Page 1 of I Perry Buckberg - 5/10 Phone conference From:
To:
Date:
Subject:
Perry Buckberg Edward Sanchez 5/10/2007 3:41:19 PM 5/10 Phone conference Please see the attached summary of today's conference and let me know if any changes are needed.
- Thanks, Perry file://C:\\temp\\GW}00002.HTM 5/31/2007
1, CAt6rý6va TW Page 1Iil c:\\t.m.\\.W..0.0......P.....
Mail Envelope Properties (4643755F.18E: 9 : 8248)
Subject:
Creation Date From:
Created By:
5/10 Phone conference 5/10/2007 3:41:19 PM Perry Buckberg PHB 1 @nrc.gov Recipients entergy.com PM esanchl (Edward Sanchez)
Action Transferred Date & Time 5/10/2007 3:41:28 Post Office Delivered Route entergy.com Files Size MESSAGE 575 TEXT.htm 416 MeetingSummary May 10 2007 (PNPS).wpd PM Date & Time 5/10/2007 3:41:19 PM 25764 5/10/2007 3:39:44 Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
ReplyRequested:
Return Notification:
Concealed
Subject:
Security:
To Be Delivered:
Status Tracking:
No None Yes Standard No None No Standard Immediate Delivered
LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY:
Pilgrim Nuclear Power Station
SUBJECT:
SUMMARY
OF CONFERENCE CALL ON MAY 10, 2007, WITH ENTERGY NUCLEAR OPERATIONS, INC., REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)
The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with Entergy Nuclear Operations, Inc., (Entergy) regarding the Pilgrim license renewal application (LRA) to discuss Pilgrim Safety Evaluation Report (SER) Open Item (01) 4.2, SER 01 3.0.3.3.2 and an item for the Pilgrim Audit. The conference call was conducted on Thursday May 10, 2007, between 2:00 p.m. and 3:00 p.m. at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. The following is a summary of the conference call.
The NRC Pilgrim Project Manager provided a brief introduction. The staff and Entergy then discussed updated requirements for calculating reactor vessel neutron embrittlement. The staff then reopened Pilgrim Audit item number 195 describing the need to credit a different aging management program for small bore valve bodies. Lastly, the staff discussed with Entergy the need to amend LRA commitment 45 to reflect more frequent testing of water if it continues to collect on from the torus room floor.
The applicant had an opportunity to comment on the meeting summary.
Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
List of Participants cc w/encl: See next page
LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION May 10, 2007 PARTICIPANTS Perry Buckberg Christoher Sydnor Ganesh Cheruveki Lambros Lois James Medoff Bryan Ford Fred Mogolesko Alan Cox Tim Griesbach AFFILIATION U.S. Nuclear Regulatory Commission (NRC)
NRC NRC NRC NRC Entergy Nuclear Operations, Inc. (Entergy)
Entergy Entergy Structural Integrity Associates ENCLOSURE