UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 7, 2007 Mr. Kevin Bronson RI-2006-A-0128 Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
Subject:
NRC Office Of Investigations Case No. 1-2007-011
Dear Mr. Bronson:
On November 27, 2006, the Region I Field Office, NRC Office of Investigations (OI), initiated an investigation to determine if a project manager with Entergy's Corporate Security Organization was discriminated against for having engaged in prior protected activity. Specifically, the alleged discrimination involved receiving less than average merit system raises after engaging in a protected activity at Pilgrim in 2002.
Based on the evidence developed during the investigation, OI was unable to substantiate that the project manager was discriminated against at Pilgrim for having engaged in protected activity in 2002. OI noted clear evidence that the project manager engaged in a protected activity in 2002. However, testimony revealed that the project manager's supervisors, who were responsible for determining the appropriate level of merit raises, were not aware of the project manager's protected activity nor were they influenced by anyone in awarding the merit raises to the project manager. OI also noted that there were no guidelines for merit awards, and that the supervisors had discretion to determine the amount using common factors such as level of responsibility, individual salary range and performance.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please note that final NRC investigation documents, such as the OI report described above, may be made available to the public under the Freedom of Information Act (FOIA) subject to redaction of information appropriate under the FOIA. Requests under the FOIA should be made in accordance with 10 CFR 9.23, Requests for Records, a copy of which is enclosed for your information.
Mr. Kevin Bronson RI-2006-A-0128 2
CERTIFIED MAIL RETURN RECEIPT REQUESTED Should you have any questions regarding this letter, please contact Mr. Raymond Powell of my staff at (610) 337-6967.
Sincerely,
/RA/
David C. Lew, Director Division of Reactor Projects
Enclosure:
10 CFR 9.23, Request for Records
Mr. Kevin Bronson RI-2006-A-0128 3
Distribution:
C. Carpenter, OE R. Urban, SAC ADAMS (Docket No. 50-293)
D. Screni, PAO Region I Docket Room (w/concurrences)
SUNSI Review Complete: RJP (Reviewers Initials)
DOCUMENT NAME: C:\\FileNet\\ML072560120.wpd After declaring this document An Official Agency Record it will be released to the Public.
DOCUMENT NAME: C:\\FileNet\\ML072560120.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE DRP:RPB5 RI:RC RI:OI ORA:SAC DRP:DD NAME R Powell K Farrar E Wilson R Urban D Lew DATE 8/27/2007 8/30/2007 8/29/2007 9/4/2007 9/7/2007 OFFICIAL RECORD COPY