.ACCEI ERATO DOCUMENT DIST UTION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9308170104 DOC.DATE: 93/07/31 NOTARIZED: NO 'OCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light, C 05000250

$ 0g251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CALLANDER,R. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co. R RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Jul 1993 for Turkey Point, units 3 & 4.W/930812 ltr.

DISTRIBUTION CODE: XE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES A

ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DORS OEAB 1 1 NRR/DRIL/RPEB 1 1 FI 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCEiJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE IVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'7 NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

r c Jl

P,UG 1R %9~

PIRL Z,-93-199 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very Truly Yours,

~(,p'P/~~AN b T. F. Plunkett Vice President Turkey Point Nuclear TFP/RCC/rc attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

'9308170i04 930731 PDR '

ADQCK 05000250 R PDR an FpL Group company

l l

BQI ~VI

AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT ~~R6Z POINT 3 DATE COMPLETED BY A TELEPHONE MONTH JULY 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/93 672 07/02/93 675 07/03/93 673 07/04/93 669 07/05/93 670 07/06/93 669 07/07/93 666 07/08/93 670 07/09/93 667 07/10/93 672 07/11/93 675 07/12/93 674 07/13/93 670 07/14/93 671 07/15/93 673 07/16/93 670 07/17/93 666 07/18/93 664 07/19/93 662 07/20/93 654 07/21/93 657 07/22/93 664 07/23/93 538 07/24/93 250 07/25/93 576 07/26/93 672 07/27/93 671 07/28/93 672 07/29/93 673 07/30/93 669 07/31/93 674

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME:

DATE u ust COMPLETED BY: a an er TELEPHONE:

REPORT MONTH JULY 1993 No. Date Duration Reason* Nethod of Licensee Sgstep Conponept Cause C Corrective (Hours) Shutting Event ode Code Action to Down Reportk Prevent Recurrence Reactors ,

072393 N/A CC HTEXCH Re air leak on 3B HSR drain line F - Forced Reason

-- Ymthod Exhibit C Instructions Exhibit 1 - Sane Source s scheduled A Equipnent Failure 1 Manual

- for Preparation of Data B Naintenance or Test 2 Ymnual Scran Entry Sheets Licensee C Refueling

- Regulatory restriction 3 Automatic Scran Event Report (LER) File D 4 Continued (NUREG-0161)

Operator Training 6 5 Load Reduction E

License Exanination 9 - Other (Explain)

F C

- Adninistrative Operational Error (Expla1n)

H Other (Explain)

I t

II jh 4 f

~ J it'

~

~

'"')lh

~ ~

OPERATING DATA REPORT DOCKET NO 50 250 DATE 8/1 1/93 COMPLETED BY R. CALLANDER TELEPHONE 305/246/6818 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: JULY, 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5087 181064. 6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4970.9 117730. 2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 4934.5 116045.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1595512 10665248 240572175
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 506735 3476100 77118226
18. NET ELECTRICAL ENERGY GENERATED (MWH) 482376 3311151 72923311
19. UNIT SERVICE FACTOR 100.0 97.0 64. 1
20. UNIT AVAILABILITYFACTOR 100.0 97.0 64.2
21. CAPACITY FACTOR (USING MDC NET) 97.4 97.7 61. 5
22. CAPACITY FACTOR (USING DER NET) 93.6 93.9 58. 1
23. UNIT FORCED OUTAGE RATE 0.0 3.0 12. 1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS : N ONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: ur e oin DATE: u us COMPLETED BY: a an er TELEPHONE:

REPORT MONTH JULY 1993 On July 23, Unit 3 was reduced in power to 20% to repair a leak on the 3B moisture separator reheater drain line. Following completion of the repair, the unit was returned to 100% power late on July 24.

The unit remained at essentially 100% power for the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TTTRREV POINT 4 DATE A COMPLETED BY R. A A D TELEPHONE MONTH JULY 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/93 648 07/02/93 621 07/03/93 666 07/04/93 664 07/05/93 665 07/06/93 663 07/07/93 663 07/08/93 561 07/09/93 665 07/10/93 668 07/11/92 671 07/12/93 672 07/13/93 669 07/14/93 672 07/15/93 672 07/16/93 667 07/17/93 668 07/18/93 665 07/19/93 662 07/20/93 662 07/21/93 663 07/22/93 662 07/23/93 665 07/24/93 661 07/25/93 666 07/26/93 665 07/27/93 663 07/28/93 663 07/29/93 635 07/30/93 664 07/31/93 670

,i iA ij II

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME'ATE:

ll US COMPLETED BY: a an er TELEPHONE:

REPORT MONTH JULY 1993 No Date T) pe'uration (Hours)

Reason'ethod of Shutting Licensee Event Sgstep ode Conponept Code Cause & Corrective Action to Down Report4 Prevent Recurrence Reactors ,

070193 S N/A RC INSTRU Flux nao in 10 070893 S N/A HJ HTEXCH 4B TPCW heat exchan er tube lu in F Forced Reason

-- Method

- Exhibit G - Instructions Exhibit 1 Sane Source S Scheduled A Equipnent Failure 1 Manual for Preparation of Data Main~tenance or Test 2 Manual Scran Entrv Sheets Licensee B

C -- Refueling 3 Au'tona'tic Scran Event Report (LER) File

- Regulatory restriction 4 Continued (NUREG 0161) 5 - Load Reduction D

E Operator Training 4 - Other License Exanination 9 (Explain)

F Adnini st ra tive G Operational Error (Explain)

H Other (Explain)

I~

4 I

a, r

k j '" ~ I C Xd',>'it'I a

C ~ & ~

j ',4' 4 s"

OPERATING DATA REPORT DOCKET NO 50 251 DATE 8/11/93 COMPLETED BY R. CALLANDER TELEPHONE 305/246/6818 OPERATING STATUS 1 . UNIT NAME: TURKEY POINT UNIT 4

2. REPORTING PERIOD: JULY, 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760 DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)

)0. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5087 174796.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3872.3 113710.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6 l4. HOURS GENERATOR ON-LINE 744.0 3718.5 109763.8

~15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 11.7

-'.6. GROSS THERMAL ENERGY GENERATED (MWH) 1627616 7837551 23141 1886

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 514995 2522445 73881415
18. NET ELECTRICAL ENERGY GENERATED (MWH) 490554 2391 136 69880077
19. UNIT SERVICE FACTOR 100.0 73.1 62.8
20. UNIT AVAILABILITYFACTOR 100.0 73.1 63. 1
21. CAPACITY FACTOR (USING MDC NET) 99.0 70.6 61.0
22. CAPACITY FACTOR (USING OER NET) 95.1 67.8 57.7
23. UNIT FORCED OUTAGE RATE 0.0 26.9 11.7
24. SHUTDOWNS SCHEDULED OVFR NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT ur e oin DATE COMPLETED BY a an er TELEPHONE:

REPORT MONTH JUNE 1993 1, Unit reduced in power to to determine target fluxJuly On 4 was 85%

difference in accordance with Technical Specifications.

On July 8, the unit was reduced in power to 60% for tube plugging on the 4B turbine plant cooling water heat exchanger. Following the tube plugging, the unit was returned to 100% power and remained at essentially 100% power through the end of the month.