ML20062H189
| ML20062H189 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/26/1990 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9012040161 | |
| Download: ML20062H189 (2) | |
Text
9 h
o Attioma FWwer Company 40lnernoks Contor Pakw y ibst offee Don 129h Dirrningham. Alabama 3L201 kiephone 2( 5 06B $581 W. G,Hairston, til senm vice presioent nuoeai operanom Alaban)a[bwer ew sw,wn awrc s niem November 26, 1990 Docket No. 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, D. C. 20555 Joseph H. Farley Nuclear Plant - Unit 2 Special Report No.90-009, Firt. Barrier Penetration Open For More Than Seven Days Gentlemen In accordance with the requirements of Technic al Specification 3.7.12, the enclosed Special Report No. 90 009, Unit 2, is submitted.
Respectfully submitted,
,. ks
.14 V. G. Ilairston, III VGil,III/DEHeimgd 16.28 Enclosure cci Mr. S. D. Ebneter Mr. S. T. Iloffman Mr. G. F. Maxwell 9012040161. 0 3 3 ;.g l
f[UR ADUCE Od oi.,
4
/
l i
' 6
-o Special Report No.90-009, Unit 2 I
Fire Barrier l'enetration Open for More Than Seven Days The containment equipment hatch was open for more than seven days dus 'ry:
l the Unit 2 seventh refueling outage. The hatch was opened to support outage activities. The seven-day time limit for the equipment hatch was exceeded on 11-9-90.
Since the containment vall is considered to be a fire barrier, opening this hatch constitutes breaching a fire barrier.
Technical Specification 3.7.12 requires that within one nour, either establish a continuous fire watch or verify the operability of fire detectors and establish an hourly fire watch patrol. Technical Specification' action statement requirements were met when the hatch was open.
Technical Specification 3.7.12 also requires that breached fire barriers be restored to functional status within seven days or a Special Report must be submitted within the following 30 days.
Therefore, this Special Report is being submitted.
Due to the scope of the work in progress, it was not practical to close
. this hatch within seven days. The containment equipment hatch was closed on 11-13-90.