March 19, 2007 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.
(Pilgrim Nuclear Power Station)
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR
Dear Administrative Judges:
The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachment 2, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5),
and is continuing to preserve and maintain all privileged documents during the pendency of this
R. Cole March 19, 2007 P. Abramson A. Young proceeding. Also attached are the Affidavit of Perry Buckberg, as required by 10 C.F.R.
§ 2.336(c), and the Declaration of Pao-Tsin Kuo, Acting Director of the Division of License Renewal, formally invoking the deliberative process privilege.
Sincerely,
/RA/
Molly L. Barkman Counsel for the NRC Staff
Enclosures:
Hearing File Index Privilege Log - Deliberative Process Affidavit of Perry Buckberg Declaration of Pao-Tsin Kuo cc:
Attached Service List
ATTACHMENT 1 PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 4 - March 15, 2007 Accession Number Document Date Title/Description:
04-01 ML070660279 8/22/2006 Email from Fred Mogolesko, Entergy, dtd 8/22/06 re: Pilgrim AMP Review.
04-02 ML070670089 8/24/2006 Email from Fred Mogolesko, Entergy, dtd 8/24/06 re: Pilgrim AMP Review.
04-03 ML070660056 8/28/2006 Email from Fred Mogolesko, Entergy, dtd 8/28/06 re: Preparation for Region I Inspection at Pilgrim.
04-04 ML070660526 9/14/2006 Email from Glenn Meyer dtd 9/14/06 re: Planning for Initial Contacts.
04-05 ML070670035 10/12/2006 Email from Timothy OHara dtd 10/12/06 re: An Update.
04-06 ML070430254 1/18/2007 Comment (1) Of Joan Bartlett Re Pilgrim Power Plan In Plymouth, Requesting Part Of The Negotiations Between Entergy And Town Of Plymouth Include Preservation Of Entergy Land So That For Safety Reasons, No More Development Will Take Place Near The Plant.
04-07 ML070430260 1/28/2007 Comment (2) of Rebecca Hall Opposing the Re-Licensing of Pilgrim Nuclear Plant in 2008.
04-08 ML063480333 2/2/2007 Audit and Review Report for Plant Aging Management Reviews and Programs for the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).
04-09 ML070430263 2/5/2007 Comment (3) of Mary Lampert on Draft Supplemental Environmental Review -
Draft NUREG-1437, Supplement 29 -Summary.
04-10 ML070680351 2/7/2007 E-MAIL: Pilgrim Meeting Handouts.
04-11 ML070510463 2/8/2007 Letter Dated February 8, 2007 From Massachusetts Historical Commission, Brona Simon, Regarding Pilgrim Nuclear Power Station License Renewal Application,
- RC36661.
04-12 ML070470406 2/14/2007 Comment (4) of Mary Lampert on Behalf of Pilgrim Watch regarding Draft NUREG-1437, Supplement 29.
Accession Number Document Date Title/Description:
04-13 ML070680341 2/15/2007 E-MAIL: Re: Pilgrim SEIS.
04-14 ML070300793 2/16/2007 01/23/2007 Summary of Conference Call with Entergy Nuclear Operations, Inc.,
Re: Pilgrim License Renewal Application to Discuss Ut of Drywell Shell, Water on Torus Room Floor & to Request Documentation for Periodic Testing of Fire Water System Equipment.
04-15 ML070660107 2/18/2007 Comment (5) of Heidi Mayo Opposing Draft Supplemental Environmental Review of NUREG-1437, Supplement 29.
04-16 ML070540299 2/22/2007 2007/02/22-Comment (24) submitted by Pilgrim Watch, Mary Lampert on Proposed Rules PR-50, PR-72, PR-73, regarding Power Reactor Security Requirements.
04-17 ML070540303 2/22/2007 2007/02/22-Comment (25) submitted by Sheila Lynch on Proposed Rules PR-50, PR-72, and PR-73, regarding Power Reactor Security Requirements.
04-18 ML070660114 2/23/2007 Comment (6) of Rebecca Chin Opposing Re-Licensing of Pilgrim Nuclear Plant in 2008.
04-19 ML070650350 2/23/2007 Pilgrim License Renewal Application Amendment 14.
