ML17056B308: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dnhlberg TELEPHONE:
{{#Wiki_filter:OPERATING DATA REPORT                           DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
(315)349-2443 1.Unit Name: Nine Mile Point Unit//1 2.Reporting Period: 11/1/89 through 11/30/89 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MViGQ 18.Net Electrical Energy Generated (Mug r 19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months Refuel outa e tnrted on anua 22 I 720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each): 88.8,016.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 177,145.2 115,234.3 1,204,2 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 63.3 63.3 56.0 55.1 23.2 25.If Shut Down At End of Report Period, Estimated Date of Startup: Feb ia I 1 0 26.Unit is Test Status (Prior to Commercial Operation):
: 1. Unit Name: Nine Mile Point Unit //1
Forecast Achieved INlTIAL CR1TICAL1TY IN1TIAL ELECTRICITY COMMERCIAL OPERATION 9102200119 910207 PDR ADOCK 05000220 R PDR gÃ}}
: 2. Reporting Period: 11/1/89 through 11/30/89                                   Notes
: 3. Licensed Thermal Power (MWt):                       1850
: 4. Nameplate Rating (Gross MWe):                         640
: 5. Design Electrical Rating (Net MWe):                   620
: 6. Maximum Dependable Capacity (Gross MWe):             630
: 7. Maximum   Dependable Capacity (Net MWe):             610
: 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,   IfAny (Net MWe):
: 10. Reasons For Restrictions,   IfAny:
This Month         Yr-to-Date       Cumulative
: 11. Hours in Reporting Period                                 720.0              8,016.0        177,145.2
: 12. Number   of Hours Reactor Was Critical                       0.0                  0.0        115,234.3
: 13. Reactor Reserve Shutdown Hours                               0.0                  0.0          1,204,2
: 14. Hours Generator On-Line                                       0.0                  0.0        112,117.2
: 15. Unit Reserve Shutdown Hours                                   0.0                  0.0              20.4
: 16. Gross Thermal Energy Generated (MWH)                         0.0                  0.0    188,473,132.0
: 17. Gross Electrical Energy Generated (MViGQ                     0.0                  0.0      62,473,070.0
: 18. Net Electrical Energy Generated (Mugr 0.0                  0.0      60,524,382.0
: 19. Unit Service Factor                                           0.0                  0.0              63.3
: 20. Unit Availability Factor                                     0.0                  0.0              63.3
: 21. Unit Capacity Factor (Using MDC Net)                         0.0                  0.0              56.0
: 22. Unit Capacity Factor (Using DER Net)                         0.0                  0.0              55.1
: 23. Unit Forced Outage Rate                                     100.0                100.0              23.2
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration   of Each):
Refuel outa e tnrted on anua        22 I 88.
: 25. If Shut Down At End of Report Period, Estimated Date of Startup: Feb ia I     1   0
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast         Achieved INlTIALCR1TICAL1TY IN1TIALELECTRICITY COMMERCIAL OPERATION 9102200119 910207 PDR       ADOCK 05000220 R                         PDR
 
gÃ}}

Latest revision as of 07:41, 30 October 2019

Revised Monthly Operating Rept for Nov 1989 for Nine Mile Point Nuclear Station Unit 1
ML17056B308
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/30/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200119
Download: ML17056B308 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dnhlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Point Unit //1
2. Reporting Period: 11/1/89 through 11/30/89 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 720.0 8,016.0 177,145.2
12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204,2
14. Hours Generator On-Line 0.0 0.0 112,117.2
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
17. Gross Electrical Energy Generated (MViGQ 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated (Mugr 0.0 0.0 60,524,382.0
19. Unit Service Factor 0.0 0.0 63.3
20. Unit Availability Factor 0.0 0.0 63.3
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 56.0
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 55.1
23. Unit Forced Outage Rate 100.0 100.0 23.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuel outa e tnrted on anua 22 I 88.

25. If Shut Down At End of Report Period, Estimated Date of Startup: Feb ia I 1 0
26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INlTIALCR1TICAL1TY IN1TIALELECTRICITY COMMERCIAL OPERATION 9102200119 910207 PDR ADOCK 05000220 R PDR