E-MAIL: (NPA-PD) 5/10 Phone Conference
ML071580985
Person / Time
Site: Pilgrim
Issue date: 05/10/2007
From: Perry Buckberg
NRC/NRR/ADRO/DLR
To: Sanchez E
Entergy Nuclear Operations
References
TAC MC9669, TAC MD3698
Download: ML071580985 (4)


Text

Page 1 of I Perry Buckberg - 5/10 Phone conference From: Perry Buckberg To: Edward Sanchez Date: 5/10/2007 3:41:19 PM

Subject:

5/10 Phone conference Please see the attached summary of today's conference and let me know if any changes are needed.

Thanks, Perry file://C:\temp\GW}00002.HTM 5/31/2007

1,CAt6rý6va TW c:\t.m.\.W..0.0......P..... Page 1Iil Mail Envelope Properties (4643755F.18E: 9 : 8248)

Subject:

5/10 Phone conference Creation Date 5/10/2007 3:41:19 PM From: Perry Buckberg Created By: PHB 1@nrc.gov Recipients Action Date & Time entergy.com Transferred 5/10/2007 3:41:28 PM esanchl (Edward Sanchez)

Post Office Delivered Route entergy.com Files Size Date & Time MESSAGE 575 5/10/2007 3:41:19 PM TEXT.htm 416 MeetingSummary May 10 2007 (PNPS).wpd 25764 5/10/2007 3:39:44 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered

LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Pilgrim Nuclear Power Station

SUBJECT:

SUMMARY

OF CONFERENCE CALL ON MAY 10, 2007, WITH ENTERGY NUCLEAR OPERATIONS, INC., REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)

The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with Entergy Nuclear Operations, Inc., (Entergy) regarding the Pilgrim license renewal application (LRA) to discuss Pilgrim Safety Evaluation Report (SER) Open Item (01) 4.2, SER 01 3.0.3.3.2 and an item for the Pilgrim Audit. The conference call was conducted on Thursday May 10, 2007, between 2:00 p.m. and 3:00 p.m. at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. The following is a summary of the conference call.

The NRC Pilgrim Project Manager provided a brief introduction. The staff and Entergy then discussed updated requirements for calculating reactor vessel neutron embrittlement. The staff then reopened Pilgrim Audit item number 195 describing the need to credit a different aging management program for small bore valve bodies. Lastly, the staff discussed with Entergy the need to amend LRA commitment 45 to reflect more frequent testing of water if it continues to collect on from the torus room floor.

The applicant had an opportunity to comment on the meeting summary.

Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

List of Participants cc w/encl: See next page

LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION May 10, 2007 PARTICIPANTS AFFILIATION Perry Buckberg U.S. Nuclear Regulatory Commission (NRC)

Christoher Sydnor NRC Ganesh Cheruveki NRC Lambros Lois NRC James Medoff NRC Bryan Ford Entergy Nuclear Operations, Inc. (Entergy)

Fred Mogolesko Entergy Alan Cox Entergy Tim Griesbach Structural Integrity Associates ENCLOSURE