04-20 ML070720348 2/23/2007 E-MAIL: (PA) LRA amendment 14 (Entergy letter 2.07.023).
04-21 ML070660117 2/25/2007 Comment (7) of Lilias Cingolani Opposing Re-Licensing of Pilgrim Nuclear Plant in 2008.
04-22 ML070660079 2/27/2007 Comment (16) of Stephen J. Bethay, on Behalf of Entergy Nuclear Operations, Inc.,
on NUREG-1437, Supplement 29, Regarding Generic Environmental Impact Statement for License Renewal of Pilgrim Nuclear Power Station.
04-23 ML070660059 2/27/2007 Comment (17) of Mary Osborn Opposing Relicensing of Pilgrim Nuclear Power Plant (NUREG-1437, Suppl. 29).
04-24 ML070660122 2/27/2007 Comment (8) of Millie Morrison Opposing Relicensing of Pilgrim Nuclear Power Station.
Accession Number Document Date Title/Description:
04-25 ML070660135 2/28/2007 Comment (10) of Robert W. Varney on Behalf of United States Environmental Protection Agency, Region 1 regarding Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants Supplement 29 regarding Pilgrim Nuclear Power Station.
04-26 ML070660273 2/28/2007 Comment (11) of Pine duBois on Behalf of Jones River Watershed Association on NRCs NUREG-1437, Supplement 29 Draft Report Regarding Pilgrim Nuclear Power Station.
04-27 ML070660285 2/28/2007 Comment (12) of Paul E. McCormack Opposed to Permanent Storage of Nuclear Waste at Pilgrim Nuclear Power Plant.
04-28 ML070660240 2/28/2007 Comment (13) of Brian Thurber, Frank Gorke and Alyssa Schuren Opposing the NUREG-1437, Supplement 29 Draft.
04-29 ML070660293 2/28/2007 Comment (14) of Diana L. Woebcke Opposing Application Renewal for Pilgrim Nuclear Power Station.
04-30 ML070660326 2/28/2007 Comment (15) of Robert S. Knorr on the Draft Supplemental Environmental Impact Statement on the Pilgrim Nuclear Power Station located in Plymouth Massachusetts (NUREG-1437, Supplement 29).
04-31 ML070660133 2/28/2007 Comments (9) of Diane Curran and Matthew Brock on Behalf of Massachusetts Attorney General Martha Coakley Opposing Draft Supplemental 29 to Generic EIS for License Renewal of Pilgrim Nuclear Power Plant.
04-32 ML070720351 2/28/2007 E-MAIL: (PA) 2/26 Conference Call Record.
ATTACHMENT 2: PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGE Supplement 4: March 15, 2007 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 01 ML070660477 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 08/14/06 re: Pilgrim License Renewal Team.
8/14/2006 E-Mail Blough A R, NRC/RGN-I/DRS Discussion of license renewal inspection team 3
DP 02 ML070670240 Blough A R, NRC/RGN-I/DRS PD_Email from A.
Randolph Blough dtd 8/18/06 re: Pilgrim License Renewal Team.
8/18/2006 E-Mail Meyer G W, NRC/RGN-I/DRS/EB1 Discussion of license renewal inspection team 1
DP 03 ML070670041 Subbaratna m R, NRC/NRO/
DNRL/NGIF PD_Email from Ram Subbaratnam dtd 8/18/06 re: Cable Vaults with Submerged Cables.
8/18/2006 E-Mail Raymond W J, NRC/RGN-I/DRP/PB5 Comments and recommendations for SER 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 04 ML070660076 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 8/28/06 re: Fwd:
Pilgrim License Renewal questions.
8/28/2006 E-Mail Davis J A, NRC/NRR/ADR O/DLR Comments and recommendations for SER 2
DP 05 ML070660570 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 8/28/06 re:
Preparations for Pilgrim License Renewal.
8/28/2006 E-Mail Chaudhary S K, Johnson D C, Kaufman P D, Lewis S A, OHara T L, Richmond J E, NRC Comments and recommendations for SER 3
DP 06 ML070670044 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 9/15/06 re:
Consolidated list of AMPs.
