| issue date = 03/31/1989
| issue date = 03/31/1989
| title = Revised Monthly Operating Rept for Mar 1989 for Nine Mile Point Nuclear Station Unit 1
| title = Revised Monthly Operating Rept for Mar 1989 for Nine Mile Point Nuclear Station Unit 1
| author name = DAHLBERG K A
| author name = Dahlberg K
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:'tx OPERATING S ATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:
{{#Wiki_filter:'tx OPERATING DATA REPORT                           DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING      S  ATUS
(315)349-2443 l.Unit Name: Nine Mile Point Unit//1 2.Reporting Period: 3/1/89 through 3/31/89 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)'23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months R fuel u a e tarted on anua 22 1 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each): 88.2,160.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 171,2892 115)2342 1,204.2 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 65.5 65.5 57.9 57.0 20.0 26.Unit is Test Status (Prior to Commercial Operation):
: l. Unit Name: Nine Mile Point Unit //1
Forecast Achieved INlTIAL CRlTICAL1TY IN1TIAL ELECTRIC1TY COMMERCIAL OPERATION 9l.02O7 PDR ADOCK.PDR Q22QQ l~3 Q5QQO220 R P, VR 4~l}}
: 2. Reporting Period: 3/1/89 through 3/31/89                                   Notes
: 3. Licensed Thermal Power (MWt):                       1850
: 4. Nameplate Rating (Gross MWe):                       640
: 5. Design Electrical Rating (Net MWe):                 620
: 6. Maximum Dependable Capacity (Gross MWe):             630
: 7. Maximum Dependable Capacity (Net MWe):               610
: 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,   IfAny (Net MWe):
: 10. Reasons For Restrictions,   IfAny:
This Month         Yr-to-Date       Cumulative
: 11. Hours   in Reporting Period                                 744.0              2,160.0        171,2892
: 12. Number of Hours Reactor Was Critical                           0.0                0.0        115)2342
: 13. Reactor Reserve Shutdown Hours                                 0.0                0.0          1,204.2
: 14. Hours Generator On-Line                                       0.0                0.0        112,117.2
: 15. Unit Reserve Shutdown Hours                                   0.0                0.0              20.4
: 16. Gross Thermal Energy Generated (MWH)                           0.0                0.0    188,473,132.0
: 17. Gross Electrical Energy Generated (MWH)                       0.0                0.0      62,473,070.0
: 18. Net Electrical Energy Generated (MWH)                         0.0                0.0      60,524,382.0
: 19. Unit Service Factor                                           0.0                0.0              65.5
: 20. Unit Availability Factor                                       0.0                0.0              65.5
: 21. Unit Capacity Factor (Using MDC Net)                           0.0                0.0              57.9
: 22. Unit Capacity Factor (Using DER Net)                           0.0                 0.0             57.0
'23. Unit Forced Outage Rate                                    100.0               100.0             20.0
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration   of Each):
R fuel u a e tarted on anua        22 1 88.
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast       Achieved INlTIALCRlTICAL1TY IN1TIALELECTRIC1TY COMMERCIAL OPERATION l    9l.02O7 Q22QQ ~3 Q5QQO220 ADOCK PDR                    . PDR R
 
P, VR 4 ~l}}

Latest revision as of 07:41, 30 October 2019

Revised Monthly Operating Rept for Mar 1989 for Nine Mile Point Nuclear Station Unit 1
ML17056B316
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/31/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200133
Download: ML17056B316 (2)


Text

'tx OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING S ATUS

l. Unit Name: Nine Mile Point Unit //1
2. Reporting Period: 3/1/89 through 3/31/89 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744.0 2,160.0 171,2892
12. Number of Hours Reactor Was Critical 0.0 0.0 115)2342
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
14. Hours Generator On-Line 0.0 0.0 112,117.2
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0
19. Unit Service Factor 0.0 0.0 65.5
20. Unit Availability Factor 0.0 0.0 65.5
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 57.9
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 57.0

'23. Unit Forced Outage Rate 100.0 100.0 20.0

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

R fuel u a e tarted on anua 22 1 88.

26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INlTIALCRlTICAL1TY IN1TIALELECTRIC1TY COMMERCIAL OPERATION l 9l.02O7 Q22QQ ~3 Q5QQO220 ADOCK PDR . PDR R

P, VR 4 ~l