Alabama Power Company 40 Inverness Center Parkway Post Office Box 1295 i
Birmingham, Alabama 35201
-l Telephone 205 868-5581 W. G. Hairston, til 8
Senior Vice President nuciear operaens Alabama Power.
August 14,.1990
'* **'" # #'* 8"""
Docket No. 50-364 i
U.-S. Nuclear Regulatory Commission:
ATTN: ' Document Control Desk Vashington,-D. C. 20555 Joseph M. Farley Nuclear Plant - Unit 2_
Special Report No.90-006, Revision 1, Radiation Monitor.
Inoperable For More Than'Seven Days Gentlemen:
In accordance with the requirements of Technical Specification 3.3.3.1,.
Special Report No.90-006,. Unit.2 was. submitted'on July 2, 1990. -However, due to a typographical error, this report. incorrectly referenced R-60A l
instead of R-60C as being inoperable.;-The enclosed Revision:1.to Special Report 90-006 reflects the correct radiation monitor.
1 Respectfully submitted,--
[h.
W V. G. Hairston, III i.
-VGil,III/ JAR:mgd 22.16 L
l Enclosure l
L
'cc Mr. S. D.'Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell i
q\\
=
o:
Special Report No.90-006 (Revision 1), Unit 2 l
Radiation Monitor Inoperable For More Than Seven Days At 1730'on 06/15/90, radiation monitor R-600 (Main Steam Relief and
.l Atmospheric Steam Dump Discharge) was declared inoperable due to erroneous indication. Troubleshooting. isolated the problem to the detector which~1s accessible only during cold shutdown.
This monitor is scheduled to be repaired during the next outage of sufficient duration..
l Technical Specification 3.3.3.1 requires this monitor to be returned to
-l cperable status within 7 days or a Special Report must be submitted within the next 14 days. Therefore, this Special Report is being submitted.
All Technical Specification action statement requirements are being met for this radiation monitor.