9/15/2006 E-Mail Chaudhary S K, Johnson D, Kaufman P D, Lewis S, Miller B W, OHara T, Richmond J E, NRC Comments and recommendations for SER 3
DP 07 ML070670079 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 9/15/06 re:
Consolidated list of AMPs.
9/15/2006 E-Mail Kaufman P D, NRC/RGN-I/DRS/PSB2 Comments and recommendations for SER 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 08 ML070670067 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 9/15/06 re:
Document Requests for Pilgrim License Renewal Inspection.
9/15/2006 E-Mail Kaufman P D, NRC/RGN-I/DRS/PSB2 Draft Requests for Information regarding license renewal 2
DP 09 ML070660026 Kaufman P D,
NRC/RGN-I/DRS/PSB 2
PD_Email from Paul Kaufman dtd 9/15/06 re: Document Requests for Pilgrim License Renewal Inspection.
9/15/2006 E-Mail Meyer G W, NRC/RGN-I/DRS/EB1 Draft Requests for Information regarding license renewal 2
DP 10 ML070660263 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 9/25/06 re: Operating Experience.
9/25/2006 E-Mail Chaudhary S K, Johnson D C, Kaufman P D, Lewis S A, Miller B W, OHara T L, Richmond J E, Comments and recommendations for SER 3
DP 11 ML070660147 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 9/28/06 re: Fwd:
Pilgrim License Renewal questions.
9/28/2006 E-Mail Auluck R, NRC/NRR/ADR O/DLR Comments and recommendations for SER 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 12 ML070660415 Kaufman P D,
NRC/RGN-I/DRS/PSB 2
PD_Email from Paul Kaufman dtd 09/28/06 re: Pilgrim License Renewal Inspection Report Input.
9/28/2006 E-Mail Meyer G W, NRC/RGN-I/DRS/EB1 Comments regarding license renewal inspection 2
DP 13 ML070660297 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/4/06 re: Pilgrim Briefing Materials.
10/4/2006 E-Mail Conte R J, NRC/RGN-I/DRS/EB1 Draft summary of inspection conclusions 2
DP 14 ML070660436 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/05/06 re: Pilgrim License Renewal Results.
10/5/2006 E-Mail Conte R J, Diederich K, NRC/RGN-I/DRS/EB1 Draft summary of inspection conclusions 3
DP 15 ML070660020 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/6/06 re:
Alternative to rerun of the Pilgrim LR exit.
10/6/2006 E-Mail Conte R J, NRC/RGN-I/DRS/EB1 Discussion of post-inspection procedures.
2 DP 16 ML070660159 Diederich K, NRC/RGN-I/DRS/EB1 PD_Email from Karl Diederich dtd 10/6/06 re: Fwd: Pilgrim License Renewal Results.
10/6/2006 E-Mail Gamberoni M K, NRC/RGN-I/DRS Discussion of notes from renewal inspection.
2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 17 ML070660594 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/10/06 re: Agreed -
Alternative to Pilgrim LR debrief.
10/10/2006 E-Mail Conte R J, NRC/RGN-I/DRS/EB1 Discussion of post-inspection procedures.
2 DP 18 ML070660174 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/12/06 re: Fwd:
PNPS: Potential RAI as a result of Region I inspector finding.
10/12/2006 E-Mail OHara T L, NRC/RGN-I/DRS/PSB2 Proposed Request for Additional Information 2
DP 19 ML070670061 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/12/06 re: Fwd:
10/12/2006 E-Mail Auluck R, NRC/NRR/ADR O/DLR/RLRA Proposed Request for Additional Information 2
DP 20 ML070670125 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/12/06 re: Pilgrim Report Input?.
10/12/2006 E-Mail OHara T L, NRC/RGN-I/DRS/PSB2 Discussion about draft of inspection report 2
DP 21 ML070660179 Auluck R, NRC/NRR/
ADRO/DLR PD_Email from Rajender Auluck dtd 10/12/06 re: Fwd:
PNPS: Potential RAI as a result of Region I inspector finding.
