MONTHYEARML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23192A7552023-07-14014 July 2023 July 14, 2023 Alternative Request to Defer Pvt of MO-2397 Pre-submittal Meeting Slides ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23157A0422023-06-0606 June 2023 2022 Monticello End-of-Cycle Meeting Presentation ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML22255A2162022-09-13013 September 2022 Subsequent License Renewal Application- Public Meeting September 13, 2022, Applicant Slides ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22181B0842022-06-30030 June 2022 2021 Point Beach Nuclear Plant End-of-Cycle Meeting Handout ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML22024A3722022-01-24024 January 2022 Pre-application Public Meeting Slides for Potential Relief Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant ML21336A7972021-12-0909 December 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC - December 9, 2021 (Slides) ML21335A0232021-12-0808 December 2021 Slides - Point Beach Nuclear Plant, Unit Nos. 1 and 2 December 8, 2021 Public Meeting Slides for the Draft Plant-Specific Supplement 23, Second Renewal Dseis Public Meeting ML21274A2762021-10-0505 October 2021 Public Preapplication Meeting Presentation for Fuel Oil Storage Tank Amendment ML21221A0202021-08-11011 August 2021 Nis Pr Bypass Test Panel License Amendment Request ML21285A1212021-08-0505 August 2021 SLRA Public Meeting Discussion Questions August 5 2021 ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21162A2632021-06-11011 June 2021 2020 Point Beach Nuclear Plant End-of-Cycle Meeting Presentation ML21134A0232021-05-18018 May 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC (NextEra) ML21042B9452021-02-17017 February 2021 Scoping and Process Meeting - February 17, 2021 ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20273A3102020-10-0202 October 2020 Xcel Energy Presentation for Forthcoming Public Meeting Related to Safety Limit Minimum Critical Power Ratio Amendment ML20240A2702020-08-27027 August 2020 2019 EOC Slide Presentation ML20055F8122020-02-27027 February 2020 Pre-Application Meeting - License Amendment Request - Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritsf Initiative 4b ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 Hdi ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML19009A1712019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report, NRC Public Meeting January 15, 2019 ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18213A3912018-07-12012 July 2018 Public Meeting ML18179A4032018-06-29029 June 2018 Public Meeting Discussion Points ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18121A3392018-05-0101 May 2018 Slides for Point Beach 2017 EOC Open House ML18108A0152018-05-0101 May 2018 NextEra Approach to Resolution of Tornado Missile Protection May 1, 2018 ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML18039A0892018-02-0808 February 2018 Pre - Application Meeting Risk-Informed Exemption Request Regarding Exposed Structural Steel February 8, 2018 ML17293A4292017-10-23023 October 2017 Pre-Application Meeting October 23, 2017 ML17296A2162017-10-18018 October 2017 Presentations on Reactor Decommissioning at Ma Ndcap at Plymouth Ma Public Meeting Oct 18, 2017 2024-01-31
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23262B2272023-09-21021 September 2023 September 21, 2023, Pre-Submittal Meeting on License Amendment Request to Revise PTLR to Incorporate New Surveillance Capsule Data (EPID L-2023-LRM-0070) (Slides) ML23192A7552023-07-14014 July 2023 July 14, 2023 Alternative Request to Defer Pvt of MO-2397 Pre-submittal Meeting Slides ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23157A0422023-06-0606 June 2023 2022 Monticello End-of-Cycle Meeting Presentation ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML22255A2162022-09-13013 September 2022 Subsequent License Renewal Application- Public Meeting September 13, 2022, Applicant Slides ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22181B0842022-06-30030 June 