ML17056B307: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/31/1989
| issue date = 12/31/1989
| title = Revised Monthly Operating Rept for Dec 1989 for Nine Mile Point Nuclear Station
| title = Revised Monthly Operating Rept for Dec 1989 for Nine Mile Point Nuclear Station
| author name = DAHLBERG K A
| author name = Dahlberg K
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATING STATUSOPERATING DATAREPORTDOCKETNO.:50-220DATE:1/31/91COMPLETED BY:K.A.DahlbergTELEPHONE:
{{#Wiki_filter:OPERATING DATA REPORT                          DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
(315)349-24431.UnitName:NineMilePointUnit¹12.Reporting Period:12/1/89through12/31/893.LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):6405.DesignElectrical Rating(NetMWe):6206.MaximumDependable Capacity(GrossMWe):6307.MaximumDependable Capacity(NetMWe):6108.IfChangesOccurinCapacityRatings(ItemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative 11.HoursinReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated
: 1. Unit Name: Nine Mile Point Unit ¹1
~19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(I'ype,DateandRefueloutaestartedonanua221988.744.00.00.00.00.00.00.00.00.00.00.00.0100.0DurationofEach):8,760.00.0,0.00.00.00.00.00.00.00.00.00.0100.0177,889.2 115,234.3 1,204.2112,117420A188,473,132.0 62,473,070.0 60,524,382.0 63.063.055.854.923,625.IfShutDownAtEndofReportPeriod,Estimated DateofStartup:March7199026.UnitisTestStatus(PriortoCommercial Operation):
: 2. Reporting Period: 12/1/89 through 12/31/89                                  Notes
ForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 9102200118 910207PDRADOCK05000220RPDR 4O4,a}}
: 3. Licensed Thermal Power (MWt):                       1850
: 4. Nameplate Rating (Gross MWe):                         640
: 5. Design Electrical Rating (Net MWe):                   620
: 6. Maximum Dependable Capacity (Gross MWe):             630
: 7. Maximum Dependable Capacity (Net MWe):               610
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,   IfAny (Net MWe):
: 10. Reasons For Restrictions,   IfAny:
This Month        Yr-to-Date       Cumulative
: 11. Hours  in Reporting Period                                  744.0            8,760.0        177,889.2
: 12. Number  of Hours Reactor Was Critical                        0.0                0.0,        115,234.3
: 13. Reactor Reserve Shutdown Hours                                0.0                0.0          1,204.2
: 14. Hours Generator On-Line                                      0.0                0.0        112,1174
: 15. Unit Reserve Shutdown Hours                                  0.0                0.0              20A
                                    ~
: 16. Gross Thermal Energy Generated (MWH)                          0.0                0.0    188,473,132.0
: 17. Gross Electrical Energy Generated (MWH)                      0.0                0.0      62,473,070.0
: 18. Net Electrical Energy Generated                              0.0                 0.0      60,524,382.0
: 19. Unit Service Factor                                          0.0                0.0              63.0
: 20. Unit Availability Factor                                      0.0                0.0              63.0
: 21. Unit Capacity Factor (Using MDC Net)                          0.0                0.0              55.8
: 22. Unit Capacity Factor (Using DER Net)                          0.0                 0.0             54.9
: 23. Unit Forced Outage Rate                                    100.0              100.0              23,6
: 24. Shutdowns Scheduled Over Next 6 Months (I'ype, Date and Duration of Each):
Refuel outa e started on anua      22 1988.
: 25. IfShut Down At End of Report Period, Estimated Date of Startup:   March 7 1990
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast        Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 9102200118 910207 PDR      ADOCK 05000220 R                          PDR
 
4O 4
    ,a}}

Latest revision as of 07:41, 30 October 2019

Revised Monthly Operating Rept for Dec 1989 for Nine Mile Point Nuclear Station
ML17056B307
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/31/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200118
Download: ML17056B307 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit ¹1
2. Reporting Period: 12/1/89 through 12/31/89 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744.0 8,760.0 177,889.2
12. Number of Hours Reactor Was Critical 0.0 0.0, 115,234.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
14. Hours Generator On-Line 0.0 0.0 112,1174
15. Unit Reserve Shutdown Hours 0.0 0.0 20A

~

16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated 0.0 0.0 60,524,382.0
19. Unit Service Factor 0.0 0.0 63.0
20. Unit Availability Factor 0.0 0.0 63.0
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 55.8
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 54.9
23. Unit Forced Outage Rate 100.0 100.0 23,6
24. Shutdowns Scheduled Over Next 6 Months (I'ype, Date and Duration of Each):

Refuel outa e started on anua 22 1988.

25. IfShut Down At End of Report Period, Estimated Date of Startup: March 7 1990
26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 9102200118 910207 PDR ADOCK 05000220 R PDR

4O 4

,a