ML17325A486: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/24/1987
| issue date = 11/24/1987
| title = Ro:On 871124,fire Suppression Water Sys Inoperable.Caused by Planned Isolation of Portion of East Leg of Outside Fire Protection Ring Header to Facilitate Installation of Fire Protection Isolation Valve.Backup Fire Protection Available
| title = Ro:On 871124,fire Suppression Water Sys Inoperable.Caused by Planned Isolation of Portion of East Leg of Outside Fire Protection Ring Header to Facilitate Installation of Fire Protection Isolation Valve.Backup Fire Protection Available
| author name = SMITH W G
| author name = Smith W
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = DAVIS A B
| addressee name = Davis A
| addressee affiliation = NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| addressee affiliation = NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCESSIONNBRFACIL:50-31550-316AUTH.NAt'tESMITHS'.Q.RECIP.NAMEDAVIS'.B.REQULATURYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)8712020351DOC.DATE:87/11/24NOTARIZED:NODOCKET0DonaldC.CookNuclearPoeerPlant'nitiiIndiana~~!05000315DonaldC.CookNuclearPoeerPlantiUnit2iIndiana505000316AUTHORAFFILIATIONIndianaMichiganPoeerCo.(formerlgIndiana~~MichiganEleRECIPIENTAFFILIATIONDocumentControlBranch(DocumentControlDesk)
{{#Wiki_filter:REQULATURY INFORMATION DISTRIBUTION SYSTEM                  (RIDS)
ACCESSION NBR 8712020351            DOC. DATE:     87/11/24    NOTARIZED:  NO            DOCKET 0 FACIL: 50-315 Donald C. Cook Nuc lear Poeer P              lant'nit Planti  Unit ii Indiana 2i  Indiana
                                                                                          ~~! 05000315 05000316 50-316 Donald C. Cook Nuclear              Poeer                                5 AUTH. NAt'tE          AUTHOR AFF ILI      AT I ON SMITHS'. Q.           Indiana Michigan Poeer Co. (former lg Indiana                ~~
Michigan Ele RECIP. NAME          RECIP    IENT  AFFILIATION DAVIS'. B.                Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
RQ:on871124fir'esuppressioneatersosinoperable.Causedbgplannedisolationof.portionofeastlegofoutsidefireprotectionringheader.Backupfireprotectionavailablefromnearbyfirehydrants'~plantfiretruck.DISTRIBUTIONCODE:IE22DCOPIESRECEIVED:LTRtENCL0SIZE:TITLE:50.73LicenseeEventReport(LER)iIncidentRptietc.NOTES:RECIPIENTIDCODE/MANEPD3-3LAWIGQINGTQNiDCOPIESLTTRENCL11RECIPIENTIDCODE/MANEPD3-3PDCQPIESLTTRENCLINTERNAL:ACRSNiCHFLSONAEOD/DOAAEOD/DBP/ROADARN/DCTS/DABNRR/DEBT/ADSNRR/DEBT/ELBNRR/DEBT/NEBNRR/DES"/PSBNRR/DEST/SGB-NRR/DLPG/GABNRR/DREP/RABS/SB02RESTELFQRDiJRGN3FILE01EXTERNAL:EG8cGGROH)MLPDRNSICHARRIS'ACRSNOELLERAEQD/DSP/NAS*EOD/DSP/TPABDEDRONRR/DEBT/CEBNRR/DEST/ICSBNRR/DEST/NTBNRR/DEBT/RSBNRR/DLPG/HFBNRR/DOEA/EABNRR/DREP/RPBNRR/PtRAS/ILRBRESDEPYGIRES/DE/EI8HSTLQB13YWARDNRCPDRNSICMAYST'TOTALNUNBEROFCOP1ESREQUIRED:LTTR45ENCL
RQ: on 871124 f ir'e suppression eater sos inoperable. Caused bg planned isolation of.por tion of east leg of outside f ir e pr otection ring header. Backup fire pr otection available from nearby  fire    hydrants  '~ plant f ire truck.
DISTRIBUTION CODE: IE22D COPIES RECEIVED: LTR t ENCL                      0  SIZE:
TITLE: 50. 73 Licensee Event Report (LER)i Incident Rpti                    etc.
NOTES:
RECIPIENT            COPIES                RECIPIENT            CQP  IES ID CODE/MANE          LTTR ENCL            ID CODE/MANE        LTTR ENCL PD3-3 LA                    1              PD3-3 PD WIGQINGTQNi D                1 INTERNAL: ACRS NiCHFLSON                                ACRS NOELLER AEOD/DOA                                    AEQD/DSP/NAS AEOD/DBP/ROAD                                *EOD/DSP/TPAB ARN/DCTS/DAB                                DEDRO NRR/DEBT/ADS                                NRR/DEBT/CEB NRR/DEBT/ELB                                NRR/DEST/ I CSB NRR/DEBT/NEB                                NRR/DEST/NTB NRR/DES"/PSB                                NRR/DEBT/RSB NRR/DEST/SGB-                                NRR/DLPG/HFB NRR/DLPG/GAB                                NRR/DOEA/EAB NRR/DREP/RAB                                NRR/DREP/RPB S/S  B                            NRR/P tRAS/ ILRB 02                      RES DEPY GI RES TELFQRDi      J                          RES/DE/E I 8 RGN3      FILE      01 EXTERNAL:  EG8cG  GROH) M                              H  ST LQB13Y WARD LPDR                                        NRC PDR NSIC HARRIS'                                NSIC  MAYST' TOTAL NUNBER OF COP1ES REQUIRED:             LTTR      45  ENCL