2022 2021 Point Beach Nuclear Plant End-of-Cycle Meeting Handout ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22067A0272022-03-16016 March 2022 Subsequent License Renewal Application Pre-Application Meeting March 16, 2022 ML22088A2172022-03-16016 March 2022 Liquid Effluent Discharge Presentation ML22067A0672022-03-15015 March 2022 Pre-application Public Meeting 3/15/22 Slides-NRC ML22068A1222022-03-15015 March 2022 pre-application Public Meeting 3/15/22 Slides - Applicant ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML22024A3722022-01-24024 January 2022 Pre-application Public Meeting Slides for Potential Relief Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant ML21336A7972021-12-0909 December 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC - December 9, 2021 (Slides) ML21335A0232021-12-0808 December 2021 Slides - Point Beach Nuclear Plant, Unit Nos. 1 and 2 December 8, 2021 Public Meeting Slides for the Draft Plant-Specific Supplement 23, Second Renewal Dseis Public Meeting ML21274A2762021-10-0505 October 2021 Public Preapplication Meeting Presentation for Fuel Oil Storage Tank Amendment ML21253A0152021-09-16016 September 2021 Pre-Submittal Meeting: LAR to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times -RITSTF Initiative 4b ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21162A2632021-06-11011 June 2021 2020 Point Beach Nuclear Plant End-of-Cycle Meeting Presentation ML21134A0232021-05-18018 May 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC (NextEra) ML21124A0652021-05-0606 May 2021 Xcel Energy Presentation for May 6, 2021 Public Meeting to Discuss 24-Month Cycles at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21082A4702021-03-25025 March 2021 Xcel Presentation for Monticello Pre-Application Public Meeting to Adopt Advanced Framatome Methods ML21042B9452021-02-17017 February 2021 Scoping and Process Meeting - February 17, 2021 ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20266F1052020-09-23023 September 2020 (PINGP) COVID-19 Exemption Request for the 2020 Biennial Emergency Preparedness Exercise ML20240A2702020-08-27027 August 2020 2019 EOC Slide Presentation ML20212L8622020-07-29029 July 2020 2019 Monticello and Prairie Island EOC Presentation from Webinar ML20098F0682020-04-0909 April 2020 Preapplication Teleconference Presentation: License Amendment Request to Adopt TSTF-569 ML20055F8122020-02-27027 February 2020 Pre-Application Meeting - License Amendment Request - Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritsf Initiative 4b ML20057D3082020-02-18018 February 2020 Slides Potential License Amendment to Remove Note from LCO 3.4.12 and LCO 3.4.13 ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 Hdi ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19071A2782019-03-0707 March 2019 Enclosure 3: Meeting Slides (Summary of February 28, 2019, Public Meeting with Xcel Energy to Discuss Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI (W/Enclosures 1 and 2)) ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18162A0262018-06-12012 June 2018 License Amendment Request to Reclassify Certain Fuel Handling Equipment ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides 2024-01-31
[Table view] |
Text
Participants Mark Reddemann VP, Nuclear Operations Support Jim McCarthy Director, Site Operations, PBNP Bruce MacKissock Operations Manager, MNGP Lenard Blocker Operations Manager, PNP Rob Harrsch Operations Manager, PBNP Freddie Forrest Operations Manager, PINGP Paul Harden Site Vice President, PNP Edward Weinkam Director, Nuclear Licensing Boyd Beltz Shift Manager, PBNP Jason Kindred Shift Manager, MNGP Todd Mulford Shift Manager, PNP 2
Agenda
- Introduction Mark Reddemann
- Palisades AFW Event Lenard Blocker
- NMC Lessons Learned and Action Plan Rob Harrsch Freddie Forrest Bruce MacKissock
- Effectiveness Monitoring Jim McCarthy
- Industry Communications and Summary Mark Reddemann 3
Purpose Describe actions initiated by NMC leadership to improve fleet Conduct of Operations 4
