Pilgrim - Letter to Administrative Judges Updated Hearing File (Pilgrim Nuclear Power Station)
ML071090040
Person / Time
Site: Pilgrim
Issue date: 04/18/2007
From: Curatola A
NRC/OGC
To:
A L Curatola, OGC, 301-415-8554
References
50-293-LR, ASLBP 06-848-02, RAS 13524
Download: ML071090040 (24)


Text

April 18, 2007 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.

(Pilgrim Nuclear Power Station)

Docket No. 50-293-LR; ASLBP No. 06-848-02-LR

Dear Administrative Judges:

The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachments 2 and 3, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5), and is continuing to preserve and maintain all privileged documents during the pendency of this

R. Cole April 18, 2007 P. Abramson A. Young proceeding. Also attached are the Affidavit of Perry Buckberg, as required by 10 C.F.R.

§ 2.336(c), and the Declaration of Pao-Tsin Kuo, Acting Director of the Division of License Renewal, formally invoking the deliberative process privilege.

Sincerely,

/RA/

Andrea Curatola Counsel for the NRC Staff

Enclosures:

Hearing File Index Privilege Log - Deliberative Process Privilege Log - Proprietary Information Affidavit of Perry Buckberg Declaration of Pao-Tsin Kuo cc: Attached Service List

ATTACHMENT 1 PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 5 - April 18, 2007 Accession Number Document Date Title/Description:

05-01 ML070440477 1996 Water Sample from Torus Room Floor - Pilgrim.

05-02 ML070440479 CR - PNP - 2006 - 01914 - Pilgrim 05-03 ML070440430 Interview Schedule - Region 1 Inspection.

05-04 ML070440482 Main Stack Inspection Guideline (3.m.5 - z) - Pilgrim .

05-05 ML070440481 Main Stack Inspection Report - 05/08/2006 - Pilgrim.

05-06 ML070780367 9/24/1996 CR-PNP-1996-00396, High Mitrate Levels Exists in the TBCCW System.

05-07 ML070780372 11/27/1996 CR-PNP-1996-09593, Crack in Housing for MO-1001-34A.

05-08 ML070790326 11/27/1996 PR 96.9593, Housing Crack on MO-1001-34A.

05-09 ML070780411 2/23/1997 Condition Report CR-PNP-1997-09135, Two Cracks Found in Core Spray Weld SW8BN.

05-10 ML070780380 4/30/1997 Condition Report CR-PNP-1997-01787, RFO-11 Erosion-Corrosion Data Review of Inspection Point #15 Found Instances of Wall Thickness Increases of Up to 0.227" When Comparing Previous Outage Results.

05-11 ML070790331 5/1/1997 PR 97.1787, RFO-11 Erosion Corrosion Data Review of Inspection Point #15.

ML070790295 7/13/1998 PR 96.0396, High Nitrate Levels Exists in TBCCW System, High Nitrate 05-12 Concentrations Have Been Associated with Stress Corrosion Cracking of Carbon Steel Piping.

05-13 ML070780188 3/26/1999 Condition Report CR-PNP-1999-09102, Loose Anchor Bolt Extensions.

05-14 ML070780416 5/22/1999 CR-PNP-1990-09249, Torus Containment Shell One Area of Pitting Exceeding Acceptance Criteria of .066 Inches Base Depth.

Accession Number Document Date Title/Description:

05-15 ML070790540 5/25/1999 PR 99.9249, Torus Containing Shell Pitting, Closure Sheet.

05-16 ML070790530 5/31/1999 PR 99.1467, 2nd Pass FW-8 Revealed 4" Indication.

05-17 ML070790535 5/31/1999 PR 99.9102, 2" Dia. Torus Anchor Bolt Extensions at Torus Saddle Support Between Bays 12 and 13.

05-18 ML070780412 6/1/1999 CR-PNP-1990-01467, During Inspection of 2nd Pass FW-8 MT of Weld Revealed Indication 4" Long Crack- Like Linear.

05-19 ML070780418 6/12/2000 CR-PNP-2000-09228, P-161C Suction Piping 98 Deg. Elbow for C Continuous SSW Hypo Pump Cracked and Leaking into Burm Area.

