Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
PRIDRI EY ACCELERATED RIDS Pl<OCESSIiG) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET N FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co.
PLUNKETT,T.F. Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION for
SUBJECT:
Monthl 3 6 4 941213 tr.repts for Nov g 1994 Turkey Points Units DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE~CENZE 1 1 NRR/DISP/PIPB 1 1 NRR/DOPS/OECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC NRC PDR 1 1 iNOTE TO ALL"RIDS" RECIPIEYTS:
PLEASE HELP US TO REDUCE 'O'ASTE! COYTACT'I IIE DOC!'IIEY.'I'CONTROL DISTRIBUTION LIS'I'S I'OR DOC!.'Ml:X'I'S YOI.'ON" I'I DESk, ROO)~I Pl-37 (EXT. 504-~083 ) TO FLI%1IXATE YOI.'R NA!i!LFRO~I I'.D!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
OEC 18 1ggy+
OEC ~tgg<
L-94-313 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washingtonr D C 20555 Gentlemen:
Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020I attached are the November 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, T. F. Plunkett Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant
'rr412210074 '741130 PDR ADOCK 05000250 R PDR an FPL Group company
&Dw,lQ(c
I>
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE December 13 1994 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH NOVEMBER 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 667 11/02/94 585 11/03/94 686 11/04/94 685 11/05/94 690 11/06/94 692 11/07/94 690 11/08/94 687 11/09/94 678 11/10/94 685 11/11/94 682 11/12/94 684 11/13/94 691 11/14/94 695 11/15/94 695 11/16/94 681 11/17/94 696 I
4 11/18/94 698 11/19/94 697 I
11/20/94 683 11/21/94 684 ji 11/22/94 678 11/23/94 678 11/24/94 690 11/25/94 690 11/26/94 685 11/27/94 691 11/28/94 686 11/29/94 681 11/30/94 688
OPERATING DATA REPORT DOCKET NO 50 250 DATE 12/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS 1 Utli i NAh'lE: I'URKEY POINT UNIT 3 2 REPORTING PERIOD: NOVEMBER 1994 3 LICENSED THERMAL POWER (MWT): 2200 4 NAMEPLATE RATING (GROSS MWE): 760 5 DESIGN ELECTRICAL RATING (NET MWE): 693 6 MAXIMUM DEPEtlDABLE CAPACITY (GROSS hlWE): 699 7 MAXIMUM DEPEttDABLE CAPACITY (NET MWE): 666 8 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS, IF ANY:
hlONTHLY -YTO- CUMULATIVE l l. ltOURS IN RFPORT PERIOD: 720 8016 192753.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7000.6 128260.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 14, HOIJRS GENERATOR ON-LINE 720.0 6853.3 126386.7
- 15. ut~IT RESERVE Sl-luTOOWN HOURS 0.0 0.0 121.8
- 16. GROSS 'THERMAL ENERGY GENERATED (MWH) 1573644 14650146 262789984
- 17. GROSS ELECTRICAL ENERGY GENERATEO (MwH) 515830 4730600 84312416
- 18. NET EI.ECTRICAL ENERGY GENERATED (MWH) 491935 4499503 79769008
- 19. UNIT SERVICE FACTOR 100. 0 85.5 65.6
- 20. UN11 AVAILABILITYFACTOR 100. 0 85.5 65.6
- 21. CAPACITY FACTOR (USIttG MDC NET) 102. 6 84.3 63. 1
- 22. CAPACI1Y FACTOR (USitlG DER NET) 98.6 81.0 59.7
- 23. UNIT FORCED OUtAGE RATE 0.0 1.0 11.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 hlONTHS NONE IF StulT DOWtl AT ENO OF REPORT PERIOD, EST IMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME:
DATE: December 13 1994 COMPLETED BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH NOVEMBER 1994 No. Date Duration Reason'ethod Code'omponent System Cause & Corzectlve Action to (Hours) of Event Codes Prevent Recurrence Reactor'icensee Shutting Report4 Down 19 110194 0.0 N/A ELECON Load reduction for 4 kV C Bus test.
F Forced Reason Yethod Exhibit 0 Instructions Exhibit 1 Same Source S - Scheduled A Equipment Failure 1 - Nanual for Preparation of Data B Ymlntenance or Test 2 Nanual Scram Entry Sheets Licensee C Refuollng 3 - Automatic Scram Event Report (I,ER) File D - Regulatory restriction 4 - Continued (NUREG-0161)
E - Operator Training 6 5 - Load Reduction License Examination 9 - Other (Explain)
F Administrative C - Operational Error (Explain)
H Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point 3 DATE December 13 1994 COMPLETED BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH NOVEMBER 1994 Unit 3 started the month at essentially 100% power. On November 2, the unit was reduced to approximately 60% power for testing of the 4kV C bus. The unit was returned to essentially 100% power on November 3, and remained at that level through the end of the month.
A
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE December 13 1994 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH NOVEMBER 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 0 11/02/94 0 11/03/94 0 11/04/94 0 11/05/94 0 11/06/94 0 I
11/07/94 0 II 11/08/94 0 11/09/94 H
0 11/10/94 0 11/11/94 0 11/12/94 0 11/13/94 0 11/14/94 48 11/15/94 85 11/16/94 14 11/17/94 285 11/18/94 271 11/19/94 453 11/20/94 603 11/21/94 639 11/22/94 691 11/23/94 681 11/24/94 693 11/25/94 695 11/26/94 701 11/27/94 697 11/28/94 693 11/29/94 690 11/30/94 443
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 12/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS
- l. UNIT NAME< TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: NOVEMBER 1994
- 3. LICENSED THERMAL POWER (MWT)t 2200
- 4. NAMEPLATE RATING (GROSS MWE)t 760
- 5. Of SIGN ELECTRICAL RATING (NET MWE) t 693
- 6. MaxIM<JM DEpENDABLE cApAGITY (GROss MwE)t 699 7 MAxlMUM DEPEt<DABLE cAPacITY (NET MwE)t 666 B. IF CHANGFS OCCUR IN CAPACITY RallNGS ( ITEMS NUMBER 3 THROUGtt 7) 51NCE LAST REPORT, GIVE REASOt<S<
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10, RFASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTO- CUMULATIVE 1 < . <<OURS IN REPOR T PEtc UU t 1 720 8016 186485.0
- 12. NUMBE<< OF HOURS REACTOR WAS CRITICAL 439.2 6840.4 1 24120. 7
<3. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LINE 360.4 6728.2 120053.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 657947 14313763 2533737 18
<7 GROSS ELECTRICAL ENERGY GENERATEO (MWH) 213447 4584537 80938507
- 18. t<ET ELECTRICAL ENERGY GENERATEO (MWH) 198391 4358504 76593736
- 19. <<NIT SERVICE FACTOR 50. 1 83.9 64.4
- 20. UNIT AVAILABILITYFACTOR 50. 1 83.9 64.7 2'<. Cat'A<.ITY FACTOR (USING MDC NET) 41.4 81.6 62.6 CAPACITY FACTOR (USING DER NET) 39.8 78.5 59.3
- 23. UNIT FORCED OUTAGE RATE 8.6 3.8 11.0
- 24. St<UIDOWNS SCHEDULED OVER NEXT 6 MONTHS t<ONE 25 lt St<Ul DOwt< AT END OF REPOR'I PERIOD, EST IMATED DAtE OF 51ARTUP<
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turke Point g4 DATE December 13 1994 COMPLETED BY J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH NOVEMBER 1994 No. Date Duration (Hours)
Reason* Method of Event Code'onponent.
Systen Code'ause S Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reports 110194 325.8 N/A Rc FUELXX Continued Unit Shutdown for Refueling 12 111594 25.5 N/A HA INSTRU Repair of Turbine control oil systen 13 113094 8.3 LER EB ELECON Reactor Trip Due to Turbine Generator Ground 94-006 F Forced Reason Method Exhibit G - 1nstructlons Exhibit 1 << Sane Source s scheduled A - Equip.=ent Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scran Entry Sheets Licensee C - Refueling 3 Autonatic Scran Event Report (LER) File D - Regulatory restriction 4 Continued (NUREG-0161)
E - Operator Training 4 5 - Load Reduction License Exanlnation 9 - Other (Explain)
F Adninlstrative G Operational Error (Explain)
H Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 Turke Point 4 UNIT'ATE'OMPLETE December 13 1994 J. E. Knorr BY'ELEPHONE:
305 246-6757 REPORT MONTH NOVEMBER 1994 Unit 4 began the month shut down for the Cycle 15 refueling. The unit was returned to the line on November 14. On November 15, the unit remained at low power during the repair of the turbine control oil system. 100% power was reached on November 22. The unit remained at 100% power until an automatic reactor trip caused by a main generator ground on November 30.