ML20072Q645

From kanterella
Jump to navigation Jump to search
Special Rept 90-010:on 901128,containment Equipment Hatch Open for More than Seven Days During Refueling Outage.Hatch Closed on 901201,per Tech Spec 3.7.12
ML20072Q645
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/20/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
90-010, 90-10, NUDOCS 9012260267
Download: ML20072Q645 (2)


Text

-

1 i, Alabama Power Company 40 inverness Center Parkway g'. ,

Post Offree Box 1295 Birmingham, Alabama 35201 l

  • Telephone 205 868-5581 W. G. Hairston, til Senior Vice President Nuclear Operations AlabamaPower I December 20, 1990 tre sautwn ewire sniem Docket No. 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, D. C. 20555 Joseph H. Farley Nuclear Plant - Unit 2 Special Report No.90-010, Fire Barrier Penetration Open For More Than Seven Days Gentlemen:

In accordance with the requirements of Technical Specification 3.7.12, the enclosed Special Report No.90-010, Unit 2, is submitted.

Respectfully submitted, v1.,/ Ah V. G. Hairston, III VGil,III/DEHe sh 26.08 Enclosure ec: ~Hr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 9012260267 9012'20 7 POR ADOCK 05000364 s PDR

}$ /

Special Report No.90-010, Unit 2 Fire Barrier Penetration Open For More Than Seven Days The containment equipment hatch was open for more than seven days during the Unit 2 seventh refueling outage. The hatch was opened to support outage activities. The seven-day time limit for the equipment hatch was exceeded on 11-28-90. Since the containment vall is considered to be a fire barrier, opening this hatch constitutes breaching a fire barrier, l

Technical Specification 3.7.12 requires that within one hour, either establish a contine:us fire watch or verify the operab' of fire detectore and establish an hourly fire watch patrol. Technical s,.em* .ication action statement requirements vere met when the hatch was open. Technical Specification 3.7.12 also requires that breached fire barriers be restored to functional status within seven days or a Special Report must be submitted within the following 30 days. Therefore, this Special Report is being submitted.

Due to the scope of the work in progress, it was not practical to close this I hatch within seven days. The containment equipment hatch was closed on 12-01-90.