05-20 ML070790547 7/18/2000 PR 00.9228, Maintenance Discovered P-161C Suction Piping 98 deg. Elbow for C Continuous SSW Hypo Pump Cracked and Leaking in Burm Area, Closure Sheet 05-21 ML070780529 4/21/2001 CR-PNP-2001-09403, Fire System has Broken Pipe Between 12-D-8, 12D-9 in AOG Building.

05-22 ML070790643 4/27/2001 PR 01.940, Large Leak Reported in the Vicinity of AOG Building. Fire System has Broken Pipe Between 12-D-8 and 12-D-9.

05-23 ML070780431 5/3/2001 CR-PNP-2001-02275, A SSW Discharge Piping 20 Foot Section of Rubber Lining Peeled off of Piping Exposing Bare Metal.

05-24 ML070790568 5/3/2001 PR 01.2275, During Visual Exam of A SSW Discharge Piping it was Discovered that a 20 Foot Section of Rubber Lining was Peeled Off of the Piping Exposing Bare Metal.

05-25 ML070780439 9/10/2001 CR-PNP-2001-04048, Received SBO DG Fuel Tank Leakage Alarm Alert Wet Probes.

05-26 ML070790583 9/17/2001 PR 01.4048, Received SDO DG Fuel Tank Leakage Alarm Alert Wet Probes 1.

05-27 ML070780453 9/20/2001 CR-PNP-2001-04171, Alarm C190-D3 SBO DG Fuel Tank Leakage in Alarm.

05-28 ML070790596 9/25/2001 PR 01.4171, Tour Operator Found Alarm C190-D3 on D# SBO DG Fuel Tank Leakage in Alarm. Panel Indicates Probe #1 Wet Alert Water Detected Alarm.

Accession Number Document Date Title/Description:

05-29 ML070780491 9/27/2001 CR-PNP-2001-04238, HCU 50-31 Leak.

05-30 ML070790603 10/10/2001 PR 01.4238, Tour Operator Reported that HCU 50-31 Leak Appears Worse -

Closure.

05-31 ML070780508 11/8/2001 CR-PNP-2001-04779, T- 112 Cation Regen Tank Found Second Leak.

05-32 ML070790611 11/8/2001 PR 01.4779, During Field Walkdown of MR 19600625 for Tank Repair on T-112 Cation Regan Tank Found a Second Leak Suspected Area of Damage on Tank Wall.

05-33 ML070780545 2/27/2002 CR-PNP-2002-09283, Unable to Reassemble E-122B, B TBCCW Heat Exchanger Head.

05-34 ML070780564 6/19/2002 CR-PNP-2002-10639, Received Blackout Diesel Generator Alarm (C3L-A4)

Several Times During Shift on 06/19/2005.

05-35 ML070780603 12/13/2002 CR-PNP-2002-12941, P-208D (D Salt Service Water Pump) Shaft Had Pitting.

05-36 ML070780615 4/17/2003 CR-PNP-2002-01411, Secondary Containment Leakrate Testing Was Aborted.

05-37 ML070780632 4/19/2003 CR-PNP-2002-01414, The Concrete Shield Block for the Drywell Equipment Hatch was Removed Prior to the Reactor Being Less than 212F.

05-38 ML070780624 4/19/2003 CR-PNP-2003-01413, Secondary Containment Leakrate Testing was Aborted.

05-39 ML070780653 4/22/2003 CR-PNP-2003-01471, Primary Containment Isolation Valve (PCIV) 262-F-013A Experienced Increased but Acceptable Local Leak Rate Test Results.

05-40 ML070790110 4/25/2003 CR-PNP-2003-01582, Primary Containment Isolation Valve (PCIV) 6-CK-62B Failed to Meet its Individual Valve Local Leak Rate Test (LLRT) Acceptance Criteria.

05-41 ML070790228 7/8/2003 RF014 ISI Summary Report for NRC Submittal with Attachment.

05-42 ML070790183 8/12/2003 CR-PNP-2003-02976, Pilgrim Construction Activity and Damage to Underground Utilities.

Accession Number Document Date Title/Description:

05-43 ML070790213 3/8/2004 ENN Engineering Standard, Rev. 0, IWE General Visual Containment Inspection.

