ML071700042
ML071700042 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 06/18/2007 |
From: | Uttal S NRC/OGC |
To: | |
S L Uttal, NRC/OGC, 301-415-1582 | |
Shared Package | |
ML071700056 | List: |
References | |
50-293-LR, ASLBP 06-848-02-LR, RAS 13790 | |
Download: ML071700042 (10) | |
Text
ATTACHMENT 1: PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES Supplement 7: June 18, 2007 HF# Accession Number Document Date Title/Description:
HF-1 ML071560251 04/27/2003 CR-PNP-2003-01618 with Supporting Report (with Redacted Notes) 1st Page for Inspector.
HF-2 ML071570049 01/16/2007 01/16/2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer.
HF-3 ML071640328 05/01/2007 E-MAIL: (NPA-PD) Entergy LRA Letter Part 1 of 2.
HF-4 ML071640339 05/01/2007 E-MAIL: (NPA-PD) LRA Letter Part 2.
HF-5 ML071640342 05/01/2007 E-MAIL: (NPA-PD) Pilgrim Amendment.
HF-6 ML071280251 05/01/2007 Pilgrim Nuclear Power Station - License Renewal Application Amendment 16.
HF-7 ML071570052 05/02/2007 E-MAIL (NPA-PD) Re: MACCS2 Input files for Sensitive Cases.
HF-8 ML071560466 05/02/2007 E-MAIL: (NPA-PD) Fwd: Pilgrim Waste Discussion.
HF-9 ML071560479 05/03/2007 E-MAIL: (NPA-PD) Entergy Efficiency Article.
HF- ML071560469 05/03/2007 E-MAIL: (NPA-PD) Re: Fwd: Pilgrim Waste Discussion.
10 HF- ML071570059 05/04/2007 E-MAIL (NPA-PD) FW: MACCS2 Input Files for Sensitive 11 Cases in ER.
HF- ML071570037 05/04/2007 E-mail: (NPA-PD) FW: MACCS2 Input Files for Sensitivity 12 Cases in ER.
HF- ML071570036 05/04/2007 E-MAIL: (NPA-PD) Re: MACCS2 Input Files for 13 Sensitivity Cases.
HF# Accession Number Document Date Title/Description:
HF- ML071640324 05/07/2007 E-MAIL: (NPA-PD) Re: Fw: Pilgrim Fluence RAIs.
14 HF- ML071580958 05/08/2007 E-MAIL: (NPA-PD) Amendment 16 reply.
15 HF- ML071570063 05/09/2007 E-MAIL (NPA-PD) FW: Letter to MA State Historic 16 Preservation Officer.
HF- ML071580985 05/10/2007 E-MAIL: (NPA-PD) 5/10 Phone Conference.
17 HF- ML071580988 05/10/2007 E-MAIL: (NPA-PD) LRA question.
18 HF- ML071580981 05/10/2007 E-MAIL: (NPA-PD) RE: 5/10 Phone Conference.
19 HF- ML071580965 05/14/2007 E-MAIL: (NPA-PD) RE: Revised Phone Conference 20 Letter (5/10).
HF- ML071580962 05/14/2007 E-MAIL: (NPA-PD) Revised Phone Conference Letter 21 (5/10).
HF- ML071640345 05/17/2007 E-MAIL: (NPA-PD) LRA Amendment 17.
22 HF- ML071550310 05/17/2007 Pilgrim, License Renewal Application Amendment 17.
23 HF- ML071640347 05/18/2007 E-MAIL: (NPA-PD) Pilgrim Amendment 17 of 5/17/2007.
24 HF- ML071570122 05/24/2007 E-MAIL: (NPA-PD) RE: Cost Benefit Equation Terms 25 [Response from N. Bixler, Sandia].
HF- ML071570124 05/24/2007 E-MAIL: (NPA-PD) RE: Cost Benefit Equation Terms.
26
HF# Accession Number Document Date Title/Description:
HF- ML071580976 05/31/2007 E-MAIL: (NPA-PD) Amendment 16.
