Withdrawal of a Relief Request
ML071990351
Person / Time
Site: Pilgrim
Issue date: 07/26/2007
From: James Kim
NRC/NRR/ADRO/DORL/LPLI-1
To: Balduzzi M
Entergy Nuclear Operations
kim J, NRR/ADRO/DORL, 415-4125
References
TAC MD2478
Download: ML071990351 (4)


Text

July 26, 2007 Mr. Michael A. Balduzzi Sr. Vice President & COO Regional Operations, NE Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF A RELIEF REQUEST (TAC NO. MD2478)

Dear Mr. Balduzzi:

By letter dated June 29, 2006, you applied for a relief request to the Pilgrim Nuclear Power Station. The relief request would have modified the Fourth 10-Year Inservice Testing Program to allow the use of alternative testing of ISTB 5.2.3 on the high-pressure coolant injection (HPCI) pump until August 29, 2008, in accordance with Title 10 of the Code of Federal Regulations, Section 50.55a.

By letter dated July 12, 2007, (Agencywide Document Access and Management System (ADAMS) Accession No. ML072010018) you suggested that NRC at its option may defer the review until Entergy provides results of the consultants assessment. Subsequently, by e-mail dated July 23, 2007, (ADAMS Accession No. ML072040360) you withdrew the relief request.

The NRC understands that the relief request will be resubmitted following completion of the independent consultants assessment of HPCI pump vibration analysis.

The purpose of this letter is to advise that the above cited application is being treated as withdrawn.

Sincerely,

/RA/

James Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page

ML072040360) you withdrew the relief request.

The NRC understands that the relief request will be resubmitted following completion of the independent consultants assessment of HPCI pump vibration analysis.

The purpose of this letter is to advise that the above cited application is being treated as withdrawn.

Sincerely,

/RA/

James Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page DISTRIBUTION:

PUBLIC RidsNrrDORL RidsNrrDORLLpl1-1 RidsNrrLASLittle LPL1-1 Reading RidsNrrPMJKim RidsOgcRp GHill (2)

RidsRgn1MailCenter Rids AcrsAcnwMail ACCESSION NUMBER: ML071990351 OFFICE LPLI-1/PM LPLI-1/LA LPL1-1/BC NAME JKim SLittle MKowal DATE 7/24/07 7/25/07 7/26/07 Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency 475 Allendale Road Attn: James Muckerheide King of Prussia, PA 19406-1415 400 Worcester Road Framingham, MA 01702-5399 Senior Resident Inspector U. S. Nuclear Regulatory Commission Mr. William D. Meinert Pilgrim Nuclear Power Station Nuclear Engineer Post Office Box 867 Massachusetts Municipal Wholesale Plymouth, MA 02360 Electric Company P.O. Box 426 Chairman, Board of Selectmen Ludlow, MA 01056-0426 11 Lincoln Street Plymouth, MA 02360 Mr. Kevin H. Bronson Site Vice President Chairman Entergy Nuclear Operations Nuclear Matters Committee Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 11 Lincoln Street Plymouth, MA 02360-5508 Plymouth, MA 02360 Mr. Robert G. Smith Chairman, Duxbury Board of Selectmen General Manager, Plant Operations Town Hall Entergy Nuclear Operations 878 Tremont Street Pilgrim Nuclear Power Station Duxbury, MA 02332 600 Rocky Hill Road Plymouth, MA 02360-5508 Office of the Commissioner Massachusetts Department of Mr. Stephen J. Bethay Environmental Protection Director, Nuclear Safety Assurance One Winter Street Entergy Nuclear Operations Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road Office of the Attorney General Plymouth, MA 02360-5508 One Ashburton Place 20th Floor Mr. Bryan S. Ford Boston, MA 02108 Manager, Licensing Entergy Nuclear Operations MA Department of Public Health Pilgrim Nuclear Power Station Radiation Control Program 600 Rocky Hill Road Schrafft Center, Suite 1M2A Plymouth, MA 02360-5508 529 Main Street Charlestown, MA 02129 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108

Pilgrim Nuclear Power Station cc:

Mr. John T. Herron Ms. Charlene D. Faison Sr. Vice President Manager, Licensing Entergy Nuclear Operations Entergy Nuclear Operations 1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. Oscar Limpias Mr. Ernest J. Harkness Vice President, Engineering Director, Oversight Entergy Nuclear Operations Entergy Nuclear Operations, Inc.

440 Hamilton Avenue 1340 Echelon Parkway White Plains, NY 10601 Jackson, MS 39213 Mr. John A. Ventosa Mr. William C. Dennis GM, Engineering Assistant General Counsel Entergy Nuclear Operations Entergy Nuclear Operations 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Joseph P. DeRoy Ms. Stacey Lousteau VP, Operations Support Treasury Department Entergy Operations, Inc. Entergy Services, Inc.

1340 Echelon parkway 639 Loyola Avenue Jackson, MS 39213 New Orleans, LA 70113 Mr. Michael Kansler Mr. James Sniezek President & CEO/CNO 5486 Nithsdale Drive Entergy Nuclear Operations Salisbury, MD 21801-2490 1340 Echelon Parkway Jackson, MS 39213 Mr. Michael D. Lyster 5931 Barclay Lane Mr. John F. McCann Naples, FL 34110-7306 Director, Nuclear Safety & Licensing Entergy Nuclear Operations Mr. Garrett D. Edwards 440 Hamilton Avenue 814 Waverly Road White Plains, NY 10601 Kennett Square, PA 19348 Mr. John Doering P.O. Box 189 Parker Ford, PA 19457