ML17056B316: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/31/1989 | | issue date = 03/31/1989 | ||
| title = Revised Monthly Operating Rept for Mar 1989 for Nine Mile Point Nuclear Station Unit 1 | | title = Revised Monthly Operating Rept for Mar 1989 for Nine Mile Point Nuclear Station Unit 1 | ||
| author name = | | author name = Dahlberg K | ||
| author affiliation = NIAGARA MOHAWK POWER CORP. | | author affiliation = NIAGARA MOHAWK POWER CORP. | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:'tx OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING S ATUS | |||
: l. Unit Name: Nine Mile Point Unit //1 | |||
: 2. Reporting Period: 3/1/89 through 3/31/89 Notes | |||
: 3. Licensed Thermal Power (MWt): 1850 | |||
: 4. Nameplate Rating (Gross MWe): 640 | |||
: 5. Design Electrical Rating (Net MWe): 620 | |||
: 6. Maximum Dependable Capacity (Gross MWe): 630 | |||
: 7. Maximum Dependable Capacity (Net MWe): 610 | |||
: 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted, IfAny (Net MWe): | |||
: 10. Reasons For Restrictions, IfAny: | |||
This Month Yr-to-Date Cumulative | |||
: 11. Hours in Reporting Period 744.0 2,160.0 171,2892 | |||
: 12. Number of Hours Reactor Was Critical 0.0 0.0 115)2342 | |||
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2 | |||
: 14. Hours Generator On-Line 0.0 0.0 112,117.2 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 20.4 | |||
: 16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0 | |||
: 17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0 | |||
: 18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0 | |||
: 19. Unit Service Factor 0.0 0.0 65.5 | |||
: 20. Unit Availability Factor 0.0 0.0 65.5 | |||
: 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 57.9 | |||
: 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 57.0 | |||
'23. Unit Forced Outage Rate 100.0 100.0 20.0 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): | |||
R fuel u a e tarted on anua 22 1 88. | |||
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INlTIALCRlTICAL1TY IN1TIALELECTRIC1TY COMMERCIAL OPERATION l 9l.02O7 Q22QQ ~3 Q5QQO220 ADOCK PDR . PDR R | |||
P, VR 4 ~l}} |
Latest revision as of 06:41, 30 October 2019
ML17056B316 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 03/31/1989 |
From: | Dahlberg K NIAGARA MOHAWK POWER CORP. |
To: | |
Shared Package | |
ML17056B295 | List: |
References | |
NUDOCS 9102200133 | |
Download: ML17056B316 (2) | |
Text
'tx OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING S ATUS
- l. Unit Name: Nine Mile Point Unit //1
- 2. Reporting Period: 3/1/89 through 3/31/89 Notes
- 3. Licensed Thermal Power (MWt): 1850
- 4. Nameplate Rating (Gross MWe): 640
- 5. Design Electrical Rating (Net MWe): 620
- 6. Maximum Dependable Capacity (Gross MWe): 630
- 7. Maximum Dependable Capacity (Net MWe): 610
- 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.0 2,160.0 171,2892
- 12. Number of Hours Reactor Was Critical 0.0 0.0 115)2342
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Hours Generator On-Line 0.0 0.0 112,117.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
- 16. Gross Thermal Energy Generated (MWH) 0.0 0.0 188,473,132.0
- 17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0
- 18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0
- 19. Unit Service Factor 0.0 0.0 65.5
- 20. Unit Availability Factor 0.0 0.0 65.5
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 57.9
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 57.0
'23. Unit Forced Outage Rate 100.0 100.0 20.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
R fuel u a e tarted on anua 22 1 88.
- 26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INlTIALCRlTICAL1TY IN1TIALELECTRIC1TY COMMERCIAL OPERATION l 9l.02O7 Q22QQ ~3 Q5QQO220 ADOCK PDR . PDR R
P, VR 4 ~l