10/12/2006 E-Mail Meyer G W, NRC/RGN-I/DRS/EB1 Proposed Request for Additional Information 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 22 ML070660184 Auluck R, NRC/NRR/
ADRO/DLR PD_Email from Rajender Auluck dtd 10/12/06 re: Fwd:
10/12/2006 E-Mail Meyer G W, NRC/RGN-I/DRS/EB1 Proposed Request for Additional Information 2
DP 23 ML070670118 OHara T L, NRC/RGN-I/DRS/PSB 2
PD_Email from Timothy OHara dtd 10/12/06 re: Pilgrim Report Input?.
10/12/2006 E-Mail Meyer G W, NRC/RGN-I/DRS/EB1 Discussion about draft of inspection report 2
DP 24 ML070660027 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/16/06 re: Drywell issue briefing.
10/16/2006 E-Mail Conte R J, OHara T L, NRC/RGN-I/DRS/EB1, NRC/RGN-I/DRS/PSB2 Draft and comments on drywell 2
DP 25 ML070650615 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/17/06 re: 3 PM Conf Call - Pilgrim LR Debrief & Oyster Creek Drywell Update.
10/17/2006 E-Mail Auluck R C, Blough A R, Conte R J, Gamberoni M K, OHara T L, NRC/NRR/ADR O/DLR/RLRB, NRC/RGN-I/DRS, NRC/RGN-I/DRS/EB1, NRC/RGN-I/DRS/PSB2 Comments on renewal inspection.
3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 26 ML070660066 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/17/06 re: Fwd:
ASLB Ruling on Pilgrim.
10/17/2006 E-Mail OHara T L, NRC/RGN-I/DRS/PSB2 Comments on admitted contentions.
2 DP 27 ML070660197 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 10/17/06 re: Fwd:
Proposed RAI for Pilgrim Drywell.
10/17/2006 E-Mail Auluck R C, NRC/NRR/ADR O/DLR Comments on proposed RAI 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 28 ML070660039 Raymond W J, NRC/RGN-I/DRP/PB5 PD_Email from William Raymond dtd 10/17/06 re: Ex Parte Communications and the G2G Meeting.
10/17/2006 E-Mail Barkley R S, Blough A R, Correia R P, Dentel G T, Ford A F, Gallagher K L, Gibney L A, Heater K A, Leeds E J, Lorson R K, Lund L A, Madison A L, Marziale R S, McLaughlin M M, McMurtray A C, McNamara N T, Meyer G W, Milligan P A, Miskey C M, Newman G A, Powell R J, Ruland W H, Screnci D P, Shane R M, Shea J J, Sieller N S, Sosa B X, Subbaratnam R, Walker T E, Welch C R, Westreich B C, Questions and comments regarding ex parte communications 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 29 ML070670102 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 11/8/06 re: Pilgrim drywell - onsite followup of UT data.
11/8/2006 E-Mail Blough A R, Conte R J, Hiland P L, Lund A L, OHara T L, NRC/NRR/ADE S/DE, NRC/NRR/ADR O/DLR, NRC/RGN-I/DRP, NRC/RGN-I/DRS/EB1, NRC/RGN-I/DRS/PSB2 Comments on drywell and inspection 3
DP 30 ML070660248 Meyer G W, NRC/RGN-I/DRS/EB1 PD_Email from Glenn Meyer dtd 11/28/06 re: Input to Entergy Drop-in; LR Inspection Status.
11/28/2006 E-Mail Buckberg P H, Lund A L, NRC/NRR/ADR O/DLR Comments and questions about inspection and meeting 3
DP 31 ML070330636 Weerakkod y S D, NRC/NRR/
ADRA/DRA/
AFPB Safety Evaluation input Regarding the License Renewal Application - Pilgrim Nuclear Power Station - Fire Protection Program (TAC NO. MC9669).
2/1/2007 Memoranda, Safety Evaluation Lund A L, NRC/NRR/ADR O/DLR/RLRA Comments and input regarding SE 17
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 32 ML070710234 Jones J, Legin Group, Inc E-MAIL: (PD)
Requested Document:. (Dtd.
2/2/07).
2/2/2007 E-Mail Buckberg P H, NRC/NRR/ADR O/DLR Comments on Draft SER 139 DP 33 ML070400082 Pope S, ISL, Inc E-MAIL: (PD)
Delivery of Subtask 3, Evaluation of and Comments on ISLs SOW SER Section in the draft Pilgrim SER Section 2 input.
