ML17352A949

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1994 for Turkey Point Units 3 & 4.W/941213 Ltr
ML17352A949
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/30/1994
From: Knorr J, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-313, NUDOCS 9412210074
Download: ML17352A949 (12)


Text

PRIDRI EY ACCELERATED RIDS Pl<OCESSIiG) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET N FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co.

PLUNKETT,T.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION for

SUBJECT:

Monthl 3 6 4 941213 tr.repts for Nov g 1994 Turkey Points Units DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE~CENZE 1 1 NRR/DISP/PIPB 1 1 NRR/DOPS/OECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC NRC PDR 1 1 iNOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP US TO REDUCE 'O'ASTE! COYTACT'I IIE DOC!'IIEY.'I'CONTROL DISTRIBUTION LIS'I'S I'OR DOC!.'Ml:X'I'S YOI.'ON" I'I DESk, ROO)~I Pl-37 (EXT. 504-~083 ) TO FLI%1IXATE YOI.'R NA!i!LFRO~I I'.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

OEC 18 1ggy+

OEC ~tgg<

L-94-313 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washingtonr D C 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020I attached are the November 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant

'rr412210074 '741130 PDR ADOCK 05000250 R PDR an FPL Group company

&Dw,lQ(c

I>

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE December 13 1994 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH NOVEMBER 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 667 11/02/94 585 11/03/94 686 11/04/94 685 11/05/94 690 11/06/94 692 11/07/94 690 11/08/94 687 11/09/94 678 11/10/94 685 11/11/94 682 11/12/94 684 11/13/94 691 11/14/94 695 11/15/94 695 11/16/94 681 11/17/94 696 I

4 11/18/94 698 11/19/94 697 I

11/20/94 683 11/21/94 684 ji 11/22/94 678 11/23/94 678 11/24/94 690 11/25/94 690 11/26/94 685 11/27/94 691 11/28/94 686 11/29/94 681 11/30/94 688

OPERATING DATA REPORT DOCKET NO 50 250 DATE 12/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS 1 Utli i NAh'lE: I'URKEY POINT UNIT 3 2 REPORTING PERIOD: NOVEMBER 1994 3 LICENSED THERMAL POWER (MWT): 2200 4 NAMEPLATE RATING (GROSS MWE): 760 5 DESIGN ELECTRICAL RATING (NET MWE): 693 6 MAXIMUM DEPEtlDABLE CAPACITY (GROSS hlWE): 699 7 MAXIMUM DEPEttDABLE CAPACITY (NET MWE): 666 8 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS, IF ANY:

hlONTHLY -YTO- CUMULATIVE l l. ltOURS IN RFPORT PERIOD: 720 8016 192753.6

12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7000.6 128260.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 14, HOIJRS GENERATOR ON-LINE 720.0 6853.3 126386.7
15. ut~IT RESERVE Sl-luTOOWN HOURS 0.0 0.0 121.8
16. GROSS 'THERMAL ENERGY GENERATED (MWH) 1573644 14650146 262789984
17. GROSS ELECTRICAL ENERGY GENERATEO (MwH) 515830 4730600 84312416
18. NET EI.ECTRICAL ENERGY GENERATED (MWH) 491935 4499503 79769008
19. UNIT SERVICE FACTOR 100. 0 85.5 65.6
20. UN11 AVAILABILITYFACTOR 100. 0 85.5 65.6
21. CAPACITY FACTOR (USIttG MDC NET) 102. 6 84.3 63. 1
22. CAPACI1Y FACTOR (USitlG DER NET) 98.6 81.0 59.7
23. UNIT FORCED OUtAGE RATE 0.0 1.0 11.3
24. SHUTDOWNS SCHEDULED OVER NEXT 6 hlONTHS NONE IF StulT DOWtl AT ENO OF REPORT PERIOD, EST IMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME:

DATE: December 13 1994 COMPLETED BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH NOVEMBER 1994 No. Date Duration Reason'ethod Code'omponent System Cause & Corzectlve Action to (Hours) of Event Codes Prevent Recurrence Reactor'icensee Shutting Report4 Down 19 110194 0.0 N/A ELECON Load reduction for 4 kV C Bus test.

