ML20197B383

From kanterella
Jump to navigation Jump to search
Ack Receipt of Transmitting Changes to Site Emergency Plan,Vol 9,Rev 80,including Revs to App a & Chapters 7 & 8.Changes Consistent W/Provision of 10CFR50.54(q) & Acceptable
ML20197B383
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/08/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Buckman F
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8605130012
Download: ML20197B383 (2)


Text

.

s 4e-MAY 8 1986 Docket No. 50-155 Consumers Power Company ATTN: Dr. F. W. Buckman Vice President Nuclear Operations 212 West Michigan Avenue Jackson, MI 49201 Gentlemen:

This is to acknowleJ p receipt of your letter dated April 2, 1986 which transmitted changes to tne Big Rock Point Site Emergency Plan, Volume 9, Revision 80 including revisions to Appendix A and Chapters 7 and 8. We have reviewed the changes to the plan and determined that the changes are consistent with the requirements of 10 CFR 50.54(q) and do not decrease the effectiveness of your plan.

Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan. However, if your safety review indicates no decrease in emergency preparedness effectiveness, then changes can be made without prior NRC approval. In all cases, you must furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V (Implementing Procedures).

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC's Public Document Room.

f Iv hN 0 #

ge988Mt Maanr F

Consumers Power Company 2 MAY 8 1986 If you have any questions concerning this letter, please contact Mr. James P. Patterson of my staff at (312) 790-5536.

Sincerely,

$l,hlhM1 v W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch cc: Mr. Kenneth W. Berry, Director Nuclear Licensing D. P. Hoffman, Plant Superintendent DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Comission Nuclear Facilities and Environmental Monitoring Section W. Weaver, FEMA, RV D. Matthews, OIE, EPB RIII .

RIII RIII. 'y Patt /kst %neQ1 S Boyd haffr"