17056B300: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/31/1990
| issue date = 07/31/1990
| title = Revised Monthly Operating Rept for Jul 1990 for Nine Mile Point Nuclear Station Unit 1
| title = Revised Monthly Operating Rept for Jul 1990 for Nine Mile Point Nuclear Station Unit 1
| author name = DAHLBERG K A
| author name = Dahlberg K
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  
Line 15: Line 15:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:OPERATING DATA REPORT                          DOCKET NO.: 50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
: 1. Unit Name: Nine Mile Point Unit Pl
: 2. Reporting Period: 7/I/90 through 7/31/90                                    Notes
: 3. Licensed Thermal Power (MWt):                        1850
: 4. Nameplate Rating (Gross MWe):                          640 S. Design  Electrical Rating (Net MWe):                  620
: 6. Maximum Dependable Capacity (Gross MWe):              630
: 7. Maximum    Dependable  Capacity (Net MWe):          610
: 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,    If Any (Net MWe):
: 10. Reasons For Restrictions,  IfAny:
This Month        Yr-to-Date        Cumulative
: 11. Hours in Reporting Period                                    744.0            5,087.0,        182,976.2
: 12. Number    of Hours Reactor Was Critical                      29.8                29.8          115,264.1
                                                                                            '.0
: 13. Reactor Reserve Shutdown Hours                                0.0                                1,204.2
: 14. Hours Generator On-Line                                        0.0                0.0          112,117.2
: 15. Unit Reserve Shutdown Hours                                  0.0                0.0              20.4 16.. Gross Thermal Eneigy Generated (MWH)                        115.0              115.0      188,473,247.0
: 17. Gross Electrical Energy Generated (MW@                        0.0                0.0      62,473,070.0
: 18. Net Electrical Energy Generated (MWH)                          0.0                0.0      60,524,382,0
: 19. Unit Service Factor                                          0.0                0.0              61.3
: 20. Unit Availability Factor                                      0.0                0.0              61.3
: 21. Unit Capacity Factor (Using MDC Net)                          0.0                0.0              54.2
: 22. Unit Capacity Factor (Using DER Net)                          0.0                0.0              53.4
: 23. Unit Forced Outage Rate                                    100.0              100.0              26.1
: 24. Shutdowns Scheduled Over Next 6 Months (1'ype, Date and Duration of Each):
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:  Power Ascension Testin
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast        Achieved IN1TIALCRlTICAL1TY IN1TIALELECTRIClTY COMMERCIAL OPERATION 9102200099 910207 PDR      ADOCK 05000220 R                          PDR
I
    'I f}}

Latest revision as of 07:41, 30 October 2019

Revised Monthly Operating Rept for Jul 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B300
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/31/1990
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200099
Download: ML17056B300 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit Pl
2. Reporting Period: 7/I/90 through 7/31/90 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640 S. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744.0 5,087.0, 182,976.2
12. Number of Hours Reactor Was Critical 29.8 29.8 115,264.1

'.0

13. Reactor Reserve Shutdown Hours 0.0 1,204.2
14. Hours Generator On-Line 0.0 0.0 112,117.2
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4 16.. Gross Thermal Eneigy Generated (MWH) 115.0 115.0 188,473,247.0
17. Gross Electrical Energy Generated (MW@ 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382,0
19. Unit Service Factor 0.0 0.0 61.3
20. Unit Availability Factor 0.0 0.0 61.3
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 54.2
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 53.4
23. Unit Forced Outage Rate 100.0 100.0 26.1
24. Shutdowns Scheduled Over Next 6 Months (1'ype, Date and Duration of Each):
25. If Shut Down At End of Report Period, Estimated Date of Startup: Power Ascension Testin
26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved IN1TIALCRlTICAL1TY IN1TIALELECTRIClTY COMMERCIAL OPERATION 9102200099 910207 PDR ADOCK 05000220 R PDR

I

'I f