05-44 ML070790161 5/16/2005 CR-PNP-2005-02621, Rollup CR with Various Problems Inservice Inspection Related.

05-45 ML070790647 11/1/2005 Procedure No. 2.1.8.7. Rev. 4, ASME Code Visual Examination of Primary Containment (RTYPE H6.02).

05-46 ML070790208 2/2/2006 ENN-NDE-10.03, 02/02/06, VT-3 Examination.

05-47 ML070780197 3/8/2006 CR-PNP-----------, CR Just Entered, Operability of Refuel Bellows Seal Rupture Drain Leakage Alarm Switch.

05-48 ML070790174 7/26/2006 CR-PNP-2006-02799, Fair Amount of Water in Torus Room Floor.

05-49 ML070660279 8/22/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/22/06 re: Pilgrim AMP Review.

05-50 ML070670089 8/24/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/24/06 re: Pilgrim AMP Review.

05-51 ML070660548 8/28/2006 PD_Email from Fred Mogolesko, Entergy, dtd 08/28/06 re: Preparation for Region I Inspection at Pilgrim.

05-52 ML070660056 8/28/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/28/06 re: Preparation for Region I Inspection at Pilgrim.

05-53 ML070790156 9/19/2006 CR-PNP-2006-03467, Evidence of Past (Non-Active) Leakage Found on Torus Room Bay 1 Wall.

05-54 ML070790143 9/19/2006 CR-PNP-2006-03468, A & B Aux Bay to Torus Loop Seal Piping (Secondary Containment Boundary Found with Heavy Corrosion).

05-55 ML070790136 9/19/2006 CR-PNP-2006-03469, B Core Spray Suction Pipe Support H-14-1-8 in Torus Room Found to be Corroded.

05-56 ML070790130 9/20/2006 CR-PNP-2006-03479, Torus Anchor Bolt Baseplate Assemblies in Bays 9, 10, & 15 Found to be Corroded.

Accession Number Document Date Title/Description:

05-57 ML070780135 9/21/2006 CR-PNP-2006-03497, During the NRCs Walkdown of the Torus Compartment as Part of License Renewal Review, the Inspectors Noted the Presence of Combustible Material...

05-58 ML070780175 9/21/2006 CR-PNP-2006-03499, During Walkdown of the Plant Fire Protection Noted that Serveral Hoses were Stored or Routed through the Combustible Free Zone on 23' of the Reactor Auxiliary Building.

05-59 ML070790115 10/4/2006 CR-PNP-2006-03677, Controls to Prevent and Monitor for Corrosion of the Drywell Shell Need to be Assessed and Strengthened.

05-60 ML070790188 10/5/2006 Listing of all Items NRC Region I Inspection of PNPS Various Pages Dated October 4 and 5, 2006 with Separate Pages for LR# 569 and LR# 536.

05-61 ML070790120 10/6/2006 CR-PNP-2006-03702, An Issue was Raised During the Region I Inspection for License Renewal Regarding the Expected Service Life of a Protective Coating for Buried Piping.

05-62 ML070670035 10/12/2006 PD_Email from Timothy OHara dtd 10/12/06 re: An Update.

05-63 ML070430476 1/30/2007 Pilgrim License Renewal Inspection Exit Meeting - Slides with Notes.

05-64 ML070670370 2/15/2007 Pre-Inspection Cover Sheet and Inspection Plan - Pilgrim Nuclear Generating Station; 05000293/2006007.

05-65 ML070540205 3/1/2007 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental Environmental Impact Statement Regarding Pilgrim License Renewal Review.

05-66 ML070600798 3/1/2007 2007/03/01-Safety Evaluation Report With Open Items Related to the License Renewal of Pilgrim Nuclear Power Station.

05-67 ML070510236 3/1/2007 2007/03/01-Transmittal Ltr - Safety Evaluation Report With Open Items Related To The License Renewal Of Pilgrim Nuclear Power Station.

05-68 ML070750127 3/1/2007 E-MAIL: Requested Document, Safety Evaluation Report With Open Items Related to the License Renewal of Pilgrim Nuclear Power Station.