2/5/2007 E-Mail Stubbs A, NRC/NRR/ADE S/DSS/SBPB Comments on Draft SER 147 DP 34 ML070710231 Jones J, Legin Group, Inc E-MAIL: (PD)
Requested Document (Dtd.
2/6/07).
2/6/2007 E-Mail Buckberg P H, NRC/NRR/ADR O/DLR Comments on Draft SER 133 DP 35 ML070710220 Jones J, Legin Group, Inc E-MAIL: (PD)
Requested Documents (Dtd.
2/7/07).
2/7/2007 E-Mail Buckberg P H, NRC/NRR/ADR O/DLR Comments on Draft SER 160 DP 36 ML070400115 Stubbs A, NRC/NRR/
ADES/DSS E-MAIL: (PD) SBPB Comments on Draft Pilgrim SER.
2/7/2007 E-Mail Buckberg P H, NRC/NRR/ADR O/DLR Comments on Draft SER 8
DP 37 ML070710200 Jones J, Legin Group, Inc E-MAIL: (PD)
Requested Documents (Dtd.
2/9/07).
2/9/2007 E-Mail, Safety Evaluation Report Buckberg P H, NRC/NRR/ADR O/DLR Comments on Draft SER 119
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 38 ML070610146 Davis J A, NRC/NRR/
ADRO/DLR/
RLRC E-MAIL: (PD)
Commitment 3.
2/13/2007 E-Mail Buckberg P H, NRC/NRR/ADR O/DLR/RLRA Comments on Draft SER 2
DP 39 ML070710313 Jones J, Legin Group, Inc E-MAIL: (PD) PNPS SER Section 3 Comments.
2/13/2007 E-Mail Buckberg P H, NRC/NRR Comments on Draft SER 6
DP 40 ML070730296 Buckberg P H,
NRC/NRR/
ADRO/DLR/
RLRA E-MAIL: (PD) Fwd:
Delivery of Subtask 2, Recommended Inspection Items for Regional Inspection, for Contract # NRC-.
2/14/2007 E-Mail Raymond W J, NRC/RGN-I/DRP/PB5 Comments on Draft SER and inspection 4
DP 41 ML070730300 Buckberg P H,
NRC/NRR/
ADRO/DLR E-MAIL: (PD) Re:
Fwd: Delivery of Subtask 2, Recommended Inspection Items for Regional Inspections, for Contract #.
2/15/2007 E-Mail Raymond W J, NRC/RGN-I/DRP/PB5 Comments on Draft SER and inspection 3
DP 42 ML070670251 Pilgrim Drywell Issue
- 10/17/06.
2/15/2007 Draft memo Draft memo regarding drywell 2
DP 43 ML070670360 Meyer G W, NRC/RGN-I/DRS/EB1 Pilgrim LR Inspection Briefing - Oct. 4 AM.
2/15/2007 Meeting Summary Comments on inspection 2
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 44 ML070730220 Buckberg P H,
NRC/NRR/
ADRO/DLR/
RLRA E-MAIL: (PD) SER Section 3
[Attachment PNPS SER Section 3.0-3.7 draft deliv PB 2 2007.wpd].
2/16/2007 Safety Evaluation Report, Draft Comments on Draft SER 440 DP 45 ML070570213 Stubbs A, NRC/NRR/
ADES/DSS/
SBPB E-MAIL: (PD) SBPB Concurrence Recommendation for Pilgrim Nuclear Power Station License Renewal SER with Ols.
2/21/2007 E-Mail Segala J P, NRC/NRR/ADE S/DSS/SBPB Comments on Draft SER 2
DP 46 ML070650607 Stubbs A, NRC/NRR/
ADES/DSS/
SBPB E-MAIL: (PD) Re:
Fwd: Delivery of Subtask 2, Recommended Inspection Items for Regional Inspection for Contract #.
2/26/2007 E-Mail Buckberg P H, NRC/NRR/ADR O/DLR Comments on Draft SER and inspection 3
DP 47 ML070730310 Buckberg P H,
NRC/NRR/
ADRO/DLR/
RLRA E-MAIL: (PD) Re:
Fwd: Delivery of Subtask 2, Recommended Inspection Items for Regional Inspection, for Contract #.
