E-MAIL: (PA) Inspection Exit Meeting - Plymouth - 01.30.07
ML070720361
Person / Time
Site: Pilgrim
Issue date: 02/01/2007
From: Perry Buckberg
NRC/NRR/ADRO/DLR
To: Lampert M
Pilgrim Watch
References
TAC 3698
Download: ML070720361 (19)


Text

Page 1 of 1 Perry Buckberg - RE: Inspection Exit Meeting -Plymouth - 01.30.07 From:

Perry Buckberg To:

Mary Lampert Date:

2/1/2007 1:11 PM

Subject:

RE: Inspection Exit Meeting -Plymouth - 01.30.07

Mary, Attached is the presentation Region I made on Tuesday.

The license renewal schedule was not updated in time to reflect the meeting - it was my error. The meeting notice was placed on NRC's public site January 17th and the press release was made on Jan. 23rd.

Thanks, Perry

>>> "Mary Lampert" <mary.lampert@comcast.net> 1/31/2007 2:17 PM >>>

Perry:

RE: Inspection Exit Meeting -Plymouth - 01.30.07 Please send electronically [not in wpd-many can not open those documents] - slides presented last evening - as discussed the public was not properly notified and many interested parties were unable to attend.

Thanks you, Mary Lampert Pilgrim Watch file://C:\\temp\\GW }00002,HTM 3/12/2007

mp\\GWJ00008.TMP I~

c:\\temp\\GW}00008.TMP P~e71~

Mail Envelope Properties (45C22D34.4CB 9: 8248)

Subject:

Creation Date From:

Created By:

Recipients comcast.net mary.lampert RE: Inspection Exit Meeting -Plymouth - 01.30.07 2/1/2007 1:11:00 PM Perry Buckberg PHB 1 @nrc.gov (Mary Lampert)

Action Transferred Delivered Date & Time 2/1/2007 1:11:23 PM Post Office Route comcast.net Files Size MESSAGE 1624 TEXT.htm 1969 Pilgrim LR Exit Slides with drywell-l.ppt PM Date & Time 2/1/2007 1:11:00 PM 192512 1/29/2007 3:20:46 Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

ReplyRequested:

Return Notification:

Concealed

Subject:

Security:

To Be Delivered:

Status Tracking:

No None Yes Standard No None No Standard Immediate Delivered

Introductions

m Glenn Meyer, Team Leader

  • NRC Participants
  • Entergy Participants

Meeting Purpose m Present Inspection Results to Entergy

  • Provide Entergy Opportunity to Respond

.Agenda

  • Begin with General Process Discussion
  • Conduct Exit Meeting m End with Public Questions-to NRC

License Renewal Rule

-~-------1-------------------

-~

m Law & Regulation

- Process

. Safety Scope

License Renewal Process 1ý1 -1 1

Environmental Track

/

Environmental Impact Statement 2

Safety - Audit Track Final SER Safety - Technical Reviewer Track Final SER 4 Safety -Regional InspectionTrack Inspection Report and Final SER

I Pilgrim Safety Review Track 3/28/06 FRN Published Opportunity for Hearing 0

5/22 AMP6I 1/27/06 LRA ReceivedT

/06 10/2/06 Audit RI-Scoping 6/19/06 Inspection (2 nd week)

AMR Audit9,-

3/1/07 07/1/07 SER With Open Items Issue SER T

T9 11/27/07 22mo. Decision T

7/27/08 30mo. Decision T

I 1

I I

I I

I I

I I

I' I

I I

I I

I I

I I

I I

I I

I I

I I

1 I

1/06 2/06 3/06 4/06 5/06 6/06 7/06 8/06 9/06 10/06 11/06 12106 1/07 2/07 3/07 4/07 5/07 6/07 7107 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4108 5/08 6/08 7108 8/08 9/08 Opportunity Scoping Screening Audit ng 6/6/06 I

RI-Scoping Inspection 9/18/06 I

ACRS Sub Committee ACRS Full Committee 4/07 9/07 Public Meetir 3/8/06 TODAY 1/30/07

Pilgrim Environmental Review 5/1/06 Env. Site Audit 7/14/06 RAIs Issued 12/8/06 DEIS 7/27/07 11/27/07 7/27/08 Final SEIS Issued 22mo. Decision 30mo. Decision 8/24/06 1/27/06 LRA ReceiN Dec 2005 Sep 2008 Public Meeting 5/17/06 1/24/07 Public Meeting 3/8/06 TODAY 1/30/07

Safety Scope m Safety Systems

  • Some Non-safety Systems

" Systems Related to Special Regulations

Inspection L

EL

  • Performed by Region I
  • Six inspectors for two weeks in September &October 2006
  • Follow up in December 2006

m Inspection Activities

  • Walk downs of plant systems &

structures

  • Review of procedures and records

Inspection Results

  • Seven closed issues, including one with follow-up inspection m If drywell issue resolved, reasonable assurance of management of aging

Drywell Issue

  • Staff Guidance

" Pilgrim position

" Inspection determinations

)UIPMEN POOL REFUELrNO CAVITY SPENT FUEL POOL L _-Q DBV -51 F-L a

r a

I

_W-5.. -

DF YWELL VENT PIPI TORUS I.

'A",

.2

&=Lei i.e.

I 1;

A

I Scoping Issue Non-safety systems directly connected to safety systems - unclear boundaries

  • Additional Entergy evaluation effort

" Follow-up inspection

Closed Items

" Heat Exchanger Monitoring

" Diesel Fuel Oil Monitoring

- Lube Oil Analysis

- Concrete Monitoring

- Buried Piping Inspection

" Plant Stack Foundation

Entergy Response

Public Questions

Pilgrim License Renewal Inspection Exit Meeting Nuclear Regulatory Commission Plymouth, MA January 30, 2007