Accession Number Document Date Title/Description:

05-69 ML070650360 3/2/2007 2007/03/02-Comment (20) submitted by C-10 Research and Education Foundation, Sandra Gavutis on Massachusetts Attorney Generals PRM-51-10 re to Amend 10 CFR Part 51.

05-70 ML070650363 3/2/2007 2007/03/02-Comment (21) submitted by Janice Nickerson on Massachusetts PRM-51-10 re to Amend 10 CFR Part 51.

05-71 ML070650365 3/2/2007 2007/03/02-Comment (22) submitted by Barbara Hildt on Massachusetts Attorney Generals PRM-51-10 re to Amend 10 CFR Part 51.

05-72 ML071020479 3/2/2007 E-MAIL: Distribution of Final Document: Summary of Public Meetings Draft SEIS Pilgrim.

05-73 ML071030021 3/2/2007 E-MAIL: (PA) Pilgrim Nuclear Power Station DEIS Comments.

05-74 ML070650368 3/4/2007 2007/03/04-Comment (23) submitted by Kevin W. Craig on Massachusetts Attorney Generals PRM-51-10 re to Amend 10 CFR Part 51.

05-75 ML071030191 3/5/2007 E-MAIL: (PD) Request hard copy-safety evaluation report From Mary Lampert To-phb1@nrc.gov 3/5/07 11:32am.

05-76 ML070640252 3/6/2007 ACRS Review of the Pilgrim Nuclear Plant Station Renewal Application - Safety Evaluation Report.

05-77 ML071030211 3/6/2007 E-MAIL: (PD) Week of 2/26 - Conference Calls From Perry Buckberg To Doug Ellis 3/6/07 9:18am.

05-78 ML070660632 3/7/2007 2007/03/07-Comment (30) Submitted by Marilyn Harquail on Massachusetts Attorney Generals PRM 51-10 re Amend 10 CFR Part 51.

05-79 ML071030221 3/7/2007 E-MAIL: (PD) Updated - Week of 2/26 conference call record From Perry Buckberg To Doug Ellis 3/7/07 6:36am.

05-80 ML071020508 3/8/2007 E-MAIL: (PA) 1266 DC Mass AG comments on Draft EIS 2-28-07.pdf.

05-81 ML071020490 3/8/2007 E-MAIL: (PA) Re: 1266 DC Mass AG comments on Draft EIS 2-28-07.pdf.

Accession Number Document Date Title/Description:

05-82 ML070710562 3/9/2007 2007/03/09-Comment (31) submitted by Richard C. DiPrima on Massachusetts Attorney Generals PRM-51-10, re Amend 10 CFR Part 51.

05-83 ML071020483 3/12/2007 E-mail: (PA) Re: PNPS License Renewal - Cooling Tower Question.

05-84 ML070730345 3/13/2007 2007/03/13-Comment (35) submitted by Edward and Charlotte Russell Supporting Massachusetts Attorney Generals PRM-51-10 re Spent Fuel at the Pilgrim.

05-85 ML071030042 3/13/2007 E-MAIL: (PD) Copy of LRA Amendment 15 letter - From Edward Sanchez to phb1@nrc.gov 3/13/07 12:29pm.

05-86 ML070790316 3/13/2007 Pilgrim - License Renewal Application Amendment 15.

05-87 ML070750055 3/15/2007 IR 05000293-06-007; Entergy Nuclear Operations; 09/18/2006 - 12/07/2006; Pilgrim Nuclear Power Station; Inspection of the Scoping of Non-Safety Systems and the Proposed Aging Management Procedures for the Application for Renewed License.

05-88 ML070810442 3/15/2007 Request for Additional Information on Time-Limited Aging Analyses for The Reactor Vessel and Internals, Pilgrim Nuclear Power Station, License Renewal Application (TAC No. MC9669).

05-89 ML070600567 3/15/2007 Summary of the License Renewal Telephone Conference Call and Meeting Held Between The U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force.

05-90 ML070790637 3/19/2007 2007/03/19-Comment (50) submitted by Sally Shaw on Massachusetts Attorney Generals PRM-51-10 re Amend 10 CFR Part 51 - Spent Fuel.

