March 8, 2007 Mr. Vincent Fallacaro Manager, Training and Development Chiltonville Training Center 46 Sandwich Road Plymouth, MA 02360
Dear Mr. Fallacaro:
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on February 23, 2007, and the walkthrough (overall) and/or simulator operating tests administered February 26-March 1, 2007 at Pilgrim Nuclear Power Station. This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021. Five individuals were administered the examination and five passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No. 50-293 License No. DPR-35
V. Fallacaro
Enclosures:
- 1. ES-501-2, Power Plant Licensing Examination Results Summary
- 2. ES-303-1 and 303-2, Individual Examination Results
- 3. Licenses cc w/licenses:
Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
Mr. Vincent Fallacaro Manager, Training and Development Chiltonville Training Center 46 Sandwich Road Plymouth, MA 02360
Dear Mr. Fallacaro:
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on February 23, 2007, and the walkthrough (overall) and/or simulator operating tests administered February 26-March 1, 2007 at Pilgrim Nuclear Power Station. This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021. Five individuals were administered the examination and five passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants.
Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT)
Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No. 50-293 License No. DPR-35 SUNSI Review Complete: MDS (Reviewers Initials)
ADAMS NO:ML071020003 ADAMS PACKAGE NO: ML060800104 DOCUMENT NAME:
C:\\FileNet\\ML071020003.wpd After declaring this document An Official Agency Record it will without enclosures be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB GJohnson/GAJ MDSykes/MDS DATE 03/08/07 03/08/07 03/08/07 OFFICIAL RECORD COPY