Forwards Safety Evaluation for Proposed Spent Fuel Pool Expansion at Facility,Per 860425 Application for Amend to License DPR-28.Emergency Standby Sys Must Be Installed & Tested for Safety Evaluation to Be Valid
ML20204F722
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/14/1988
From: Rooney V
Office of Nuclear Reactor Regulation
To: Capstick R
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20204F725 List:
References
TAC-69179, NUDOCS 8810210627
Download: ML20204F722 (4)


Text

____ _ _ _ _ _ _ _ -_ _ _ _ _ _ _ __ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

'- / p tsey'o, UNITED 8TATEs l

! -

  • 7- NUCLE AR REGULATORY COMMISSION

. WASHINGTON, D. C. 20666 N ..... )! mn l

Docket No. 50-271 Mr. R. W. Capstick Licensing Engineer r Vement Yankee Nuclear Power Corporation i 1671 Worcester Poad Framinoham Massachusetts 0170' t

Dear Mr. Capstick:

I sitPJECT: SPENT FUEL POOL EXPANSION SAFETY EVALVATION (TAC NO. 69179)

The Comission has issued the enclosed Safety Evaluation for the proposed i

expansion of the spent fuel pool at the Yemont Yankee Nuclear Power Station.

The Safety Evaluation pertains to your application for license arnendment dated April 25, 1986, as supplemented on Auaust 1.5. September 26. October 21 und  !

November 24. 1986; and February 25. March 31. April 9. April 13. May 22. June '

11. September 1. and December 11, 19871 and March 2 and June 7. 1988.  !

On May 20. 1988 the staff issued License Amendrent No. 104, which authorized  !

you to place new racks in the pool to accomodate 7870 assemblies, and to store J fuel in the racks, not to exceed the presently authorized 2000 assemblies. On June 7, 1988. you wrote a letter to the NRC forwarding a document relating to  ;

)

your connitment to provide an enhanced spent fuel pool cooling system. The staff  !

i has examined the safety considerations of the installation and operation of  !

such a system, with storage in the spent fuel storage pool of the proposed 2870 ,

assent. lies and includes e discussion of these matters in the enclosed Safety .

I Evalua tion. l f

l The Environmental Assessment related to the proposed amen #ent was transmitted  !

. to you on July 25, 198P. The Notice of Environeental Assessment and finding i of No Significant Impact was published in the Federal Register on fugust 1.  !

I 1

1988 (53 FR 78925).

(

f j

(

l k

I

{

I i i  !

~

8910210627 SG1014 f}

l E6 ADOCK OSO { 1 i I

t l i i

l 50

  • 7(

i l 2 I l

l i We understand that your plans do not call for installation of the Emergency l

Standby System (ES$) in the near future. Our Safety Evaluation assumes the
  • installation of the ESS to handle the heat load if more than 2000 asserblies l

! are stored. For this reason, the ESS must be installed and tested to

, demonstrate operability for the conclusiens of the Safety Evaluation to be f 1 valid. You will note that we have not issued the license amendment authorizing 1 the storage of more than 2,000 assemblies.  !

Sincerely, l DdglR$1 SIgfled by:

r i

l l Vernon I.. Rooney, Project Manager .

a Project Directorate 1 3 1 Division of Reactor Projects I/II

Enclosure:

i As Stated l cc: See next page  !

a i 1

J I

l l

t i i i i

I l 1 I

i Distribution: Decket Flie, ARC 1 Local PDRs, PDI.3 r/f, RWessman, EBoger JWiggins Region I ,Rushbrook, , 7,VRooney, p g , 5, A. d o g A toOGC. Rec)ville EJorda dp

, t c P r;t- w o u s co we occW(c A)

, t orc :PDI.3 9' :FDI.3 DI.3/DIR :0GC (  :  :  :

Jq

.....:. 3 4 o.....:......[7 NAME:MRushbok":(Roerey:ck :RWess a

.....:...........:d...........:....d788 DATE :\D/\ ' 88  : / 07B8  : 60/  : / /88  :  :  :

r r 0FFICIAL RECORD COPY

0 1

Mr. R. W. Capstick Vermont Yankee Nuclear Power Corporation Vermont Yankee Nuclear Power Station cc:

Mr. J. Gary Weigand W. P. Murphy, Vice President President & Chief Executive Officer and Manager of Operations

, Vermont Yankee Nuclear Power Corp. Vermont Yankee Nuclear Power Corp.

R.D. 5. Box 169 R.D. 5. Box 169

'y Ferry Road Ferry Road Brattleboro, Vermont 05301 Brattleboro, Vermont 05301 Mr. John DeVincentis, Vice President Mr. George Sterzinger, Commissioner Yankee Atomic: Electric Company Vermont Department of Public Service 1671 Worcester Road 120 State Street, 3rd Floor Framingham, Massachusetts 01701 Pcntpelier, Vermont 05602

(

New England Coalition on Nuclear Public Service Board Pollution State of Vermont Hill and Dale Farm 120 State Street R.D. 2. Box 223 Montpelier, Vermont 05602 Putney, Vermon; 05346 Vermont Public Interest Research Group, Inc. G. Dean Weyman 43 State Street Chairman, Board of Selectman Montnelier, Vermont 05602 Post Office Box 116 Vernon, Verment 05354 William Russell, Regional Administrator Raymond N. McCandless Region I Office Vermont Division of Occupational U.S. Nuclear Pegulatory Commission and Radiological Health 475 Allendale Road Administration Building King of Prussia, Pennsylvania 19406 Montpelier, Vermont 05602 Mr. R. W. Capstick Honorable Joho J. Easton Vermont Yankee Nuclear Attorney General Power Corporation State of Vermont 1671 Korcester Road 109 State Street Framingham, Massachusetts 01701 Montpelier, Vermont 05602 R. K. Gad III Ropes & Gray Conner A Wetterhahn, P.C.

225 Franklin Street Suite 1050 Bostan, Massachusetts 02110 1747 Pennsylvania Avenue, N.W.

Washington, D.C. 20006 1

Vermont Yankee Nuclear Power Vermont Yankee Nuclear Power Station Corporation cc:

Ellyn R. Weiss, Esq. Resident Inspector Harmon & Weiss U.S. Nuclear Regulatory Comission 2001 S Street, N.W. P.O. Box 176 Washington, D.C. 20009 Vernon, Vermont 05354 Samuel H. Press, Esq. Carol S. Sneider, Esq.

c/o Vermont Dept. of Public Service Assistant Attorney General 120 State Street Office of the Attorney General Montpelier, VT 05602 One Ashburton Place, 19th Floor Boston, MA 02108 Jay Gutierrez Geoffrey M. Huntington, Esquire Regional Counsel Office of the Attorney General USNRC, Region I Environmental Protection Bureau 475 Allendale Road State House Annex King of Prussia, PA 19406 25 Capitol Street Concord, NH 03301-6397 G. Dana Bisbee, Esa. Charles Bechhoefer, Esq.

Office of the Attorney General Administrative Judge Environmental Protection Bureau Atomic Safety and Licensing Board State House Annex U.S. Nuclear Regulatory Comission 25 Capitol Street Washington, DC 20555 Concord, NH 03301-6397 Dr. James H. Carpenter Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Comission U.S. Nuclear Regulatory Comission Washington, DC 20555 Washington, DC 20555 Mr. Glenn 0. Bright Adjudicatory File (2)