Moisture Separator Reheater (MSR)
- It separates moisture from the steam that is discharged from a high-pressure steam turbine.
- It reheats the high-pressure discharge steam, increasing its thermal energy (heat) before it is discharged to a low-pressure steam turbine, or turbines.
System |
|---|
|
|
| | Site | Start date | Title | Description |
|---|
| ML25268A301 | Browns Ferry | 25 September 2025 | Core Operating Limits Report for Unit 1 Cycle 16 Operation, Revision 1; Unit 2 Cycle 24 Operation, Revision 1; and Unit 3 Cycle 22 Operation, Revision 1 | | | NRC-25-0030, Transmittal of the Core Operating Limits Report for Cycle 23, Revision 1 | Fermi | 27 June 2025 | Transmittal of the Core Operating Limits Report for Cycle 23, Revision 1 | | | RA25-036, Cycle 21 Core Operating Limits Report | LaSalle | 26 June 2025 | Cycle 21 Core Operating Limits Report | | | IR 05000220/2025001 | Nine Mile Point | 28 May 2025 | Reissued Integrated Inspection Report 05000220/2025001 and 05000410/2025001 | | | ML25133A164 | Nine Mile Point | 13 May 2025 | Integrated Inspection Report 05000220/2025001 and 05000410/2025001 | | | IR 05000445/2025001 | Comanche Peak | 8 May 2025 | Integrated Inspection Report 05000445-2025001 and 05000446-2025001 | | | ML25086A180 | Fermi | 2 May 2025 | – Amendment 231 to Adopt TSTF-505, TSTF-439, TSTF-591 | | | IR 05000261/2025001 | Robinson | 29 April 2025 | Integrated Inspection Report 05000261/2025001 | | | NL-25-0068, Cycle 29 Core Operating Limits Report Version 1 | Hatch | 20 March 2025 | Cycle 29 Core Operating Limits Report Version 1 | | | ML25098A099 | | 13 March 2025 | 2025 Digital I&C Lessons Learned Workshop, Day 1 Transcript, Pages 1-118 03/13/2025 | |
|