ML20054G345

From kanterella
Jump to navigation Jump to search
Ro:On 820609,certain a & B Train Svc Water Cooling Valves Associated W/Charging Pump 2B Mislabeled.Valves Correctly Relabeled Upon Discovery.Investigation Underway
ML20054G345
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/10/1982
From: Hairston W
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
FNP-82-0523, FNP-82-523, NUDOCS 8206210464
Download: ML20054G345 (1)


Text

. k'.w5 4 ,rn0 R,

~

y C u; . .

Y,fy #

Aldbpma Pbwer thesourre5 kscrem P. O. Drawer 470 Ashford, AL 36312 June 10,1982 FNP-82-0523 se-3YE Mr. J. P. O'Reilly, Director U. S. Nuc1 car Regulatory Commission 101 Marietta Street, N.W.

Atlanta, Georgia 30303

Dear Mr. O'Reilly:

This is to confirm the telephone call to Mr. V. Brownlee (NRC) at approximately 1512 on June 10, 1982, by Mr. J. D. Woodard (APCo).

On June 9, 1982, it was determined that a service water valve mislabeling error could have led to a condition potentially reportable under Unit 2 Tech. Spec. 6.9.1.12 i. Certain A & B train service water cooling valves associated with the 2B charging pump were mislabeled i.e., "A" train marked as "B" and vice versa. As a result it is possible that the Limiting Condition for Operation for the charging pump was not satisfied during certain time periods in plant life.

Immediately upon discovery of the condition, the valves were correctly relabeled. Similar valves in Units 1 and 2 were verified as being correctly labeled.

An investigation is continuing and further details will be provided in the followup report.

Yours truly, k irslorI, II

~

ant Manager Joseph M. Farley Nuclear Plant WGH/HMM:sjb CC: H. O. Thrash D. N. Morey W. G. Ware Document Control goi*

, ,v -

8206210464 820610

' gg y y PDR ADOCK 05000348 R PDR

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .