MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
.ACCEI ERATO DOCUMENT DIST UTION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:9308170104 DOC.DATE: 93/07/31 NOTARIZED: NO 'OCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light, C 05000250
$ 0g251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CALLANDER,R. Florida Power & Light Co.
PLUNKETT,T.F. Florida Power & Light Co. R RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Jul 1993 for Turkey Point, units 3 & 4.W/930812 ltr.
DISTRIBUTION CODE: XE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES A
ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DORS OEAB 1 1 NRR/DRIL/RPEB 1 1 FI 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCEiJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE IVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'7 NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14
r c Jl
P,UG 1R %9~
PIRL Z,-93-199 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very Truly Yours,
~(,p'P/~~AN b T. F. Plunkett Vice President Turkey Point Nuclear TFP/RCC/rc attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant
'9308170i04 930731 PDR '
ADQCK 05000250 R PDR an FpL Group company
l l
BQI ~VI
AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT ~~R6Z POINT 3 DATE COMPLETED BY A TELEPHONE MONTH JULY 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/93 672 07/02/93 675 07/03/93 673 07/04/93 669 07/05/93 670 07/06/93 669 07/07/93 666 07/08/93 670 07/09/93 667 07/10/93 672 07/11/93 675 07/12/93 674 07/13/93 670 07/14/93 671 07/15/93 673 07/16/93 670 07/17/93 666 07/18/93 664 07/19/93 662 07/20/93 654 07/21/93 657 07/22/93 664 07/23/93 538 07/24/93 250 07/25/93 576 07/26/93 672 07/27/93 671 07/28/93 672 07/29/93 673 07/30/93 669 07/31/93 674
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME:
DATE u ust COMPLETED BY: a an er TELEPHONE:
REPORT MONTH JULY 1993 No. Date Duration Reason* Nethod of Licensee Sgstep Conponept Cause C Corrective (Hours) Shutting Event ode Code Action to Down Reportk Prevent Recurrence Reactors ,
072393 N/A CC HTEXCH Re air leak on 3B HSR drain line F - Forced Reason
-- Ymthod Exhibit C Instructions Exhibit 1 - Sane Source s scheduled A Equipnent Failure 1 Manual
- for Preparation of Data B Naintenance or Test 2 Ymnual Scran Entry Sheets Licensee C Refueling
- Regulatory restriction 3 Automatic Scran Event Report (LER) File D 4 Continued (NUREG-0161)
Operator Training 6 5 Load Reduction E
License Exanination 9 - Other (Explain)
F C
- Adninistrative Operational Error (Expla1n)
H Other (Explain)
I t
II jh 4 f
~ J it'
~
~
'"')lh
~ ~
OPERATING DATA REPORT DOCKET NO 50 250 DATE 8/1 1/93 COMPLETED BY R. CALLANDER TELEPHONE 305/246/6818 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: JULY, 1993
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 744 5087 181064. 6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4970.9 117730. 2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE 744.0 4934.5 116045.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1595512 10665248 240572175
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 506735 3476100 77118226
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 482376 3311151 72923311
- 19. UNIT SERVICE FACTOR 100.0 97.0 64. 1
- 20. UNIT AVAILABILITYFACTOR 100.0 97.0 64.2
- 21. CAPACITY FACTOR (USING MDC NET) 97.4 97.7 61. 5
- 22. CAPACITY FACTOR (USING DER NET) 93.6 93.9 58. 1
- 23. UNIT FORCED OUTAGE RATE 0.0 3.0 12. 1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS : N ONE
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: ur e oin DATE: u us COMPLETED BY: a an er TELEPHONE:
REPORT MONTH JULY 1993 On July 23, Unit 3 was reduced in power to 20% to repair a leak on the 3B moisture separator reheater drain line. Following completion of the repair, the unit was returned to 100% power late on July 24.
The unit remained at essentially 100% power for the remainder of the month.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TTTRREV POINT 4 DATE A COMPLETED BY R. A A D TELEPHONE MONTH JULY 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/93 648 07/02/93 621 07/03/93 666 07/04/93 664 07/05/93 665 07/06/93 663 07/07/93 663 07/08/93 561 07/09/93 665 07/10/93 668 07/11/92 671 07/12/93 672 07/13/93 669 07/14/93 672 07/15/93 672 07/16/93 667 07/17/93 668 07/18/93 665 07/19/93 662 07/20/93 662 07/21/93 663 07/22/93 662 07/23/93 665 07/24/93 661 07/25/93 666 07/26/93 665 07/27/93 663 07/28/93 663 07/29/93 635 07/30/93 664 07/31/93 670
,i iA ij II
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME'ATE:
ll US COMPLETED BY: a an er TELEPHONE:
REPORT MONTH JULY 1993 No Date T) pe'uration (Hours)
Reason'ethod of Shutting Licensee Event Sgstep ode Conponept Code Cause & Corrective Action to Down Report4 Prevent Recurrence Reactors ,
070193 S N/A RC INSTRU Flux nao in 10 070893 S N/A HJ HTEXCH 4B TPCW heat exchan er tube lu in F Forced Reason
-- Method
- Exhibit G - Instructions Exhibit 1 Sane Source S Scheduled A Equipnent Failure 1 Manual for Preparation of Data Main~tenance or Test 2 Manual Scran Entrv Sheets Licensee B
C -- Refueling 3 Au'tona'tic Scran Event Report (LER) File
- Regulatory restriction 4 Continued (NUREG 0161) 5 - Load Reduction D
E Operator Training 4 - Other License Exanination 9 (Explain)
F Adnini st ra tive G Operational Error (Explain)
H Other (Explain)
I~
4 I
a, r
k j '" ~ I C Xd',>'it'I a
C ~ & ~
j ',4' 4 s"
OPERATING DATA REPORT DOCKET NO 50 251 DATE 8/11/93 COMPLETED BY R. CALLANDER TELEPHONE 305/246/6818 OPERATING STATUS 1 . UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: JULY, 1993
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760 DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
)0. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 744 5087 174796.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3872.3 113710.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6 l4. HOURS GENERATOR ON-LINE 744.0 3718.5 109763.8
~15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 11.7
-'.6. GROSS THERMAL ENERGY GENERATED (MWH) 1627616 7837551 23141 1886
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 514995 2522445 73881415
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 490554 2391 136 69880077
- 19. UNIT SERVICE FACTOR 100.0 73.1 62.8
- 20. UNIT AVAILABILITYFACTOR 100.0 73.1 63. 1
- 21. CAPACITY FACTOR (USING MDC NET) 99.0 70.6 61.0
- 22. CAPACITY FACTOR (USING OER NET) 95.1 67.8 57.7
- 23. UNIT FORCED OUTAGE RATE 0.0 26.9 11.7
- 24. SHUTDOWNS SCHEDULED OVFR NEXT 6 MONTHS NONE
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT ur e oin DATE COMPLETED BY a an er TELEPHONE:
REPORT MONTH JUNE 1993 1, Unit reduced in power to to determine target fluxJuly On 4 was 85%
difference in accordance with Technical Specifications.
On July 8, the unit was reduced in power to 60% for tube plugging on the 4B turbine plant cooling water heat exchanger. Following the tube plugging, the unit was returned to 100% power and remained at essentially 100% power through the end of the month.
0 . ~ V'~
E