Southern Nuclear Operating Company Post Ottce Box 1295 Ermingham, Alabama 35201 4
Tetephone 205 868-5086 L
l Southern Nudear Operatirg; Company
- 3. o. w oo,a,,
ce Pr 1
ye go,pe,n gw,,c g47em April 28, 1992 Docket No. 50-364 l
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk l
Washington, D. C. 20555 Joseph M. Farley Nuclear Plant - Ur.it 2 Special Report No.92-001, Fire Barrier Penetration Open For More Than deven Days Gentlemen:
In accordance with the requirements of Technical Specification 3.7.12, the enclosed Special Report No.92-001, Unit 2, is submitted.
i i
Respectfully submitted, w
,d C wk.
\\. D. Woodard J
JDW/BHW: map 0101 Enclosure cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell i
i (p'2bE0idi263 920428
. PDR ADOCK 0500 4
l S
l
.m Joseph M. Farley Nuclear Plant Special Report No.92-001, Unit 2 Fire Barrier Penetration-0 pen for More Than Seven Days The ctantainment equipment hatch was open for more than seven days during the Unit 2_ refueling outage. The hatch was opened to support outage activities.
The seven-day time limit for t'. eouipment hatch was exceeded on March 29, 1992.
Since the containment wall is considered to be a fire barrier, opening this hatch constitutes breaching a fire barrier.
Technical Specification 3.7.12 requires that within one hour, either establish a continuous fire watch or verify the operability of fire l
detectors -and establish-an hourly fire watch patrol. Technical i
Specification action statement requirements were met for the open equipment l
hatch. Technical Specification 3.7.12 also requires that breached fire
. barriers be restored to functional status within seven days or a Special Report mustlbe submitted within the following 30 days.
Therefore, this Special Report is being submitted.
Due to the scope of tht: work in progress, it was not practical to close this' hatch within seven days. The containment equipment hatch was closed on April 6,1992 at 0919.
.