Dan Mmy S:uthern Nuclear Vice President Opuating Company Farley Project P.O. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 k
SOUTHERN h COMPANY July 18,1997 Enery to Serve YourWorld" Docket No.:
50-348 10 CFR 50.4 i
U.S. Nuclear Regulatory Commission
. ATTN: Document Control Desk Washington,DC 20555 Joseph M. Farley Nuclear Plant - Unit 1 Snecial Renort No.97-001. Inonerable Radiation Monitor R-60C Ladies and Gentlemen:
In accordance with the requirements of Technical Specification 3.3.3.1, the enclosed Special Report No.97-001, Unit 1, is submitted.
If you have any questions, please advise.
i Respectfully submitted, 1
Dave Morey MJA/ cit:sr-R-60C. doc Enclosure
\\
cc: Mr. L. A Reyes, Region II Administrator gp) j Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, Plant Sr. Resident Inspector l
9707230067 970718 PDR ADOCK 05000348:
S PM mittillmII!alflitill
- c2cesa,
ENCLOSURE Joseph M. Farley Nuclear Plant, Unit 1 Special Report 97-001 Inonerable Radiation Monitor R-60C l
l l
l l
i ENCLOSURE' i
Snecial Renort for Inonerable Radiation Monitor R-60C l
This Special Report is being submitted due to the Unit I radiation monitor R-60C (Main Steam Relief and Atmospheric Steam Dump Discharge) not being restored to operable status j
within the time required by Technical Specification (TS) 3.3.3.1-TS 3.3.3.1 requires the
' monitor to be restored to operable status within 7 days or submit a Special Report within the next 14 days following the event.
e
. At 0050 on July 4,1997, during performance of FNP-1-STP-1.0, " Operations Daily and Shift
- i L
Surveillance Requirements," radiation monitor R-60C (Main Steam Relief and Atmospheric
- Steam Dump Discharge) was declared inoperable due to the monitor nonnal light not being lit and erroneous data indicated on the plant computer. A mandatory Limiting Condition of
~
Operation (LCO) was written for R-60C requiring restoration to operable status by 0050 on July 11,1997, and a work order was generated to repair R-60C.
Maintenance troubleshooting isolated the problem to the detector. Due to the detector.
l location (main steam valve room roofin close proximity to steam generator safety relief valve discharges), repair of the monitor is a potential safety concern should any relieflift during the repair effort. Therefore, repair of the monitor should be performed only under cold shutdown -
1 conditions to ensure personnel safety. R-60C is scheduled to be repaired during the next
- outage of sufficient duration where the plant will be in cold shutdown. TS action statement i
requirements are being met for radiation monitor R-60C.
AdditionalInformation The following Special Reports have been submitted for similar radiation monitors exceeding the LCO restoration time due to inaccessibility with the unit operating at power:
Special Report 88-023-00 (Unit 1) - Radiation Monitor R-60A Inoperable For More Than Seven Days-
?
Special Report 90-006-01 (Unit 2) - Radiation Monitor Inoperable For More Than Seven Days Special Report 90-007-00 (Unit 2)'- Radiation Monitor Inoperable For More Than Seven Days i