ML20073B024
ML20073B024 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 04/19/1991 |
From: | Woodard J ALABAMA POWER CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
91-002, 91-2, NUDOCS 9104230483 | |
Download: ML20073B024 (2) | |
Similar Documents at Farley | |
---|---|
Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER)
MONTHYEARML20217F8311997-09-29029 September 1997
[Table view]Special Rept 97-03-00,on 970921,declared Radiation Monitor R-60B Inoperable Due to Periodic Spiking Into Alarm W/No Apparent Reason.Isolated Problem to Detector & Will Repair Monitor During Next Outage When Plant Is in Cold Shutdown ML20149G2351997-07-18018 July 1997 Special Rept 97-001:on 970704,radiation Monitor R-60C Declared Inoperable Due to Monitor Normal Light Not Being Lit & Erroneous Data Indicated on Plant Computer.Mandatory LCO Written for Monitor R-60C ML20134L4061996-11-12012 November 1996 Special Rept 96-001:on 961015,unit Operating in Solid Plant Pressure Control in Mode 5 W/Rcs Temp Band of 175 to 180 Degrees.Caused by Binding of Charging Flow Control Valve. Charging Flow Control Valve Components Have Been Replaced ML20092C6411995-09-0808 September 1995 Special Rept:On 950806,containment Area RM R-27A Declared Inoperable Due to Instrument Displaying Invalid Alarm.Caused by Failed Connector Seal.Connector Seal Replaced & RM R-27A Returned to Operable Status on 950813 ML20126B8231992-12-17017 December 1992 Special Rept 92-007:on 921121,Train a RHR Pump Suction Relief Valve Lifted to Mitigate RCS Pressure Transient in Response to Pressure Increase.Operations Procedures Revised & Westinghouse Provided Lower RCS Pressure Operating Band ML20116K4621992-11-13013 November 1992 Special Rept 92-005:on 921020 Containment Equipment Hatch Opened to Support Outage Activities & Remained Inoperable for More than 7 Days,Resulting in Breach of Fire Barrier. Containment Equipment Hatch Closed on 921101 ML20116E7601992-11-0505 November 1992 Special Rept 92-006:on 921026,three Fire Suppression Water Sys High Pressure Pumps Inoperable for 36 Minutes.Diesel Driven Fire Pump Was Capable of Starting & Running During Pumps Inoperability & Fire Protection Pressure Maintained ML20116E8721992-11-0505 November 1992 Special Rept 92-004on 920927,five Ton CO-2 Unit for DG Bldg Isolated for Greater than 14 Days to Allow Investigation of Inadvertent Sys Discharge Into 1J 4,160 Volt Bus.Operable Status Restored on 921025 ML20116B7261992-10-27027 October 1992 Special Rept:On 921026,three Fire Suppression Water Sys High Pressure Pumps Declared Inoperable.Caused by Scheduled Outage Maint on Pump Electrical Supply Bus.Sys Pressure Maintained Throughout Event ML20113H5071992-07-28028 July 1992 Special Rept 92-003:on 920715,section of Pipe in Fire Main Yard Ruptured,Causing Fire Protection Water Tank Levels to Drop Below TS 3.7.11.1 Levels & Fire Main Water Pressure Lost.Fire Pumps Restored & Rupture Isolated ML20101S8861992-07-16016 July 1992 Special Rept:On 920715,section of Pipe in Fire Main Yard Loop Ruptured,Causing Loss of Fire Main Water Pressure. Rupture Isolated,Fire Pumps Restored & Fire Water Tank Levels Recovered to TS Required Levels ML20095J3381992-04-28028 April 1992 Special Rept:On 920329,seven-day Time Limit for Equipment Hatch Was Exceeded.Caused by Extensive Work Being Performed. Containment Equipment Hatch Closed on 920406 ML20085G1421991-10-18018 October 1991 Special Rept 91-007:on 910905,smoke Detection Sys Inoperable for More than 14 Days.Caused by Need to Install New Control Panels & New Smoke Detectors for Existing Fire Detection Sys.Sys Returned to Svc on 910926 ML20085D4941991-10-0808 October 1991 Special Rept 91-006:on 910827,low Pressure CO2 Distribution Sys for Auxiliary Bldg Isolated & Declared Inoperable Due to Leak from Underground Line.Damaged Line Replaced & Placed Into Svc ML20082P9381991-09-0606 September 1991 Special Rept 91-005:listed