Picture of Excellence EXCELLENCE FLEET EXCELLENCE Safe, Reliable, Predictable, Leader Organizational Operational Training Equipment Excellence Excellence Excellence Excellence Predictable Teamwork Teamwork Zero Tolerance Teamwork Safety Effective Reliable Accountable Configuration Control Accountable Predictable Learning Teamwork Model Pride Accident Control Event Meet Attend No Free Dose Free Commitment Schedule Training Rework INDIVIDUAL EXCELLENCE Verification/Validation Supervisor Oversight Procedures/Work Qualified Workers Worker Practices A C Job Planning/
E M A N Preparation Instructions Opportunities Results BARRIERS FOR EXCELLENCE 5
Palisades AFW Event Auxiliary Feedwater Pumps Not in Auto
- Causal factors
Palisades AFW Event Corrective Actions Taken
- Implemented Control Panel Checklist
- Revised Control Panel Walk Down Practices
- Improved Management Observation Program
- Initiated High Intensity Training
- Fleet Learnings Effectiveness Monitoring
- Control Panel Walk Down Training
- Simulator Training Following Procedure Revisions
- Management Observation Program 7
NMC Lessons Learned
- Point Beach Nuclear Plant
- Communications and turnover status control
- Prairie Island Nuclear Generating Plant
- Independent verification
- Monticello Nuclear Generating Plant
- Procedure use and adherence 8
Action Plan
- NMC Leadership took fleet wide action
- Operations Manager Peer Team
- Accepted ownership
- Developed action plan
- Initiated immediate fleet wide actions
- Developed a Fleet-wide Conduct of Operations Assessment Plan
- Initiated Assessment Plan
- Results drive additional site actions
- Presented Action Plan to NMC Fleet Senior Leadership 9
Action Plan
- Reinforce Expectations - Complete
- Benchmarking - Complete
- Improve Conduct of Operations Guidance -
Complete
- Conduct of Operations Fleet Assessment - In Progress
- Training - In Progress
- Crew Assessments - Planned
- Effectiveness Monitoring - Planned 10
Reinforce Expectations
- CNO sent letter to all Shift Managers
- Each Shift Manager assigned to:
- Identify areas for improvement
- Shift Managers presenting CNO letter to crews 11
Benchmarking
- Exelon
- Entergy
- Constellation
- FENOC
- Existing procedure consistent with industry standards
- Identified enhancement opportunities 12
Improve Conduct of Operations Guidance
- Includes revised panel walk down standard
- Improved risk significant actions
- Incorporates alignment between Conduct of Operations and Picture of Excellence 13
Conduct of Operations Fleet Assessment
- Included Action Plan assessment
- Team composition
- Completed
- PBNP: January 29 - February 2, 2007
- MNGP: February 12 - 16, 2007
- Scheduled
- PINGP: February 26 - March 2, 2007
- PNP: March 12 - 16, 2007 14
Training
- Ensured control panel walk down training
- Developed high impact training module
- Case studies will be used to address plant specific needs 15
Crew Assessments
- Associated with Conduct of Operations and Picture of Excellence
- Crew dynamics
- Crew rotation plan 16
Effectiveness Monitoring
- Corrective Action Program Trending
- Department Roll-Up Meeting Process
- Performance Monitoring Process 17
Industry Communications
- INPO Executive Review Group
- Video for INPO Operations Supervisor Course
- Operations Manager Workshop
- INPO Operations Department Manager 18
Summary
- Leadership identified a need for fleet-wide action
- Action plan developed by owners
- Effectiveness Monitoring planned 19
Picture of Excellence EXCELLENCE FLEET EXCELLENCE Safe, Reliable, Predictable, Leader Organizational Operational Training Equipment Excellence Excellence Excellence Excellence Predictable Teamwork Teamwork Zero Tolerance Teamwork Safety Effective Reliable Accountable Configuration Control Accountable Predictable Learning Teamwork Model Pride Accident Control Event Meet Attend No Free Dose Free Commitment Schedule Training Rework INDIVIDUAL EXCELLENCE Verification/Validation Supervisor Oversight Procedures/Work Qualified Workers Worker Practices A C Job Planning/
E M A N Preparation Instructions Opportunities Results BARRIERS FOR EXCELLENCE 20