ML17056B308: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/30/1989
| issue date = 11/30/1989
| title = Revised Monthly Operating Rept for Nov 1989 for Nine Mile Point Nuclear Station Unit 1
| title = Revised Monthly Operating Rept for Nov 1989 for Nine Mile Point Nuclear Station Unit 1
| author name = DAHLBERG K A
| author name = Dahlberg K
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATING STATUSOPERATING DATAREPORTDOCKETNO.:50-220DATE:1/31/91COMPLETED BY:K.A.DnhlbergTELEPHONE:
{{#Wiki_filter:OPERATING DATA REPORT                            DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
(315)349-24431.UnitName:NineMilePointUnit//12.Reporting Period:11/1/89through11/30/893.LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):6405.DesignElectrical Rating(NetMWe):6206.MaximumDependable Capacity(GrossMWe):6307.MaximumDependable Capacity(NetMWe):6108.IfChangesOccurinCapacityRatings(itemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative 11.HoursinReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MViGQ18.NetElectrical EnergyGenerated (Mugr19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6MonthsRefueloutaetnrtedonanua22I720.00.00.00.00.00.00.00.00.00.00.00.0100.0(Type,DateandDurationofEach):88.8,016.00.00.00.00.00.00.00.00.00.00.00.0100.0177,145.2 115,234.3 1,204,2112,117.2 20.4188,473,132.0 62,473,070.0 60,524,382.0 63.363.356.055.123.225.IfShutDownAtEndofReportPeriod,Estimated DateofStartup:FebiaI1026.UnitisTestStatus(PriortoCommercial Operation):
: 1. Unit Name: Nine Mile Point Unit //1
ForecastAchievedINlTIALCR1TICAL1TY IN1TIALELECTRICITY COMMERCIAL OPERATION 9102200119 910207PDRADOCK05000220RPDR gÃ}}
: 2. Reporting Period: 11/1/89 through 11/30/89                                  Notes
: 3. Licensed Thermal Power (MWt):                       1850
: 4. Nameplate Rating (Gross MWe):                         640
: 5. Design Electrical Rating (Net MWe):                   620
: 6. Maximum Dependable Capacity (Gross MWe):             630
: 7. Maximum    Dependable Capacity (Net MWe):             610
: 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,   IfAny (Net MWe):
: 10. Reasons For Restrictions,   IfAny:
This Month          Yr-to-Date       Cumulative
: 11. Hours  in Reporting Period                                720.0              8,016.0        177,145.2
: 12. Number  of Hours Reactor Was Critical                        0.0                  0.0        115,234.3
: 13. Reactor Reserve Shutdown Hours                                0.0                  0.0          1,204,2
: 14. Hours Generator On-Line                                      0.0                  0.0        112,117.2
: 15. Unit Reserve Shutdown Hours                                  0.0                  0.0              20.4
: 16. Gross Thermal Energy Generated (MWH)                          0.0                  0.0    188,473,132.0
: 17. Gross Electrical Energy Generated (MViGQ                      0.0                  0.0     62,473,070.0
: 18. Net Electrical Energy Generated  (Mugr 0.0                  0.0      60,524,382.0
: 19. Unit Service Factor                                          0.0                  0.0              63.3
: 20. Unit Availability Factor                                      0.0                  0.0              63.3
: 21. Unit Capacity Factor (Using MDC Net)                          0.0                  0.0              56.0
: 22. Unit Capacity Factor (Using DER Net)                          0.0                 0.0             55.1
: 23. Unit Forced Outage Rate                                    100.0                100.0              23.2
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration    of Each):
Refuel outa e tnrted on anua        22 I 88.
: 25. If Shut Down At End of Report Period, Estimated Date of Startup: Feb ia I      1  0
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast        Achieved INlTIALCR1TICAL1TY IN1TIALELECTRICITY COMMERCIAL OPERATION 9102200119 910207 PDR      ADOCK 05000220 R                          PDR
 
gÃ}}

Latest revision as of 07:41, 30 October 2019

Revised Monthly Operating Rept for Nov 1989 for Nine Mile Point Nuclear Station Unit 1
ML17056B308
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/30/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200119
Download: ML17056B308 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit //1
2. Reporting Period: 11/1/89 through 11/30/89 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 720.0 8,016.0 177,145.2
12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204,2
14. Hours Generator On-Line 0.0 0.0 112,117.2
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
17. Gross Electrical Energy Generated (MViGQ 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated (Mugr 0.0 0.0 60,524,382.0
19. Unit Service Factor 0.0 0.0 63.3
20. Unit Availability Factor 0.0 0.0 63.3
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 56.0
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 55.1
23. Unit Forced Outage Rate 100.0 100.0 23.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuel outa e tnrted on anua 22 I 88.

25. If Shut Down At End of Report Period, Estimated Date of Startup: Feb ia I 1 0
26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INlTIALCR1TICAL1TY IN1TIALELECTRICITY COMMERCIAL OPERATION 9102200119 910207 PDR ADOCK 05000220 R PDR