Moisture Separator Reheater (MSR)
- It separates moisture from the steam that is discharged from a high-pressure steam turbine.
- It reheats the high-pressure discharge steam, increasing its thermal energy (heat) before it is discharged to a low-pressure steam turbine, or turbines.
System |
|---|
|
|
| | Site | Start date | Title | Description |
|---|
| ML26030A150 | Vogtle | 5 February 2026 | January 27, 2026, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Proposed Extended Power Uprate | | | ML26023A001 | Vogtle | 27 January 2026 | Power Uprate and Extended Fuel Cycle Licensing Strategy Meeting for Vogtle 1&2 (Slides) | | | IR 05000458/2025003 | River Bend | 22 December 2025 | Integrated Inspection Report 050000458/2025003 | | | ML25307A035 | Cook | 30 October 2025 | Updated Final Safety Analysis Report (Ufsar), Revision 33, Chapter 14, Section 14.4, Table 14.4.2-1, Equipment Required to Shutdown Reactor (Unit 2) | | | ML25282A058 | Point Beach | 9 October 2025 | Periodic Update of the Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (Redacted) | | | ML25283A009 | Point Beach | 9 October 2025 | Periodic Update of the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion (Redacted) | | | ML25268A301 | Browns Ferry | 25 September 2025 | Core Operating Limits Report for Unit 1 Cycle 16 Operation, Revision 1; Unit 2 Cycle 24 Operation, Revision 1; and Unit 3 Cycle 22 Operation, Revision 1 | | | ML25351A064 | Nine Mile Point | 23 September 2025 | Core Operating Limits Report for Nine Mile Point, Unit 2, Cycle 20 | | | NRC-25-0030, Transmittal of the Core Operating Limits Report for Cycle 23, Revision 1 | Fermi | 27 June 2025 | Transmittal of the Core Operating Limits Report for Cycle 23, Revision 1 | | | RA25-036, Cycle 21 Core Operating Limits Report | LaSalle | 26 June 2025 | Cycle 21 Core Operating Limits Report | |
|