February 20, 2007 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL (PILGRIM NUCLEAR POWER STATION)
Dear Mr. Balduzzi:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Pilgrim Nuclear Power Station.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Vincent Fallacaro, Manager of Training and Development. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, on February 23, 2007. The NRC staff will administer the operating tests during the week of February 26, 2007.
Please contact your Chief Examiner, Mr. Gilbert Johnson, at 610-337-5136, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No. 50-293 License No. DPR-35
M. A. Balduzzi cc w/encl:
G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.
J. T. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, Vice President, Operations Support S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing R. Patch, Director of Oversight, Entergy Nuclear Operations, Inc.
B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.
T. C. McCullough, Assistant General Counsel S. Lousteau, Treasury Department, Entergy Services, Inc.
Director, Radiation Control Program, Commonwealth of Massachusetts C. White, RRPT, CHP, Radiological Health, Vermont Department of Health The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network Chairman, Citizens Urging Responsible Energy J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant W. Meinert, Nuclear Engineer J. Muckerheide, MEMA and Commonwealth of Massachusetts, SLO Designee Commonwealth of Massachusetts, Secretary of Public Safety V. Fallacaro, Manager, Training and Development
M. A. Balduzzi Distribution:
G. Johnson, Chief Examiner, DRS DRS Master Exam File ©. Bixler) (w/concurrences)
DRS File E-mail Distribution:
S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO A. R. Blough, DRS M. Sykes, DRS R. Powell, DRP B. Bickett, DRP J. Kim, PM, NRR J. Boska, NRR W. Raymond, DRP, Senior Resident Inspector C. Welch, DRP, Resident Inspector A. Ford, DRP, Resident OA Region I Docket Room (with concurrences)
SUNSI Review Complete: MDS (Reviewers Initials)
ADAMS PKG: ML060800104 DOCUMENT NAME:
C:\FileNet\ML070520117.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB GJohnson/GAJ MDSykes/MDS DATE 02/20/07 02/20/07 02/20/07 OFFICIAL RECORD COPY