Letter Sequence Other |
|---|
|
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML061710422, ML063450079, ML063450082, ML063450086, ML063450368, ML063460496, ML063460507, ML063460517, ML063460530, ML063460536, ML063460541, ML063460545, ML063470100, ML063470111, ML063470166, ML063470183, ML063470191, ML063470194, ML063470200, ML063470217, ML063470256, ML063470309, ML063470312, ML063470335, ML063470336, ML063470338, ML063470401, ML063470405, ML063470408, ML063470412, ML063470418, ML063470424, ML063470429, ML063470471, ML063470473, ML063470479, ML063480323, ML063480389, ML063480402, ML070100073, ML070100079, ML070100094, ML070100101, ML070100105, ML070100223, ML070100228, ML070100272, ML070120084, ML070370272, ML070370295... further results
|
MONTHYEARML0634703122006-03-29029 March 2006 E-MAIL: (PD) Czm Project stage: Other ML0634503682006-03-29029 March 2006 E-MAIL: (PD) Pilgrim Czm Notice Project stage: Other ML0634701762006-03-29029 March 2006 NRC Contact Report - Arrange Meeting with Town Officials During Site Audit (Intergovernmental) Project stage: Meeting ML0634703092006-03-30030 March 2006 E-MAIL: (Intergovernmental) Pilgrim Audit Project stage: Other ML0634701802006-04-0303 April 2006 NRC Contact Report - Arrange Meeting with Town Personnel During May Site Audit (Intergovernmental) Project stage: Meeting ML0634701892006-04-0505 April 2006 NRC Contact Report - Arrange Meeting with Town Personnel During Site Audit in May (4/5/06) (Intergovernmental) Project stage: Meeting ML0634701832006-04-0505 April 2006 NRC Contact Report - Follow Up from 4/3/06 Telephone Call (Intergovernmental) Project stage: Other ML0634703132006-04-0606 April 2006 E-MAIL: (Intergovernmental) Pilgrim Audit (List for Plymouth Meeting) Project stage: Meeting ML0634702172006-04-10010 April 2006 E-MAIL: (PD) FW: Massachusetts Tribal Information Project stage: Other ML0634605412006-04-11011 April 2006 E-MAIL: (PD) Czm Consistency Determination Project stage: Other ML0634703242006-04-12012 April 2006 E-MAIL: (Intergovernmental) May 3 Meeting - Pilgrim NPS License Renewal (List for Kingston Meeting) Project stage: Meeting ML0634703262006-04-12012 April 2006 E-MAIL: (Intergovernmental) May 3 Meeting - Pilgrim NPS License Renewal (List for Duxbury Meeting) Project stage: Meeting ML0634703292006-04-12012 April 2006 E-MAIL: (Intergovernmental) May 4 Meeting - Pilgrim NPS License Renewal (List for Carver Meeting) Project stage: Meeting ML0634703192006-04-12012 April 2006 E-MAIL: (Intergovernmental) May 4 Meeting - Pilgrim NPS License Renewal (List for Old Colony Meeting) Project stage: Meeting ML0634701002006-04-18018 April 2006 E-MAIL: (PA) NRC Issues Notice of Intent to Prepares EIS Pilgrim LRA Project stage: Other ML0634605452006-04-18018 April 2006 E-MAIL: (PD) Pilgrim Nuclear Generating Station License Renewal Application Project stage: Other ML0634701742006-04-26026 April 2006 NRC Contact Report - Follow Up from Alicia Williamsons Call to Mr. Halkiotis, in Regard to Meeting with Town Personnel During Site Audit in May (Intergovernmental) Project stage: Meeting ML0634701702006-04-28028 April 2006 NRC Contact Report - Arrange Meeting with Town Personnel During Site Audit in May (Intergovernmental) Project stage: Meeting ML0634703332006-04-28028 April 2006 E-MAIL: (Intergovernmental) May 3 Meeting - Pilgrim NPS License Renewal (List for Marshfield Meeting) Project stage: Meeting ML0634700512006-05-0101 May 2006 (PD) Ecology Meeting Notes Pilgrim Nuclear Power Station Site Audit on May 1, 2006 Project stage: Meeting ML0634700722006-05-0202 May 2006 (PD) Pilgrim Nuclear Power Station License Renewal Site Audit Off-Site Meetings May 2-4, 2006 Draft Meeting Notes ML0634703352006-05-0303 May 2006 E-MAIL: (Intergovernmental) Town of Kingston Population Figures Project stage: Other ML0634703362006-05-0303 May 2006 E-MAIL: (Intergovernmental) FW: Planners Event on Current Trends in Metroboston Project stage: Other ML0634701112006-05-0505 May 2006 E-MAIL: (Intergovernmental) Town of Carver, Ma Gis Layer List Project stage: Other ML0634702562006-05-0606 May 2006 E-MAIL: (PD) FW: New Dwelling Units Project stage: Other ML0634703382006-05-0909 May 2006 E-mail: (Intergovernmental) Planners Event on Current Trends in Metroboston Project stage: Other ML0634701912006-05-0909 May 2006 E-MAIL: (Intergovernmental) New Dwelling Units Project stage: Other ML0634704012006-05-0909 May 2006 E-MAIL: (Intergovernmental) How Many Housing Units Built Since 2000? Project stage: Other ML0634700672006-05-18018 May 2006 (PD) PNPS Lr EIS Ecology Meeting May 18, 2006 Project stage: Meeting ML0634704052006-05-18018 May 2006 E-mail: (Intergovernmental) Townscape Plan for