ML20212N897
| ML20212N897 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/06/1986 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8609020029 | |
| Download: ML20212N897 (1) | |
Text
P yn6 Malling Address Alibim: Power Company 600 North 18th Street Post Offica Box 2641 Birmingt. yin. Alabama 35291 Telephone 205 783-609G R. P. Mcdonald b
Senior Vice President Flintridge Building
/ Ok)OUlObWCf cs.. <
August 6, 1986 Docket No. 50-364 U. S. Nuclear Regulatory Commission 1
Region II, Suite 2900 101 Marietta Street N.W.
~*
Atlanta, GA 30323 u
Attention:
Dr. J. N. Grace c.a
~
Gentlemen:
Joseph M. Farley Nuclear Plant - Unit 2 Enforcement Discretion This letter confirms the phone conversation between Mr. Roger Walker of your staff and Mr. Dave Morey (Farley Nuclear Plant) at approximately 1530 CDT on August 4,1986. This conversation resulted in an enforcement discretion being granted to enable startup of Farley Nuclear Plant Unit 2 with the Train A post-accident hydrogen analyzer inoperable.
l The above enforcement discretion was based upon (a) not exceeding the 30 day LC0 which commenced at 0800 on July 28, 1986 for the 2A post-accident hydrogen analyzer, and (b) having an alternate capability and procedures in place to sample the containment atmosphere for hydrogen under post-accident conditions.
If you have any questions, please advise.
Respectfully su. itte,
/hs' g/
/
8609020029 860806
(
PDR ADOCK 05000364 S
R. P. Mcdonald RPM / JAR:Im-D59 cc: Mr. L. B. Lon9 Mr. L. S. Rubenstein Mr. E. A. Reeves l
Mr. W. H. Bradford U.S. NRC. REGION U OFr!r!At POPN Sc " \\0