27 HF- ML071560232 06/04/2007 Redacted Page (1) from: Follow Up to CR-PNP-2005-28 05471 - Outstanding Questions (License Document).
ATTACHMENT 2: PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGE Supplement 7: June 18, 2007 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R. ' 2.336(b)(5),
the Staff is providing this log to identify the following documents, withheld under the Adeliberative process@ privilege.
PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation PD-1 ML0716301 NRC Safety Evaluation Draft SER 95 Report: With Open Items Related to the License Renewal of Pilgrim Nuclear Power Station (Revision).
PD-2 ML0715601 S.G. Pinney Unredacted Page 5 05/06/1996 No Report NRC Inspectors 1 89 & Associates of 6 from Coating Document notes -
DBA Qualification Type Applies predecisional Procedure and Data from S.G. Pinney &
Associates, Inc.
(Proprietary)
(Inspector Notes).
PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation PD-3 ML0715601 S.G. Pinney Unredacted Page 18 05/25/1999 Report, NRC Inspectors 2 42 & Associates and Page 1 of 2 (of Miscellaneou notes -
PR 99.1345 s predecisional Response) from SUDDSRF# 99-292 Torus Immersion Area Inspection Report.
PD-4 ML0715602 Entergy Corp Unredacted Page 04/27/2003 Report NRC Inspectors 1 14 120 from: CR-PNP- notes -
2003-01618 with predecisional Supporting Report (Inspector Notes).
PD-5 ML0715604 Muir J M, E-MAIL: (NPA-PD) 05/01/2007 E-Mail Williamson A R, Draft questions 9 26 NRC/NRR/AD Nonrad Waste. NRC/NRR/ADR RO/DLR/REB O/DLR/REBA B
PD-6 ML0715700 Jones J A, E-mail: (NPA-PD) 05/02/2007 E-Mail Palla R L, Discussion of plans 6 68 Sandia Task 2 Activities. NRC/NRR for possible input National Labs for SAMA analysis (SNL) and contention response PD-7 ML0715700 Palla R L, E-MAIL: (NPA-PD) 05/03/2007 E-Mail Greene N A, Discussion of plans 6 70 NRC/NRR/AD Task 2 Activities for Mitchell J A, for possible input ES Pilgrim. Moody R E, for SAMA analysis Rikhoff J J, and contention NRC response
PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation PD-8 ML0715700 Rikhoff J J, E-mail: (NPA-PD) 05/04/2007 E-Mail Palla R L, Comments on 4 74 NRC/NRR/AD Re: Task 2 Activities NRC/NRR plans for possible RO/DLR/REB [from J. Rikhoff]. input for SAMA A analysis and contention responses PD-9 ML0715700 Palla R L, E-MAIL: (NPA-PD) 05/07/2007 E-Mail Rikhoff J J, Comments on 4 41 NRC/NRR/AD Re: Task 2 Activities. NRC/NRR/ADR plans for possible RA/DRA O/DLR/REBA input for SAMA analysis and contention responses PD- ML0715700 Greene N A, E-MAIL: (NPA-PD) 05/10/2007 E-Mail Lawrence Request for 3 10 47 NRC/NRR/AD Follow Up Re: Livermore information -
RA/DRA/AAD Knowledge/Experien National Lab intergovernmental B ce with for (LLNL)
ADAPT/LODI Modeling and Request for Data for Pilgrim.
PD- ML0715809 Buckberg P E-MAIL: (NPA-PD) 05/10/2007 E-Mail Medoff J, Discussion of input 3 11 91 H, Re: ACTION: NRC/NRR/ADR for SER NRC/NRR/AD Generic Fracture O/DLR RO/DLR Toughness Issues with the Pilgrim, VY, and FitzPatrick LRAs.
PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation PD- ML0715604 Rikhoff J J, E-MAIL: (NPA-PD) 05/10/2007 E-Mail Palla R L, Predecisional 2 12 91 NRC/NRR/AD Re: Entergy NRC/NRR/ADR comments on RO/DLR/REB Response on Pilgrim A/DRA/APLA Licensee B SAMA Contentions submission (Dated 5/10/07).
PD- ML0715604 Rikhoff J J, E-MAIL: (NPA-PD) 05/14/2007 E-Mail Palla R L, Predecisional 2 13 99 NRC/NRR/AD Re: Entergy NRC/NRR/ADR comments on RO/DLR/REB Response on Pilgrim A/DRA/APLA Licensee A SAMA Contentions. submission PD- ML0715605 Williamson A E-MAIL: (NPA-PD) 05/22/2007 E-Mail Hurley B, - No Draft input to SER 3 14 09 R, Chapter 4. Known NRC/NRR/AD Affiliation RO/DLR PD- ML0715605 Williamson A E-MAIL: (NPA-PD) 05/22/2007 E-Mail Muir J M, Discussion of SER 2 15 05 R, Re: Pilgrim. NRC/NRR/ADR input NRC/NRR/AD O/DLR/REBA RO/DLR/REB A
PD- ML0715809 Crespo M E, E-MAIL: (NPA-PD) 05/23/2007 E-Mail Buckberg P H, Draft input to SER 6 16 68 Legin Group, No subject from M. NRC/NRR/ADR Inc Crespox. O/DLR
PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation PD- ML0715702 Mitchell M A, Pilgrim Nuclear 05/25/2007 Final Safety Lund A L, Draft input for SER 32 17 41 NRC/NRR/AD Power Station Evaluation NRC/NRR/ADR ES/DCI/CVIB License Renewal Report O/DLR/RLRA Application-Final (FSER),
Safety Evaluation Memoranda Report Sections For Time-Limited Aging Analyses (TAC MD9669).
PD- ML0715809 Buckberg P E-MAIL: (NPA-PD) 05/29/2007 E-Mail Crespo M E, Draft input for SER 32 18 72 H, Section 4. Entergy NRC/NRR/AD Nuclear RO/DLR Operations, Inc PD- ML0715809 Crespo M E, E-MAIL: (NPA-PD) 05/31/2007 E-Mail Buckberg P H, Draft input for SER 30 19 94 Legin Group, No Subject from M. NRC/NRR/ADR Inc Crespo [Tech Edited O/DLR version of Section 4].
PD- ML0715601 No Known Unredacted: Follow 06/04/2007 No Inspectors notes- 1 20 32 Affiliation Up to CR-PNP-2005- Document predecisional 05471- Outstanding Type Applies Questions (with predecisional inspector notes).
ATTACHMENT 3: PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PROPRIETARY/COPYWRITTEN MATERIAL Supplement 7: June 18, 2007 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as proprietary or copywritten information. Pursuant to 10 C.F.R.
' 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld as proprietary or copywritten.
PC Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation PC-1 ML0715601 S.G. Pinney Unredacted Page 5 05/06/1996 No Applicants 1 89 & Associates of 6 from Coating Document Contractors report DBA Qualification Type Applies Procedure and Data from S.G. Pinney &
Associates, Inc.
(Proprietary)
(Inspector Notes).
PC-2 ML0715601 S.G. Pinney Final Report, Design 05/06/1996 Report, Applicants 38 65 & Associates Basis Accident & Technical Contractors report Irradiation Testing of Coating Repair Materials for Use in Boiling Water Reactor Suppression Chamber Immersion Areas, S.G. Pinney
& Associates, Inc.
(Proprietary) (with Page 5 of 6 Redacted due to Inspector Notes).
PC Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation PC-3 ML0715602 S.G. Pinney SUDDSRF# 99-292 05/25/1999 Inspection Applicants 40 41 & Associates Torus Immersion Report, Contractors report Area Inspection Report, Report (Redacted Technical DVR to Inspector Notes) (Page 18 and Page 1 of 2 PR99.1345 Response).