IndianaMichiganPowerCompanyCookNuciearPlantP.O.Box458Bridgman.Ml491066164655901November24,1987INDIANAMICHIGAhfPOWERDonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74U.S.NuclearRegulatoryCommissionDocument,ControlDeskWashington,D.C.20555Attn:A.B.Davis
Indiana Michigan Power Company Cook Nuciear Plant P.O. Box 458 Bridgman. Ml 49106 616 465 5901 INDIANA MICHIGAhf November 24, 1987                                      POWER Donald C. Cook Nuclear Plant Unit Nos.         1  and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 U.S. Nuclear Regulatory Commission Document,       Control Desk Washington, D. C. 20555 Attn:       A. B. Davis


==DearMr.Davis:==
==Dear Mr. Davis:==
ThisistoconfirmaverbalreportmadetoMr.BruceBurgess-ofyourstaffat1140hoursonNovember24,1987.AtthattimeMr.BurgesswasinformedthattheFireSuppressionWaterSystemwasnotoperableasrequiredbyTechnicalSpecification3.7.9.1.bduetotheplannedisolationofaportionoftheeastlegoftheoutsidefireprotectionringheader.ThisisolationwasrequiredtofacilitateinstallationoffireprotectionisolationvalveforthenewcontractorsaccesscontrolbuildingthatisbeingconstructedfortheSteamGeneratorReplacementProject.TheinstallationoftheisolationvalveisexpectedtobecompletedwithintwodaysandtheFireProtectionSystemreturnedtoservicebyNovember26,1987.ThedelugesystemforthePreferredReserveSourcePowerTransformer(TR-201-AB)wasremovedfromserviceduetotheisolationofthissectionofFireProtectionpiping.Twofirehydrantswithintheprotectedareawerealsoremovedfromservice.Backupfireprotectionisavailablefromnearbyfirehydrantsandtheplantfiretruck.ThisletterwillfulfilltherequirementsofTechnicalSpecification3.7.9.1actionb.2bwhichrequiresafollowupreportnolaterthanthefirst.workingday871202035187ii24PDRADOCK05000315SPDR followingtheeventandTechnicalSpecification3.7.9.1actionb.2cthatrequiresafollowupreportwithinfourteendays.Respectfully,W.G.Smith,Jr.PlantManager:afhcc:J.E.DolanA.B.Davis,RegionIIIM.P.AlexichR.F.KroegerH.B.BruggerR.W.JurgensenNRCResidentInspectorD.L.Wigginton,NRCR.C.CallenG.Charnoff,Esq.D.HahnINPOPNSRCA.A.BlindDottieSherman,ANILibraryP.A.Barrett/B.P.Lauzau 1Ci}}
 
This is to confirm a verbal report made to Mr. Bruce Burgess-of your staff at 1140 hours on November 24, 1987. At that time Mr. Burgess was informed that the Fire Suppression Water System was not operable as required by Technical Specification 3.7.9.1.b due to the planned isolation of a portion of the east leg of the outside fire protection ring header. This isolation was required to facilitate installation of fire protection isolation valve for the new contractors access control building that is being constructed for the Steam Generator Replacement Project.
The installation of the isolation valve is expected to be completed within two days and the Fire Protection System returned to service by November 26, 1987.
The deluge system        for the Preferred Reserve Source Power Transformer (TR-201-AB) was removed from service due to the isolation of this section of Fire Protection piping.
Two fire hydrants within the protected area were also removed from service.         Backup fire protection is available from nearby fire hydrants and the plant fire truck.
This      letter will fulfillthe requirements of Technical Specification 3.7.9.1 action b.2b which requires a follow up report no later than the first. working day 8712020351 87ii24 PDR  ADOCK 05000315 S                PDR
 
following the event and Technical Specification 3.7.9.1 action b.2c that requires a follow up report within fourteen days.
Respectfully, W. G. Smith, Jr.
Plant Manager
:afh cc:   J. E. Dolan A. B. Davis, Region  III M. P. Alexich R. F. Kroeger H. B. Brugger R. W. Jurgensen NRC  Resident Inspector D. L. Wigginton, NRC R. C. Callen G. Charnoff, Esq.
D. Hahn INPO PNSRC A. A. Blind Dottie Sherman, ANI Library P. A. Barrett/B. P. Lauzau
 
