ML072530023

From kanterella
Jump to navigation Jump to search
Renewal Hearing - FW: Fluence Plan
ML072530023
Person / Time
Site: Pilgrim
Issue date: 08/27/2007
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
06-848-02-LR
Download: ML072530023 (4)


Text

From: "Sanchez, Edward" <esanch1@entergy.com>

To: "Perry Buckberg" <PHB1@nrc.gov>

Date: 8/27/2007 3:03:39 PM

Subject:

FW: Fluence Plan

Perry, Attached is a flowchart that visually depicts the ties between the different elements (bullets) of the fluence action plan transmitted by letter dated August 23, 2007. The relationship between the bullets in the letter and the actions is also shown below.

Bullet Action 1 Transware RAMA Sensitivity and Power History Review 2 Swing Gate Sample 3 Millstone-1 Data 4 SWRI Dosimetry Review 5 As-Built From GE 6 RPV Measurement Capsule Pull RFO 17 at Pilgrim 7 Alternate Model With GE Ed Sanchez Pilgrim Licensing

Hearing Identifier: PilgrimRenewalNonPublic Email Number: 21 Mail Envelope Properties (46E50485.HQGWDO01.TWGWPO03.200.2000000.1.1407E6.1)

Subject:

FW: Fluence Plan Creation Date: 8/27/2007 3:03:39 PM From: "Sanchez, Edward" <esanch1@entergy.com>

Created By: esanch1@entergy.com Recipients "Perry Buckberg" <PHB1@nrc.gov>

Post Office Route TWGWPO03.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 891 8/27/2007 3:03:39 PM TEXT.htm 8483 9/10/2007 8:47:00 AM ACRS Reactor Vessel Neutron Fluence-1.ppt 27136 9/10/2007 8:47:01 AM Mime.822 49971 9/10/2007 8:47:01 AM Options Priority: Standard Reply Requested: No Return Notification: None None Concealed

Subject:

No Security: Standard

Page 1 of 1

Perry, Attached is a flowchart that visually depicts the ties between the different elements (bullets) of the fluence action plan transmitted by letter dated August 23, 2007. The relationship between the bullets in the letter and the actions is also shown below.

Bullet Action 1 Transware RAMA Sensitivity and Power History Review 2 Swing Gate Sample 3 Millstone-1 Data 4 SWRI Dosimetry Review 5 As-Built From GE 6 RPV Measurement Capsule Pull RFO 17 at Pilgrim 7 Alternate Model With GE Ed Sanchez Pilgrim Licensing file://c:\EMailCapture\PilgrimRenewalNonPublic\21\attch1.htm 9/10/2007

Reactor Vessel Neutron Fluence Action Plan Transware As-Built Millstone-1 Power SWRI RAMA From Data for History Dosimetry Sensitivity GE RFO 9/13 Review Review Transware No Adjusts Sample to Another OK RAMA Lab  ?

No Yes C/M Bias

? Yes Done RPV Measurement Swing Alternate Capsule Pull RFO17 Gate At Pilgrim Model Sample With GE