2/26/2007 E-Mail Diaz-Sanabria Y K, NRC/NRR/ADR O/DLR/RLRA Comments on Draft SER and inspection 3
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count DP 48 ML070730318 Buckberg P H,
NRC/NRR E-MAIL: (PD) Fwd:
Pilgrim License Renewal SER with OIs.
2/27/2007 E-Mail Schaaf R G, NRC/NRR Comments on Draft SER 2
DP 49 ML070730320 Buckberg P H,
NRC/NRR/
ADRO/DLR E-MAIL: (PD) Fwd:
Pilgrim LRA, SER Section 2.4 Review.
2/27/2007 E-Mail Schaaf R G, NRC/NRR/ADR O/DLR/REBB Comments on Draft SER 2
DP 50 ML070730261 Buckberg P H,
NRC/NRR/
ADRO E-MAIL: (PD) Fwd:
Recommending Concurrence of Pilgrim LRA SER Section 2.4 with Comments.
2/27/2007 E-Mail Sanabria Y K, Schaaf R G, NRC/NRR Comments on Draft SER 2
DP 51 ML070670257 Pilgrim License Renewal Input -
Kaufman.
2/28/2007 Draft Draft section of SER 4
March 15, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR GENERATION
)
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 06-848-02-LR
)
(Pilgrim Nuclear Power Station)
)
AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)
I, Perry Buckberg, do hereby state as follows:
1.
I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
2.
I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
/Original Signed by/
Perry Buckberg Executed in Rockville, MD this 15th day of March, 2007
March 15, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR GENERATION
)
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 06-848-02-LR
)
(Pilgrim Nuclear Power Station)
)
DECLARATION OF PAO-TSIN KUO I, Pao-Tsin Kuo, do hereby state as follows:
- 1.
I am employed as the Director of the Division of Licensing Renewal (DLR) in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Pilgrim Nuclear Power Station license renewal application.
- 2.
As part of their responsibilities in preparing the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staffs deliberative process. Those documents are listed in Attachment 2 to the March 15, 2007, submission of the Staffs Hearing File.
- 3.
I have personally reviewed the documents identified as privileged in Attachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staffs review of the license renewal application. All documents contain either the Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative process necessary to the Staffs review of the pending license renewal application.
- 4.
Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
- 5.
Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the March 15, 2007 submission of the Hearing File Supplement 4.
- 6.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
/Original Signed By/
Pao-Tsin Kuo Executed in Rockville, MD this 15th day of March, 2007
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR OPERATIONS, INC. )
Docket No. 50-293-LR
)
(Pilgrim Nuclear Power Station)
)
ASLBP No. 06-848-02-LR
)
CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and mandatory disclosures, privilege log, accompanying declaration, and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 19th day of March 2007.
Administrative Judge*
Richard F. Cole Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rfc1@nrc.gov Administrative Judge*
Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: amy@nrc.gov Sheila Slocum Hollis**
Duane Morris LLP 1667 K Street, NW, Suite 700 Washington, DC 20006 E-mail: sshollis@duanemorris.com Administrative Judge*
Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: pba@nrc.gov Office of Commission Appellate
- Adjudication Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAMail@nrc.gov Office of the Secretary*
Attn: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov Atomic Safety and Licensing Board*
Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Molly H. Bartlett, Esq.**
52 Crooked Lane Duxbury, MA 02332 E-mail: mollyhbartlett@hotmail.com Chief Kevin M. Nord**
Fire Chief & Director Duxbury Emergency Management Agency 668 Tremont Street Duxbury, MA 02332 E-mail: nord@town.duxbury.ma.us Fax: 781-934-6530 Terence A. Burke, Esq.**
Entergy Nuclear 1340 Echelon Parkway Mail Stop: M-ECH-62 Jackson, MS 39213 David R. Lewis, Esq.**
Paul A. Gaukler, Esq.
Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Town Manager**
Town of Plymouth 11 Lincoln St.
Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us
/RA/
Molly L. Barkman Counsel for the NRC Staff