1 C
i}}

Latest revision as of 06:52, 29 October 2019

Ro:On 871124,fire Suppression Water Sys Inoperable.Caused by Planned Isolation of Portion of East Leg of Outside Fire Protection Ring Header to Facilitate Installation of Fire Protection Isolation Valve.Backup Fire Protection Available
ML17325A486
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/24/1987
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Davis A
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8712020351
Download: ML17325A486 (5)


Text

REQULATURY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR 8712020351 DOC. DATE: 87/11/24 NOTARIZED: NO DOCKET 0 FACIL: 50-315 Donald C. Cook Nuc lear Poeer P lant'nit Planti Unit ii Indiana 2i Indiana

~~! 05000315 05000316 50-316 Donald C. Cook Nuclear Poeer 5 AUTH. NAt'tE AUTHOR AFF ILI AT I ON SMITHS'. Q. Indiana Michigan Poeer Co. (former lg Indiana ~~

Michigan Ele RECIP. NAME RECIP IENT AFFILIATION DAVIS'. B. Document Control Branch (Document Control Desk)

SUBJECT:

RQ: on 871124 f ir'e suppression eater sos inoperable. Caused bg planned isolation of.por tion of east leg of outside f ir e pr otection ring header. Backup fire pr otection available from nearby fire hydrants '~ plant f ire truck.

DISTRIBUTION CODE: IE22D COPIES RECEIVED: LTR t ENCL 0 SIZE:

TITLE: 50. 73 Licensee Event Report (LER)i Incident Rpti etc.

NOTES:

RECIPIENT COPIES RECIPIENT CQP IES ID CODE/MANE LTTR ENCL ID CODE/MANE LTTR ENCL PD3-3 LA 1 PD3-3 PD WIGQINGTQNi D 1 INTERNAL: ACRS NiCHFLSON ACRS NOELLER AEOD/DOA AEQD/DSP/NAS AEOD/DBP/ROAD *EOD/DSP/TPAB ARN/DCTS/DAB DEDRO NRR/DEBT/ADS NRR/DEBT/CEB NRR/DEBT/ELB NRR/DEST/ I CSB NRR/DEBT/NEB NRR/DEST/NTB NRR/DES"/PSB NRR/DEBT/RSB NRR/DEST/SGB- NRR/DLPG/HFB NRR/DLPG/GAB NRR/DOEA/EAB NRR/DREP/RAB NRR/DREP/RPB S/S B NRR/P tRAS/ ILRB 02 RES DEPY GI RES TELFQRDi J RES/DE/E I 8 RGN3 FILE 01 EXTERNAL: EG8cG GROH) M H ST LQB13Y WARD LPDR NRC PDR NSIC HARRIS' NSIC MAYST' TOTAL NUNBER OF COP1ES REQUIRED: LTTR 45 ENCL

Indiana Michigan Power Company Cook Nuciear Plant P.O. Box 458 Bridgman. Ml 49106 616 465 5901 INDIANA MICHIGAhf November 24, 1987 POWER Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 U.S. Nuclear Regulatory Commission Document, Control Desk Washington, D. C. 20555 Attn: A. B. Davis

Dear Mr. Davis:

This is to confirm a verbal report made to Mr. Bruce Burgess-of your staff at 1140 hours0.0132 days <br />0.317 hours <br />0.00188 weeks <br />4.3377e-4 months <br /> on November 24, 1987. At that time Mr. Burgess was informed that the Fire Suppression Water System was not operable as required by Technical Specification 3.7.9.1.b due to the planned isolation of a portion of the east leg of the outside fire protection ring header. This isolation was required to facilitate installation of fire protection isolation valve for the new contractors access control building that is being constructed for the Steam Generator Replacement Project.

The installation of the isolation valve is expected to be completed within two days and the Fire Protection System returned to service by November 26, 1987.

The deluge system for the Preferred Reserve Source Power Transformer (TR-201-AB) was removed from service due to the isolation of this section of Fire Protection piping.

Two fire hydrants within the protected area were also removed from service. Backup fire protection is available from nearby fire hydrants and the plant fire truck.

This letter will fulfillthe requirements of Technical Specification 3.7.9.1 action b.2b which requires a follow up report no later than the first. working day 8712020351 87ii24 PDR ADOCK 05000315 S PDR

following the event and Technical Specification 3.7.9.1 action b.2c that requires a follow up report within fourteen days.

Respectfully, W. G. Smith, Jr.

Plant Manager

afh cc: J. E. Dolan A. B. Davis, Region III M. P. Alexich R. F. Kroeger H. B. Brugger R. W. Jurgensen NRC Resident Inspector D. L. Wigginton, NRC R. C. Callen G. Charnoff, Esq.

D. Hahn INPO PNSRC A. A. Blind Dottie Sherman, ANI Library P. A. Barrett/B. P. Lauzau

1 C

i