05-91 ML070790668 3/19/2007 2007/03/19-Comment (57) submitted by Judy and Howard Hall on Massachusetts Attorney Generals PRM-51-10 re Amend of 10 CFR Part 51 - Spent Fuel.

05-92 ML070810384 3/19/2007 2007/03/19-Comment (64) submitted by Paul A. Gaukler on behalf of Entergy Corp.

On Massachusetts Attorney Generals PRM-51-10 re Amend 10 CFR Part 51 -

Spent Fuel.

Accession Number Document Date Title/Description:

05-93 ML071030048 3/19/2007 E-mail: (PD) Meeting Summary - March 14 & 15 2007 - From Perry Buckberg To Doug Ellis 3/19/07 7:05am.

05-94 ML070800125 3/20/2007 2007/03/20-Comment (61) submitted by Wedge Bramhall on Massachusetts Attorney Generals PRM-51-10 re Amend 10 CFR Part 51 - Spent Fuel.

05-95 ML071030058 3/20/2007 E-MAIL: (PD) Re: Pilgrim LR ACRS Subcommittee (SC) Meeting on 4/4/07 - From Mairtri Banerjee To Lambros Lois; Perry Buckberg 3/20/07 1:20pm.

05-96 ML071020505 3/21/2007 E-MAIL: (PA) EPA Suspends 316(b) Rule.

05-97 ML071030063 3/21/2007 E-MAIL: (PD) Fwd: Meeting Summary - March 14 & 15 2007 - From Perry Buckberg TO Doug Ellis 3/21/07 1:04pm 05-98 ML071030069 3/22/2007 E-MAIL: (PD) Dry Well - Event Number: 43245 - From Mary Lampert to Perry Buckberg 3/22/07 9:08am.

05-99 ML070780058 3/26/2007 Request For Additional Information For The Review of The Pilgrim Nuclear Power Station License Renewal Application.05-100 ML071030176 3/27/2007 E-MAIL: (PD) Pilgrim Draft ACRS Presentation - from Bryan Ford to Perry Buckberg 3/27/07 5:25pm.05-101 ML071020296 3/28/2007 E-MAIL: (PD) Re: Draft Program Detail Pilgrim ACRS Subcommitte presentation.ppt.05-102 ML071020291 3/28/2007 E-MAIL: (PD) Re: Drywell.05-103 ML071020345 3/28/2007 E-MAIL: (PD) Re: Revised DRAFT ACRS Fluence Slides2.05-104 ML071020319 3/29/2007 E-MAIL: (PD) Re: Entergy-Preliminary Durability Performance Evaluation of Perry.05-105 ML071020316 3/29/2007 E-MAIL: (PD) Re: PDF copy of Entergy letter providing comments on draft SER on Pilgrim LRA.05-106 ML071020343 3/29/2007 E-MAIL: (PD) Re: Revised DRAFT ACRS Fluence Slides.

Accession Number Document Date Title/Description:

05-107 ML071020383 3/30/2007 E-MAIL: (PD) Re: Final Presentation to Advisory Committee on Reactor Safguards.05-108 ML071020367 3/30/2007 E-MAIL: (PD) Re: People Attending ACRS Sub Committee Meeting.05-109 ML070120424 3/30/2007 G20061071/LTR-06-0668 - Mary Lampert Ltr. Re: Pilgrim Nuclear Power not Selected for Inclusion in the Initial Study for the Art Reactor Consequences Analyses Project

ATTACHMENT 2: PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGE Supplement 5: April 18, 2007 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP ML070670041 Subbaratna PD_Email from Ram 08/18/2006 E-Mail Raymond W J, Discussion of input 3 01 m R, Subbaratnam dtd NRC/RGN- for inspection NRC/NRO/ 8/18/06 re: Cable I/DRP/PB5 report DNRL/NGIF Vaults with Submerged Cables.

DP ML070670067 Meyer G W, PD_Email from 09/15/2006 E-Mail Kaufman P D, Discussion of input 2 02 NRC/RGN- Glenn Meyer dtd NRC/RGN- for inspection I/DRS/EB1 9/15/06 re: I/DRS/PSB2 report Document Requests for Pilgrim License Renewal Inspection.