Marshfield Project stage: Other ML0634605072006-05-19019 May 2006 E-MAIL: (PD) Information Pilgrim LRA Project stage: Other ML0634604962006-05-22022 May 2006 E-MAIL: (PD) Found Extra Color Copy Project stage: Other ML0634702002006-05-30030 May 2006 E-MAIL: (PD) PNPS License Renewal - Environmental Project stage: Other ML0634704082006-05-31031 May 2006 E-MAIL: (Intergovernmental) FW: No Subject (from M. Sylvia to A. Parker) Project stage: Other ML0634704122006-06-0101 June 2006 E-MAIL: (Intergovernmental) Plymouth Population & Buildout Data (Forecasts) Project stage: Other ML0634704182006-06-0202 June 2006 E-MAIL: (Intergovernmental) FW: No Subject (6/2/06 from M. Sylvia to A. Parker) Project stage: Other ML0634701942006-06-0505 June 2006 E-MAIL: (PD) Invasive Nuisances Project stage: Other ML0617104222006-06-0707 June 2006 License Renewal Application, Amendment 2 Project stage: Other ML0634701662006-08-16016 August 2006 NRC Contact Report - to Obtain an Update on the Status of Rainbow Smelt Stocks in the Vicinity of PNPS (Intergovernmental) Project stage: Other ML0634704242006-08-18018 August 2006 E-MAIL: (Intergovernmental) Rainbow Smelt Data (8/18 from S. Duda) Project stage: Other ML0634704712006-08-31031 August 2006 E-MAIL: (Intergovernmental) Pilgrim NPS EIS - Info Request Project stage: Other ML0634704732006-09-0101 September 2006 E-MAIL: (Intergovernmental) Pilgrim NPS EIS - Info Request Project stage: Other ML0634704792006-09-0808 September 2006 E-MAIL: (Intergovernmental) Plymouth Population & Buildout Data Project stage: Other ML0634704292006-09-20020 September 2006 E-MAIL: (Intergovernmental) Rainbow Smelt Data (Attachments: Jones River Catch table-05.xls & Final Report 2004.doc) Project stage: Other ML0634803512006-11-0202 November 2006 E-mail: (PD) Draft RAI Project stage: Draft Other ML0634804022006-11-0606 November 2006 E-MAIL: (PD) Fwd: Entergy Nuclear Cultural Resources Protection Plan Project stage: Other ML0634500862006-11-0808 November 2006 E-MAIL: (PA) Nuclear-Impacted Communities (from J. Berger to A. Williamson) Project stage: Other ML0634500842006-11-11011 November 2006 E-MAIL: (PA) Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives (SAMA) for Pilgrim Nuclear Power Station, May 22, 2006 Project stage: Request ML0634500822006-11-13013 November 2006 E-MAIL: (PA) Nuclear-Impacted Communities (to J. Berger) Project stage: Other ML0634500812006-11-14014 November 2006 E-MAIL: (PA) Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives (SAMA) Project stage: RAI 2006-05-18
[Table View] |
Text
Perry Buckberg - FSAR Exce-rptP Page i 1 From:
To:
Date:
Subject:
"Ford, Bryan" <BFord@entergy.com>
"Perry Buckberg" <PHB1 @nrc.gov>
1/30/2007 12:28:06 PM FSAR Excerpt
- Perry, Attached is a page from the PNPS FSAR on Fire Hose Station testing.
Bryan Ford 1.;-.
C.
cAtemp\\GWJ00001.TMP Page 1 1 Wc:.
M P.Pag 1
4 Mail Envelope Properties (45BF801D.D3B : 9: 52539)
Subject:
Creation Date From:
Created By:
FSAR Excerpt 1/30/2007 12:27:43 PM "Ford, Bryan" <BFord@entergy.com>
BFord@entergy.corn Recipients nrc.gov OWGWPO01.HQGWDO01 PHB 1 (Perry Buckberg)
Post Office OWGWPO0 I.HQGWD01 Route nrc.gov Files MESSAGE ScanOO.PDF Mime.822 Options Expiration Date:
Priority:
ReplyRequested::
Return Notification:
Concealed
Subject:
Security:
Size 89 48057 68244 Date & Time 1/30/2007 12:27:43 PM None Standard No None..
iv No Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator
ýJunk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled
PNPS-FSAR 10.8.4.5.2 Fire Hose Stations Surveillance Requirements
(
Each interior fire hose station shall be verified to be operable:
- 1.
At least once per month by visual inspection of the station to assure that the hose and nozzle are properly installed.
(Exception -
Once per cycle for those in Locked High Radiation Areas).
- 2.
At least once per cycle by remnoving the hose for inspection, replacing any degraded coupling gaskets, and reracking.
- 3.
At least once per two fuel cycles (approximately 4
years) by partially opening each hose station valve to verify valve operability and no obstruction.
(Partial flow test).
- 4.
By conducting a hydrostatic test of each hose every three years.
- a.
at a pressure 50 psig greater than the maximum available pressure at that hose station.,
or
- b.
at the applicable service test pressure as listed in Table 8-3 of the "Standard for
- Care, Maintenance of Fire Hose including Connection and Nozzles."
NFPA No. 1962-1979, or
- c.
by replacing each nontested hose with a new or..
used hose which has been hydrostaticaliyiese e n
accordance with the pressures sQecified in a or' b above.
V ýý,.
10.8.4.6 Fire Barrier System 1!0. 8 -12
'R81 Re,,,
0c
-Oc i97