01/23/2007 Summary of Conference Call with Entergy Nuclear Operations, Inc., Pilgrim License Renewal Application to Discuss Ut of Drywell Shell, Water on Torus Room Floor & to Request Documentation for Periodic Testing of Fire Water System
ML070300793
Person / Time
Site: Pilgrim
Issue date: 02/16/2007
From: Perry Buckberg
NRC/NRR/ADRO/DLR/RLRA
To:
Entergy Nuclear Operations
Buckberg, P., PM, RLRA, 415-1383
References
TAC MC9669
Download: ML070300793 (6)


Text

February 16, 2007LICENSEE: Entergy Nuclear Operations, Inc.FACILITY:Pilgrim Nuclear Power Station

SUBJECT:

SUMMARY

OF CONFERENCE CALL ON JANUARY 23, 2007, WITH ENTERGYNUCLEAR OPERATIONS, INC., REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with EntergyNuclear Operations, Inc., (Entergy or the applicant) regarding the Pilgrim license renewal application (LRA) to discuss ultrasonic testing (UT) of the drywell shell, water on the torus room floor and to request documentation for periodic testing of Fire Water System equipment (License Renewal Application Section B.1.13.2). The conference call was conducted on Tuesday, January 23, 2007, between 2:00 p.m. and 3:00 p.m. at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. The following is a summary of the conference call.The NRC Pilgrim Project Manager provided an introduction and the meeting then began withthe fire water system. The staff requested that the applicant provide approved guidance documents that include fire hydrant hose hydrostatic testing, gasket inspections, and fire hydrant flow test. Next, the staff requested that the applicant clarify recently submitted UT data.

And finally, the staff and the applicant discussed additional UT data recordings and torus room water testing. The applicant agreed to identify the current license basis document that covers the described Fire Water System tests. The applicant described a plan to perform additional UT in areas previously tested, and provide documentation to the NRC. The applicant offered to provide a rationale on testing the functionality of drywell shell sand bed drains. In addition, the applicant offered to provide a plan to analyze and document water that accumulates on the torus room floor. The applicant had an opportunity to comment on the meeting summary./RA/Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-293

Enclosure:

As stated cc w/encl: See next page

ML070300793C:\FileNet\ML070300793.wpdOFFICELA:DLRPM:RLRA:DLRBC:RLRA:DLROGCNAMEPBuckbergLLundSUttal DATE2/ 1 /072/ 1 /072/ 7 /072/ 16 /07 Note to Entergy Nuclear Operations, Inc., from P. Buckberg Dated January xx, 2007

SUBJECT:

SUMMARY

OF CONFERENCE CALL ON JANUARY 23, 2007, WITH ENTERGYNUCLEAR OPERATIONS, INC., REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)HARD COPYDLR R/FE-MAIL: JFairRWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva

RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff


PBuckberg SHoffman SUttal JShea JDavis CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1 Pilgrim Nuclear Power Station cc:Regional Administrator, Region IU. S. Nuclear Regulatory Commission

475 Allendale Road King of Prussia, PA 19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station P.O. Box 867 Plymouth, MA 02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA 02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA 02332Office of the CommissionerMassachusetts Department of Environmental Protection One Winter Street Boston, MA 02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA 02108MA Department of Public HealthRadiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Pilgrim Nuclear Power Station cc:Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCannDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113Mr. James Sniezek5486 Nithsdale Drive Salisbury, MD 21801Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Plymouth Public LibraryAttn: Dinah O'Brien 132 South Street Plymouth, MA 02360Duxbury Free LibraryAttn: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332

Kingston Public Library Attn: Reference Librarian 6 Green Street Kingston, MA 02364Ms. Mary LampertDuxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332 LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATIONJanuary 23, 2007PARTICIPANTSAFFILIATIONPerry BuckbergU.S. Nuclear Regulatory Commission (NRC)James DavisNRC Dan HoangNRC Peter WenNRC Fred MogoleskoEntergy Nuclear Operations, Inc. (Entergy)

Bryan FordEntergy Matt LandryEntergy Steve BurkeEntergy Rich Pardee EntergyGary Dyckman EntergyENCLOSURE 1