DP ML070660594 Meyer G W, PD_Email from 10/10/2006 E-Mail Conte R J, Discussion of input 2 03 NRC/RGN- Glenn Meyer dtd NRC/RGN- for inspection I/DRS/EB1 10/10/06 re: Agreed - I/DRS/EB1 report Alternative to Pilgrim LR debrief.

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP ML070670118 OHara T L, PD_Email from 10/12/2006 E-Mail Meyer G W, Discussion of input 2 04 NRC/RGN- Timothy OHara dtd NRC/RGN- for inspection I/DRS/PSB 10/12/06 re: Pilgrim I/DRS/EB1 report 2 Report Input?.

ML070670378 NRC/RGN- RAI B.1.16.1 10/12/2006 Request for Proposed RAI 1 DP I/DRS/EB1 (Proposed 10-12). Additional 05 Information (RAI)

DP ML070670394 NRC/RGN- RAI B.1.16.1 10/12/2006 Request for Proposed RAI 1 06 I/DRS/EB1 (revised). Additional Information (RAI)

DP ML070660027 Meyer G W, PD_Email from 10/16/2006 E-Mail Conte R J, Discussion and 2 07 NRC/RGN- Glenn Meyer dtd OHara T L, comments I/DRS/EB1 10/16/06 re: Drywell NRC/RGN- regarding issue briefing. I/DRS/EB1, Inspection NRC/RGN-I/DRS/PSB2 DP ML070670245 Meyer G W, Pilgrim Drywell Issue 10/16/2006 Technical Comments and 2 08 NRC/RGN- - 10/16/06. Paper discussion I/DRS/EB1 regarding inspection

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP ML070670102 Meyer G W, PD_Email from 11/08/2006 E-Mail Blough A R, Comments and 3 09 NRC/RGN- Glenn Meyer dtd Conte R J, discussion I/DRS/EB1 11/8/06 re: Pilgrim Hiland P L, regarding drywell - onsite Lund A L, inspection followup of UT data. OHara T L, NRC/NRR/ADE S/DE, NRC/NRR/ADR O/DLR, NRC/RGN-I/DRP, NRC/RGN-I/DRS/EB1, NRC/RGN-I/DRS/PSB2 DP ML070660248 Meyer G W, PD_Email from 11/28/2006 E-Mail Buckberg P H, 3 10 NRC/RGN- Glenn Meyer dtd Lund A L, Comments I/DRS/EB1 11/28/06 re: Input to NRC/NRR/ADR and discussion Entergy Drop-in; LR O/DLR regarding Inspection Status. inspection DP ML070670251 No Known Pilgrim Drywell Issue 02/15/2007 No Comments and 2 11 Affiliation - 10/17/06. Document discussion Type Applies regarding inspection DP ML070670360 Meyer G W, Pilgrim LR Inspection 02/15/2007 Meeting Discussion 2 12 NRC/RGN- Briefing - Oct. 4 AM. Summary regarding I/DRS/EB1 inspection

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP ML070670257 No Known Pilgrim License 02/28/2007 - No Draft SER input 4 13 Affiliation Renewal Input - Document Kaufman. Type Applies DP ML071030195 Buckberg P E-MAIL: (PD) Fwd: 03/01/2007 E-Mail Jones J, Legin Draft SER input 11 14 H, St.Pierre Recommendation for Group, Inc A, concurrence From NRC/NRR/ Perry Buckberg To ADRO jenjones@legin.com 3/1/07 12:02pm.

DP ML071030095 Jones J, E-MAIL: (PD) 03/01/2007 E-Mail Buckberg P H, Draft SER input 11 15 Legin Requested Rodriguez V M, Group, Inc Document - From NRC/NRR/ADR Jennifer Jones to O/DLR Veronica Rodriguez 3/1/07.

