{{#Wiki_filter:OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:
{{#Wiki_filter:OPERATING DATA REPORT                           DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
(315)349-2443 1.Unit Name: Nine Mile Point Unit¹1 2.Reporting Period: 12/1/89 through 12/31/89 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (Items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated~19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (I'ype, Date and Refuel outa e started on anua 22 1988.744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Duration of Each): 8,760.0 0.0, 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 177,889.2 115,234.3 1,204.2 112,1174 20A 188,473,132.0 62,473,070.0 60,524,382.0 63.0 63.0 55.8 54.9 23,6 25.If Shut Down At End of Report Period, Estimated Date of Startup: March 7 1990 26.Unit is Test Status (Prior to Commercial Operation):
: 1. Unit Name: Nine Mile Point Unit ¹1
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9102200118 910207 PDR ADOCK 05000220 R PDR 4O 4 ,a}}
: 2. Reporting Period: 12/1/89 through 12/31/89                                 Notes
: 3. Licensed Thermal Power (MWt):                       1850
: 4. Nameplate Rating (Gross MWe):                         640
: 5. Design Electrical Rating (Net MWe):                   620
: 6. Maximum Dependable Capacity (Gross MWe):             630
: 7. Maximum Dependable Capacity (Net MWe):               610
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,   IfAny (Net MWe):
: 10. Reasons For Restrictions,   IfAny:
This Month         Yr-to-Date       Cumulative
: 11. Hours in Reporting Period                                 744.0            8,760.0        177,889.2
: 12. Number   of Hours Reactor Was Critical                       0.0                0.0,        115,234.3
: 13. Reactor Reserve Shutdown Hours                               0.0                0.0          1,204.2
: 14. Hours Generator On-Line                                       0.0                0.0        112,1174
: 15. Unit Reserve Shutdown Hours                                   0.0                0.0              20A
                                    ~
: 16. Gross Thermal Energy Generated (MWH)                         0.0                0.0    188,473,132.0
: 17. Gross Electrical Energy Generated (MWH)                       0.0                0.0      62,473,070.0
: 18. Net Electrical Energy Generated                               0.0                0.0      60,524,382.0
: 19. Unit Service Factor                                           0.0                0.0              63.0
: 20. Unit Availability Factor                                     0.0                0.0              63.0
: 21. Unit Capacity Factor (Using MDC Net)                         0.0                0.0              55.8
: 22. Unit Capacity Factor (Using DER Net)                         0.0                0.0              54.9
: 23. Unit Forced Outage Rate                                     100.0              100.0              23,6
: 24. Shutdowns Scheduled Over Next 6 Months (I'ype, Date and Duration of Each):
Refuel outa e started on anua       22 1988.
: 25. IfShut Down At End of Report Period, Estimated Date of Startup:   March 7 1990
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast       Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 9102200118 910207 PDR       ADOCK 05000220 R                           PDR
 
4O 4
    ,a}}

Latest revision as of 07:41, 30 October 2019

Revised Monthly Operating Rept for Dec 1989 for Nine Mile Point Nuclear Station
ML17056B307
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/31/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200118
Download: ML17056B307 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit ¹1
2. Reporting Period: 12/1/89 through 12/31/89 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744.0 8,760.0 177,889.2
12. Number of Hours Reactor Was Critical 0.0 0.0, 115,234.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
14. Hours Generator On-Line 0.0 0.0 112,1174
15. Unit Reserve Shutdown Hours 0.0 0.0 20A

~

16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated 0.0 0.0 60,524,382.0
19. Unit Service Factor 0.0 0.0 63.0
20. Unit Availability Factor 0.0 0.0 63.0
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 55.8
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 54.9
23. Unit Forced Outage Rate 100.0 100.0 23,6
24. Shutdowns Scheduled Over Next 6 Months (I'ype, Date and Duration of Each):

Refuel outa e started on anua 22 1988.

25. IfShut Down At End of Report Period, Estimated Date of Startup: March 7 1990
26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 9102200118 910207 PDR ADOCK 05000220 R PDR

4O 4

,a