ML20082P163
| ML20082P163 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/29/1983 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8312080115 | |
| Download: ML20082P163 (1) | |
Text
. _ -.
Mailing t.ddr:ss Alabama Powsr Company 600 North 18th Strest Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
. 99 R 5 Flintndge Buildin A g,. 3 0 AlabamaPower Senior Vice Presi t
the southern electric syst "n November 29, 1983 Dock'et No. 50-364 Mr. J. P. O'Reilly U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.
Suite 3100 Atlanta, GA 30303 l
SUBJECT:
J. M. Farley Nuclear Plant Special Report - Unit 2
REFERENCE:
Technical Specification 3.3.3.1
Dear Mr. O'Reilly:
This special report is being submitted in accordance with Technical Specification 3.3.3.1 action statenent 27A.
At 1750 on 11-14-83, radiation monitor R-60B (Main Steam Relief and Atmospheric Steam Dump Discharge) was declared inoperable due to erratic indication.
It is believed that this failure is due to a detector or con-nector problem. The cause cannot be determined positively due to inacces-sibility of the suspected problem areas in Modes 1 through 4.
Should an event occur which requires the monitoring capability of R-608, an alter-nate method, as required by Technical Specification 3.3.3.1 action state-ment 27A, will be implemented in accordance with established plant proce-dures. This monitor is scheduled to be repaired during the next outage of sufficient duration.
Yours very truly, ayt n, Jp#
. L.
FLCJ r/KWM:nac/G-21 xc: File 8312080115 831129 OFFICIAL COiW.
~~
DR ADOCK 05000364 PDR fh
//0 '