ML20209J225

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation of Util 831107 & 850816 Responses to Generic Ltr 83-28,Item 1.1, Post-Trip Review Program & Procedure. Program & Procedure Acceptable.Item 1.1 Resolved
ML20209J225
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 11/05/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20209J228 List:
References
GL-83-28, LSO5-85-11-010, LSO5-85-11-10, NUDOCS 8511110403
Download: ML20209J225 (3)


Text

-. __ ..

NOV 0 512 Docket No. 50-155 DISTRIBUTION LS05-85-ll-010 4 Docket J11e $GHolahan NRC PDR ABournia ORB #5 Rdg DShum Mr. Kenneth W. Berry PThompson Director, Nuclear Licensing OELD Consumers Power Ccmpany EJordan 1945 West Parnall Road BGrimes Jackson, PicFican 49201 JPartlow TRotella

Dear Mr. Berry:

CJamerson ACRS (10)

JZwolinski SUSJECT: SAFETY EVALUATION FOR GENERIC LETTER 83-78, ITEM 1.1, POST TRIP REVIEW PROGRAM DESCRIPTION AND PROCEDURE Re: Big Rock Point Plant Ey Cereric Letter 83-28, dated July 8, 1983, you were requested to respond 4

to certain generic concerns that developed from the investigation into the ,

failure of scram circuit breakers at the Salem Nuclear Power Plant, Unit 1.

These ccncerns are categorized into four areas: (1) Post Trip Review; (2) Equipment Classification and Vendor Interface; (3) Post-Faintenarce Testirp; ard (4) Peactor Trip System Reliability Improvements. Your response to these four areas of Generic Letter 83-28 was provided by letters dated November 7, 1983 and August 16, 1985.

We have completed cur review of your response to Item 1.1 of Generic Letter 83-28 relating to Post Trip Peview Program and Procedure. The results of -

our review are provided in the enclosed Safety Evaluation. Based on our review, we find that your Post Trip Peview Program and Procedure reet the guidelines c'escribed in the enclosure and are, therefore, acceptable. We consider Item 1.1 of Generic Letter 83-28 to be rescived.

Sincerely, 3 d d est stiAE8 W John A. Zwolinski, Chief Operating Reactors Branch ho. 5 Division of Licensing

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page i

DL:0RB#5h DL:0RB#5 M DL:0RB#5 CJarrersono TRotella:tm J7wolinski 1(/r /85 g 14/ F /65 14/g/E5 8511110403 851105 PDR ADOCK 05000155 l P PDR

i

  1. o UNITED STATES

, g 3 o NUCLEAR REGULATORY COMMISSION L ;E WASHINGTON, D. C. 20555

    • November 5,1985 Docket No. 50-155 LS05-85-11 -010 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road ,.

Jackson, Michigan 49201

Dear Mr. Berry:

SUBJECT:

SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 1.1, POST TRIP PEVIEW PROGRAP DESCRIPTION AND PROCEDURE Re: Big Rock Point Plant By Generic Letter 83-28, dated July 8, 1983, you were requested to respond to certain generic concerns that developed from the investigation into the failure of scram circuit breakers at the Salem Nuclear Power Plant, Unit 1.

These concerns are categorized into four areas: (1) Post Trip Review; (2) Equipment Classification and Vendor Interface; (3) Post-Maintenance Testing; and (4) Reactor Trip System Reliability Improvements. Your response to these four areas of Generic Letter 83-28 was provided by letters dated November 7, 1983 and August 16, 1985.

We have completed our review of your response to Item 1.1 of Generic Letter 83-28 relating to Post Trip Review Program and Procedure. The results of our review are provided in the enclosed Safety Evaluation. Based on our review, we find that your Post Trip Peview Program and Procedure meet the

, guidelines described in the enclosure and are, therefore, acceptable. We consider Item 1.1 of Generic Letter 83-28 to be resolved.

Sincerely, l

\

9 w U ,

John . holinski, Chief Opera ing Reactors Branch No. 5 Division of Licensing

Enclosure:

Safety Evaluatien cc w/ enclosure:

See next page

Mr. Kenneth W. Berry Consumers Power Company Big P.cck Point Plant cc:

Mr. Thomas A. McNish, Secretary Consumers Power Company 21? t!est Michigan Avenue Jackson, Fichigan 49201 Judd L. Bacon, Esquire Consumers Power Cerpany 21P Vest Michigan Avenue Jackson, Fichigan 49201 .-

Bio Rock Point Plant ATTN: Mr. David P. Hoffman Plant Superintendent Poute 3 Fast Office Box 591 Charlevoix, Michigan 49720 Mr. I. Lee l'oerland Chairman, Board of Commissioners P. O. Box 218 Charlevoix, Michigan t9720 Office of the Governor Room 1 - Capitol Building Larsirg, Michigan 48913 Regional Administrator huclear Regulatory Commission, Region III 799 Peosevelt Road Glen Ellyn, Illinois E0137 Nuclear Facilities and Environmental Monitorir.g Section Office Division of Radiological Pealth P. O. Box 30035 Lansing, Michigan 48909 Resident Inspector Big Ferk Point Plant c/o U.S. NPC RR #3, Box 600 Charlevoix, Michigan 49720

-- ._ -_ . , . _ . _. , _ . - _ . - . - . - - . . . . _ - . - - - . , - -