Four Fire Dampers Did Not Meet Acceptance Criterion of Closing W/Max Air Flow & Declared Inoperable.Design Change Requests Submitted to Mod Dampers to Ensure Proper Operation Under All Sys Conditons ML20082H6271991-08-19019 August 1991 Special Rept 91-004:on 910806,water Level in Both Fire Protection Water Storage Tanks Observed to Be Below Ts. Procedure Changes Made to Verify Pressure Alarm Switches Are Properly Aligned & to Check Clapper Valve Supply Pressures ML20077M4011991-08-0707 August 1991 Ro:On 910806,valve in Fire Protection Supply Header to Unit Cooling Towers Inadvertently Opened Causing Level in Fire Protection Water Storage Tanks to Decrease Below Required Tech Spec.Valve Isolated & Tanks Replenished ML20073B0241991-04-19019 April 1991 Special Rept 91-002:on 910327,fire Door 218 Removed & Nonfunctional for More than Seven Days to Support Outage Activities Inside Room 226 in Auxiliary Bldg.Fire Door Will Be Replaced & Declared Functional by 910417 ML20073B0321991-04-19019 April 1991 Special Rept 91-003:on 910331,containment Equipment Hatch Open for More than Seven Days to Support 10th Refueling Outage Activities.Hatch to Be Closed on Approx 910420 ML20072S4391991-04-0808 April 1991 Special Rept 91-001:on 910304,fire Damper Declared Inoperable Due to Failure to Close W/Max Air Flow.Damper Determined to Require Mod or Replacement.Mod Expected to Be Complete by 910517 ML20072Q6191990-12-20020 December 1990 Special Rept 90-012:on 901118,Tech Spec 3.7.11.4 Violated. Caused by Hose Station Isolation Valves N2T43V001 Through V007 Being Isolated from Svc Water Supply to Support Work on Containment Cooler 2D.Valves Returned to Svc ML20072Q6351990-12-20020 December 1990 Special Rept 90-011:on 901117,during Refueling Outage,Fire Detection Instrumentation Disabled to Allow Welding in Room. Instrumentation Not Restored to Operable Status within 14 Days,Per Tech Spec 3.3.3.9 ML20072Q6451990-12-20020 December 1990 Special Rept 90-010:on 901128,containment Equipment Hatch Open for More than Seven Days During Refueling Outage.Hatch Closed on 901201,per Tech Spec 3.7.12 ML20062H1891990-11-26026 November 1990 Special Rept 90-009:on 901109,fire Barrier Penetration Open for More than 7 Days to Support Outage Activities.Equipment Hatch Closed on 901113 ML20062H1881990-11-26026 November 1990 Special Rept 90-008:on 901102,fire Barrier Penetration Nonfunctional for More than 7 Days.Door Removed on 901025 to Support Outage Activities in Auxiliary Bldg.Door Will Be Replaced on 901212.Tech Spec Action Requirements in Force ML20063Q0691990-08-14014 August 1990 Revised Special Rept 90-006:on 900615,Radiation Monitor R-60C Declared Inoperable Due to Erroneous Indication.Rept Corrects 900702 Submittal Incorrectly Referenced as R-60A as Being Inoperable.Tech Spec Action Statement Met ML20056A1831990-07-27027 July 1990 Special Rept 90-007:on 900713,radiation Monitor Inoperable for More than 7 Days,Per Tech Spec 3.3.3.1 Requirements. Caused by Erroneous Indication.Monitor Scheduled to Be Repaired During Next Outage of Sufficient Duration ML20055D4901990-07-0202 July 1990 Special Rept 90-006:on 900615,radiation Monitor Declared Inoperable Due to Erroneous Indication.Monitor Scheduled to Be Repaired During Next Outage of Sufficient Duration,In Order to Comply W/Tech Spec 3.3.3.1 Requirement ML20247E7291989-07-20020 July 1989 Special Rept 89-002:on 890615,fire Damper Declared Inoperable.Caused by Damper Not Meeting Acceptance Criterion of Closing W/Air Flow in Sys.Design Change Initiated to Determine If Damper Will Be Modified or Replaced ML20247B0291989-07-18018 July 1989 Special Rept 89-001:on 890605,fire Detection Instrumentation Sys Disabled in Order to Support Mods to Access Control Area.Due to Nature of Work,Sys Could Not Be Returned to Svc within 14 Days,Per Tech Spec 3.3.3.9 ML20212N8971986-08-0606 August 1986 Ro:On 860804,enforcement Discretion (ED) Granted to Enable Startup W/Train a post-accident Hydrogen Analyzer Inoperable.Ed Based on Not Exceeding 30-day Limiting Condition for Operation & Having Alternate Capability ML20080A8331984-01-30030 January 1984 Ro:On 840112 & 14,plant Vent Stack Effluent Monitors R-29B,declared Inoperable When Four of Nine Detectors Failed.Failed Detectors Replaced ML20083G8281983-12-27027 December 1983 Ro:On 831224,fire Protection Tank a & B Levels Fell to Approx 232,000 Gallons Each Due to Extreme Cold,Causing Cooling Tower 1C Fire Protection Sys to Fail.On 831226,tank Levels Found Below Min Due to Personnel Error ML20082P1631983-11-29029 November 1983 Ro:On 831114,radiation Monitor R-60B for Main Steam Relief & Atmospheric Steam Dump Discharge Declared Inoperable Due to Erratic Indication.Possibly Caused by Detector or Connector Problem.Monitor Will Be Repaired ML20082C7821983-11-14014 November 1983 Ro:On 831015,instrument Air to Piping Penetration Room & Containment Inadvertently Isolated,Causing Letdown Line to Isolate & Charging Line to Open Fully.Caused by Improper Valve Assembly.Valve Repaired ML20080M0521983-09-19019 September 1983 Ro:On 830917,while Attempting to Isolate Steam to Turbine Bldg,Three MSIVs Failed to Close Under no-flow Conditions. Clapper Found Detached from Valve Arm.Investigation Continuing ML20069K6741983-04-20020 April 1983 Ro:On 830406,radiation Monitor R29B Declared Inoperable Due to Erroneous High Indications on Low Range Noble Gas Channel.Caused by Failure of Low Range Noble Gas Detector. Detector Replaced & Channel Calibr ML20083Q6151983-02-16016 February 1983 Ro:On 830215,both Trains of Control Room Filtration Unit & a Train Penetration Room Filtration Sys Failed to Meet Tech Spec Criteria for Carbon Efficiency.Caused by Misinterpretation of Reg Guide 1.52 ML20054G3451982-06-10010 June 1982 Ro:On 820609,certain a & B Train Svc Water Cooling Valves Associated W/Charging Pump 2B Mislabeled.Valves Correctly Relabeled Upon Discovery.Investigation Underway ML20136C3621979-06-22022 June 1979 Confirms 790622 Telcon Re Util Notification by Westinghouse That High Energy Line Break Inside Containment Could Result in Heatup of Steam Generator Level Transmitter Ref Legs.Util Evaluating Corrective Actions 1997-09-29 Category:TEXT-SAFETY REPORT MONTHYEARML20217P0761999-10-0606 October 1999
[Table view]Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30 |
Text
_ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ -
ceanama com comea,,
. .. 40 %r r.es: Cewer Pa % av ru on e n u '295 De n;rw! t *una af 201
. m entw, es ma wee n
J. D. Woodard /\labama power vu n.es-ae av:m i aw, or : er n e+ m w re.',o Docket No. 50-348 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, D. C. 20555 Joseph M. Parley Nuclear Plant - Unit 1 Special Report No.91-002, Fire Barrier Penetration Non-Functional For More Than Seven Days Gentlemen:
In accordance with the requirements of Technical Specification 3.7.12, the enclosed Special Report No.91-002, Unit 1, is submitted.
Respectfully submitted, kk dq D. Woodard JDW/BHV: map 0099 Enclosure cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 9104230483 910419 ADOCK 0500 8
{DR h/
j 1
1 Special Report No.91-002, Unit 1 Fire Barrier Penetration Non-Functional u For More Than Seven Days At 0820 on March 27, 1991, fire door number 218 was removed to support outage activities inside room 226 in the auxiliary building. Due to the scope of the work, the door was not replaced after seven days.
Technical Specification 3.7.12 requires that all non-functional fire barrier penetrations be restored to functional status within seven days or a Special Report must be submitted within the next 30 days.
Therefore, this Special Report is being submitted.
Fire door 218 vill be replaced and declared functional on approximately April 17, 1991. Technical Specification action requirements are being met for the fire door, 1