| | Start date | Site | Title | Topic |
|---|
| ML25143A138 | 23 December 2025 | Peach Bottom | Approval of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations | Exemption Request |
| ML25337A128 | 18 December 2025 | Browns Ferry | Issuance of Amendment Nos. 337, 360, and 320 Regarding Adoption of TSTF-423-A, Revision 1, Technical Specifications End States, NEDC-32988-A | Safe Shutdown Ultimate heat sink Water Inventory Control Probabilistic Risk Assessment Large early release frequency Loss of Offsite Power Offsite Circuit |
| IR 05000259/2025003 | 18 December 2025 | Browns Ferry | Integrated Inspection Report 05000259/2025003, 05000260/2025003, 05000296/2025003 and 07200052/2024001 and Exercise of Enforcement - Revised | Past operability Enforcement Discretion Functionality Assessment Significance Determination Process Notice of Violation Scram Discharge Volume Large early release frequency Operability Determination Earthquake Fire Protection Program Continuous basket shim |
| IR 05000528/2025003 | 16 December 2025 | Palo Verde | Integrated Inspection Report 05000528/2025003, 05000529/2025003 and 05000530/2025003 | Mission time Grab sample Offsite Dose Calculation Manual Enforcement Discretion Functionality Assessment FLEX Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Loss of Offsite Power Operability Determination Maintenance Rule Program Fire Protection Program Overspeed |
| ML25342A446 | 15 December 2025 | Salem | Regulatory Audit Summary in Support of the NRC Staffs Review of LARs to Adopt TSTF-505 and 10 CFR 50.69 | Tornado Missile Probabilistic Risk Assessment Open Phase Condition |
| IR 05000250/2025003 | 9 December 2025 | Turkey Point | Integrated Inspection Report 05000250/2025003 and 05000251/2025003 | Safe Shutdown Fire Barrier Stroke time Past operability Enforcement Discretion Fire impairment Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Large early release frequency Loss of Offsite Power Operability Determination Maintenance Rule Program Fire Protection Program Fire Watch Overspeed trip |
| IR 05000317/2025003 | 9 December 2025 | Calvert Cliffs | Integrated Inspection Report 05000317/2025003 and 05000318/2025003 | Safe Shutdown Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Large early release frequency Operability Determination Fire Protection Program Downpower |
| IR 05000458/2025013 | 3 December 2025 | River Bend | Age-Related Degradation Inspection Report 05000458/2025013 | Ultimate heat sink Mission time Significance Determination Process Operability Determination Maintenance Rule Program |
| ML25324A218 | 20 November 2025 | Prairie Island | Notification of NRC Fire Protection Team Inspection Request for Information | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Fire impairment Job Performance Measure Fire Protection Program |
| ML25262A143 | 14 November 2025 | Robinson | Aging Management Audit Report - Robinson, Unit 2 SLR | Boric Acid Fire Barrier Hydrostatic Coatings VT-2 Emergency Lighting Aging Management Foreign Material Exclusion Flow Accelerated Corrosion Intergranular Stress Corrosion Cracking Stress corrosion cracking Integrated leak rate test Containment high range radiation monitor Moisture barrier License Renewal Subsequent License Renewal Subsequent License Renewal Application Earthquake Fire Protection Program Dissimilar Metal Weld Scaffolding Downpower Thermography Thermal fatigue Leak-Before-Break |