F Forced Reason Yethod Exhibit 0 Instructions Exhibit 1 Same Source S - Scheduled A Equipment Failure 1 - Nanual for Preparation of Data B Ymlntenance or Test 2 Nanual Scram Entry Sheets Licensee C Refuollng 3 - Automatic Scram Event Report (I,ER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 6 5 - Load Reduction License Examination 9 - Other (Explain)

F Administrative C - Operational Error (Explain)

H Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point 3 DATE December 13 1994 COMPLETED BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH NOVEMBER 1994 Unit 3 started the month at essentially 100% power. On November 2, the unit was reduced to approximately 60% power for testing of the 4kV C bus. The unit was returned to essentially 100% power on November 3, and remained at that level through the end of the month.

A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE December 13 1994 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH NOVEMBER 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 0 11/02/94 0 11/03/94 0 11/04/94 0 11/05/94 0 11/06/94 0 I

11/07/94 0 II 11/08/94 0 11/09/94 H

0 11/10/94 0 11/11/94 0 11/12/94 0 11/13/94 0 11/14/94 48 11/15/94 85 11/16/94 14 11/17/94 285 11/18/94 271 11/19/94 453 11/20/94 603 11/21/94 639 11/22/94 691 11/23/94 681 11/24/94 693 11/25/94 695 11/26/94 701 11/27/94 697 11/28/94 693 11/29/94 690 11/30/94 443

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 12/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

l. UNIT NAME< TURKEY POINT UNIT 4
2. REPORTING PERIOD: NOVEMBER 1994
3. LICENSED THERMAL POWER (MWT)t 2200
4. NAMEPLATE RATING (GROSS MWE)t 760
5. Of SIGN ELECTRICAL RATING (NET MWE) t 693
6. MaxIM<JM DEpENDABLE cApAGITY (GROss MwE)t 699 7 MAxlMUM DEPEt<DABLE cAPacITY (NET MwE)t 666 B. IF CHANGFS OCCUR IN CAPACITY RallNGS ( ITEMS NUMBER 3 THROUGtt 7) 51NCE LAST REPORT, GIVE REASOt<S<
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10, RFASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTO- CUMULATIVE 1 < . <<OURS IN REPOR T PEtc UU t 1 720 8016 186485.0

12. NUMBE<< OF HOURS REACTOR WAS CRITICAL 439.2 6840.4 1 24120. 7

<3. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6

14. HOURS GENERATOR ON-LINE 360.4 6728.2 120053.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 657947 14313763 2533737 18

<7 GROSS ELECTRICAL ENERGY GENERATEO (MWH) 213447 4584537 80938507

18. t<ET ELECTRICAL ENERGY GENERATEO (MWH) 198391 4358504 76593736
19. <<NIT SERVICE FACTOR 50. 1 83.9 64.4
20. UNIT AVAILABILITYFACTOR 50. 1 83.9 64.7 2'<. Cat'A<.ITY FACTOR (USING MDC NET) 41.4 81.6 62.6 CAPACITY FACTOR (USING DER NET) 39.8 78.5 59.3
23. UNIT FORCED OUTAGE RATE 8.6 3.8 11.0
24. St<UIDOWNS SCHEDULED OVER NEXT 6 MONTHS t<ONE 25 lt St<Ul DOwt< AT END OF REPOR'I PERIOD, EST IMATED DAtE OF 51ARTUP<

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turke Point g4 DATE December 13 1994 COMPLETED BY J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH NOVEMBER 1994 No. Date Duration (Hours)

Reason* Method of Event Code'onponent.

Systen Code'ause S Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reports 110194 325.8 N/A Rc FUELXX Continued Unit Shutdown for Refueling 12 111594 25.5 N/A HA INSTRU Repair of Turbine control oil systen 13 113094 8.3 LER EB ELECON Reactor Trip Due to Turbine Generator Ground 94-006 F Forced Reason Method Exhibit G - 1nstructlons Exhibit 1 << Sane Source s scheduled A - Equip.=ent Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scran Entry Sheets Licensee C - Refueling 3 Autonatic Scran Event Report (LER) File D - Regulatory restriction 4 Continued (NUREG-0161)

E - Operator Training 4 5 - Load Reduction License Exanlnation 9 - Other (Explain)

F Adninlstrative G Operational Error (Explain)

H Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 Turke Point 4 UNIT'ATE'OMPLETE December 13 1994 J. E. Knorr BY'ELEPHONE:

305 246-6757 REPORT MONTH NOVEMBER 1994 Unit 4 began the month shut down for the Cycle 15 refueling. The unit was returned to the line on November 14. On November 15, the unit remained at low power during the repair of the turbine control oil system. 100% power was reached on November 22. The unit remained at 100% power until an automatic reactor trip caused by a main generator ground on November 30.