July 16, 2007
SUBJECT:
PILGRIM NUCLEAR POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000293/2007402
Dear Mr. Bronson:
On June 7, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on June 7, 2007, with Mr. Douglas Murphy, Assistant Manager, Operations Support and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Warning: Violation of section 147 of the Atomic Energy Act, Safeguards Information is subject to civil and criminal penalties DETERMINATION MADE BY:
NAME/TITLE: James M. Trapp, Chief ORGANIZATION: RI/DRS/PSB1 BASIS - DG-SG-1 (300) Physical Protection Program SIGNATURE____/RA/_________ DATE: 07/11/07 Mr. This report documents one finding of very low safety significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site.
NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violation and because it is entered into your corrective action program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Pilgrim Nuclear Power Station.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.
50-293 License No.
DPR-35 Mr. This report documents one finding of very low safety significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site.
NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violation and because it is entered into your corrective action program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Pilgrim Nuclear Power Station.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.
50-293 License No.
DPR-35 DOCUMENT NAME: C:\\FileNet\\ML071970168.wpd ADAMS ACCESSION NO. ML071970168 SUNSI Review Complete: ___JMT_________ (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public (letter only)
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure
"N" = No copy OFFICE RI/DRS E
RI/DRS RI/DRS RI/DRS NAME ADimitriadis/AXD PFrechette/AXD for GeoSmith/JMT for JTrapp/JMT DATE 07/06/07 07/06/07 07/11/07 07/11/07 OFFICIAL RECORD COPY
- See Previous Concurrence Page Mr. Enclosure:
Inspection Report No. 05000293/2007402 w/Attachment: Supplemental Information (CONTAINS (SGI)
cc w/encl; w/SGI F. Marcussen - Security Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency cc w/o encl w/o SGI:
G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.
J. T. Herron, Senior Vice President M. Balduzzi, Senior Vice President, Northeastern Regional Operations S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. DeRoy, Vice President, Operations Support Sr. Vice President, Engineering and Technical Services J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing J. Ventosa, Manager, Engineering E. Harkness, Director of Oversight, Entergy Nuclear Operations, Inc.
B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.
R. Smith, Manager, Plant Operations W. Dennis, Assistant General Counsel S. Lousteau, Treasury Department, Entergy Services, Inc.
Director, Radiation Control Program, Commonwealth of Massachusetts W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network Chairman, Citizens Urging Responsible Energy J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant J. Doering W. Meinert, Nuclear Engineer Commonwealth of Massachusetts, Secretary of Public Safety Mr. Distribution w/o encl w/o SGI:
S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO R. Powell, DRP B. Norris, DRP M. Kowal, NRR J. Kim, PM, NRR J. Boska, NRR J. Lubinski, NRR C. Welch, DRP, Resident Inspector A. Ford, DRP, Resident OA Region I Docket Room (with concurrences)
ROPreports@nrc.gov M. Gamberoni, DRS J. Trapp, DRS Distribution w/encl w/SGI:
A. Dimitriadis, DRS S. Schneider - Senior Resident Inspector D. Riffle, NSIR