DP ML070780598 Rodriguez E-MAIL: (PD) SER 03/01/2007 E-Mail Crespo M, Draft SER input 11 16 V M, Section 1. Huang J, Jones NRC/NRR/ J, Legin Group, ADRO/DLR Inc DP ML070780620 Rodriguez E-MAIL: (PD) SER 03/01/2007 E-Mail Crespo M, Draft SER input 77 17 V M, Section 3.3. Huang J, Jones NRC/NRR/ J, Legin Group, ADRO/DLR/ Inc RLRB DP ML070780511 Rodriguez E-MAIL: (PD) SER 03/01/2007 E-Mail, Crespo M, Draft SER input 60 18 V M, Section 3.5. Safety Huang J, Jones NRC/NRR/ Evaluation J, Legin Group, ADRO/DLR Report Inc

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP ML070780563 Rodriguez E-MAIL: (PD) SER 03/01/2007 E-Mail, Crespo M, Draft SER input 21 19 V M, Section 3.6 and 3.7. Safety Dresser R, NRC/NRR/ Evaluation Huang J, Jones ADRO/DLR Report, Draft J, Legin Group, Inc DP ML070780154 Rodriguez E-MAIL: (PD) SER. 03/01/2007 E-Mail, Jones J, Legin Draft SER input 6 20 V M, Safety Group, Inc NRC/NRR Evaluation Report DP ML071030262 Palla R L, E-MAIL: (PD) 03/01/2007 E-Mail Jones J, Discussion and 4 21 NRC/NRR Thoughts on Sandia National recommendations MACCS2 Review Labs (SNL) regarding review Areas and Calculations.

DP ML071030265 Bixler N E, E-MAIL: (PD) Re: 03/06/2007 E-Mail Palla R L, Discussion and 2 22 Sandia Info in ER etc To Be NRC/NRR recommendations National Aware of. regarding review Labs (SNL)

DP ML071030121 Palla R L, E-MAIL: (PD) Re: 03/08/2007 E-Mail Moody R E, Discussion and 7 23 NRC/NRR/ Pilgrim. NRC/NSIR recommendations ADRA/DRA regarding review DP ML070670346 Meyer G W, Pilgrim LR Inspection 03/08/2007 - No Discussion 1 24 NRC/RGN- Results - Oct. 5PM. Document regarding I/DRS/EB1 Type Applies inspection

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP ML070780099 Conte R J, R. Conte Comment 03/08/2007 Inspection Comment on Draft 31 25 NRC/RGN- on Draft IR Report, Inspection Report I/DRS/EB1 05000293-06-007; Letter, Note Entergy Nuclear Operations, Inc.;

09/18-22/2006 10/02-06/2006 and 12/06-07-2006; Pilgrim Nuclear Power Station.

DP ML071030229 Buckberg P E-MAIL: (PD) Fwd: 03/09/2007 E-Mail Stubbs A, Discussion of 4 26 H, Re: Fwd: Delivery of NRC/NRR/ADE Inspection NRC/NRR/ Subtask 2, S/DSS/SBPB ADRO/DLR Recommended Inspection Items for Regional Inspection, for Contract #NRC-From Perry Buckberg To AXS8@nrc.gov 3/9/07 11:45am.

DP ML071030057 Buckberg P E-MAIL: (PD) Fwd: 03/19/2007 E-Mail Davis J, Hoang Discussion of 3 27 H, Re: Pilgrim LR ACRS D, NRC meeting input NRC/NRR/ Subcommittee (SC)

ADRO/DLR Meeting on 4/4/07 -

From Perry Buckberg To Dan Hoang; James Davis.

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP ML071030131 Jones J A, E-MAIL: (PD) Draft 03/21/2007 E-Mail Palla R L, Discussion and 6 28 Sandia Itemized Matrix. NRC/NRR/ADR recommendations National A/DRA regarding review Labs (SNL)

DP ML071030144 Palla R L, E-MAIL: (PD) 03/26/2007 E-Mail Mitchell J A, Discussion 6 29 NRC/NRR/ Telecon with SNL Moody R E, regarding review ADES Re: Pilgrim Hearing Rikhoff J J, Support - Tuesday NRC/NRR, 11/25. NRC/NSIR, NRC/RES DP ML071030154 Palla R L, E-MAIL: (PD) Bio for 03/27/2007 E-Mail Bixler N, Discussion and 2 30 NRC/NRR Lyons. Sandia National recommendations Labs (SNL) regarding review DP ML071030317 Hurley B, E-MAIL: (PD) 03/30/2007 E-Mail Williamson A R, Discussion 14 31 Earthtech, Binning. NRC/NRR/ADR regarding Inc O/DLR/REBB preparation of EIS DP ML071030298 Williamson E-MAIL: (PD) 03/30/2007 E-Mail Hurley B, Earth Discussion 3 32 A R, Response.... Take Tech, Inc regarding NRC/NRR/ one! preparation of EIS ADRO/DLR/

REBA

ATTACHMENT 3: PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - PROPRIETARY INFORMATION Supplement 5: April 18, 2007 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain trade secrets, privileged or confidential commercial or financial information subject to withholding from public disclosure pursuant to 10 C.F.R. § 2.390. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, designated proprietary, and subject to protected status under Section 2.390.

