E-MAIL: (PD) Drywell
ML071020291
Person / Time
Site: Pilgrim
Issue date: 03/28/2007
From: Perry Buckberg
NRC/NRR/ADRO/DLR/RLRA
To: Meyer G
Engineering Region 1 Branch 1
References
TAC MD3698
Download: ML071020291 (3)


Text

Page 1 of 1 Perry Buckberg - Drywell From: Perry Buckberg To: Glenn Meyer Date: 3/28/2007 1:51 PM

Subject:

Drywell Glenn, Related Amendments and my summary (of tangible actions) are attached.

Perry file:/C:\temp\GW }00001.HTM 3/30/2007

1Fc--\temp\GWT-0-0004.TMP 155-ae Paae ill ill bc:\ternD\GWIOOOO4.TM P Mail Envelope Properties (460AAB28.4F1 : 9: 8248)

Subject:

Drywell Creation Date 3/28/2007 1:51:36 PM From: Perry Buckberg Created By: PHBB@nrc.gov Recipients Actio n Date & Time nrc.gov kp lpo.KPDO Deliv ered 3/28/2007 1:52:21 PM GWM (Glenn Meyer)

Post Office Deli iered Route kplpo.KPDO 3/28/ 2007 1:52:21 PM nrc.gov Files Size Dat e & Time MESSAGE 517 3/28 /2007 1:51:33 PM TEXT.htm 372 Pilgrim LRA Amendment 13 1_292007.pdf 165(0280 1/30/2( )07 6:45:18 AM Pilgrim LRA Amendment 10 12_122006.pdf 176:5419 12/13/s 2006 9:18:16 AM Pilgrim Drywell Actions RAI B.1.16.1.wpd 701'9 3/16/2( )07 3:17:36 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered

Pilgrim Drywell Actions Resulting from RAI B.1.16.1 Amendment 10 of 12/12/2006 discussed replacement of the failed flow switch (FS-4803) on 11/17/2006. Amendment 10 also discussed replacement being initiated for flow switches FS-4802 (alarming functions for vessel to drywell bellows rupture) and FS-4806 (alarming functions for fuel pool gate leakage) and establishment of a preventive maintenance task to replacement of these switches every 15 years.

Amendment 10 included commitment 41 for augmented inspection of the drywell shell adjacent to the sand cushion following indications of water leakage into the annulus air gap.

Amendment 13 of 1/29/2007 included commitment 44 to perform another set of the UT measurements just above and adjacent to the sand cushion region prior to the period of extended operation and once within the first 10 years of the period of extended operation.

41 Enhance the Containment Inservice A.2.1.17 and June 8, Letter Inspection (CII) Program to require B.1.16.1 2012 2.06.09 augmented inspection in accordance 4 with ASME Section XI IWE-1240, of the drywell shell adjacent to the sand cushion following indications of water leakage into the annulus air gap.

44 Perform another set of the UT A.2.1.17 and Prior to the Letter measurements just above and adjacent B. 1.16.1 period of 2.0.7.01 to the sand cushion region prior to the extended 0 period of extended operation and once operation within the first 10 years of the period of and once extended operation. within the first 10 years of the period of extended I operation