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation ML070870141 General GE-NE-0000-0061- 3/14/2007 Report, Proprietary 42 Electric Co 6306-R4-P, Pilgrim Technical Information PPI- Nuclear Power 05-01 Station, Shroud Repair Replacement Upper Support Assembly-Stress Analysis Report.

ML070870139 General GE-NE-000-0064- 3/21/2007 Report, Proprietary 11 Electric Co 9392-R2-P, Pilgrim Technical Information Unit 1, IGSCC PPI- Assessment of 05-02 Shroud Repair X-750 Component Other Than The Replacement Upper Support Assembly and Tie Rod Nut.

April 18, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION ) Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)

I, Perry Buckberg, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Original Signed by/

Perry Buckberg Executed in Rockville, MD this 18th day of April, 2007

April 18, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION ) Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

DECLARATION OF PAO-TSIN KUO I, Pao-Tsin Kuo, do hereby state as follows:

1. I am employed as the Director of the Division of Licensing Renewal (DLR) in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Pilgrim Nuclear Power Station license renewal application.
2. As part of their responsibilities in preparing the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staffs deliberative process. Those documents are listed in Attachment 2 to the April 18, 2007, submission of the Staffs Hearing File.
3. I have personally reviewed the documents identified as privileged in Attachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staffs review of the license renewal application. All documents contain either the Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative process necessary

to the Staffs review of the pending license renewal application.

4. Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
5. Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the April 18, 2007 submission of the Hearing File Supplement 5.
6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Original Signed By/

Pao-Tsin Kuo Executed in Rockville, MD this 18th day of April, 2007

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-293-LR

)

(Pilgrim Nuclear Power Station) ) ASLBP No. 06-848-02-LR

)

CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and mandatory disclosures, privilege log, accompanying declaration, and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 18th day of April 2007.

Administrative Judge* Administrative Judge*

Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: rfc1@nrc.gov E-mail: pba@nrc.gov Administrative Judge* Office of Commission Appellate

  • Ann Marshall Young, Chair Adjudication Atomic Safety and Licensing Board Panel Mail Stop: O-16C1 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: OCAAMail@nrc.gov E-mail: amy@nrc.gov Office of the Secretary*

Sheila Slocum Hollis** Attn: Rulemaking and Adjudications Staff Duane Morris LLP Mail Stop: O-16C1 1667 K Street, NW, Suite 700 U.S. Nuclear Regulatory Commission Washington, DC 20006 Washington, DC 20555-0001 E-mail: sshollis@duanemorris.com E-mail: hearingdocket@nrc.gov

Atomic Safety and Licensing Board* Terence A. Burke, Esq.**

Mail Stop: T-3 F23 Entergy Nuclear U.S. Nuclear Regulatory Commission 1340 Echelon Parkway Washington, DC 20555-0001 Mail Stop: M-ECH-62 Jackson, MS 39213 Molly H. Bartlett, Esq.**

52 Crooked Lane David R. Lewis, Esq.**

Duxbury, MA 02332 Paul A. Gaukler, Esq.

E-mail: mollyhbartlett@hotmail.com Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Chief Kevin M. Nord** Washington, DC 20037-1137 Fire Chief & Director Duxbury Emergency E-mail: david.lewis@pillsburylaw.com Management Agency paul.gaukler@pillsburylaw.com 668 Tremont Street Duxbury, MA 02332 Town Manager**

E-mail: nord@town.duxbury.ma.us Town of Plymouth Fax: 781-934-6530 11 Lincoln St.

Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us

/RA/

Andrea Curatola Counsel for the NRC Staff