IR 05000373/1981016

From kanterella
Jump to navigation Jump to search
Advises of Error in Identifying Correct Rept Number in NRC .Pen & Ink Change Should Be Made to Reflect Insp Rept 50-373/81-16
ML20033B421
Person / Time
Site: Quad Cities, LaSalle  Constellation icon.png
Issue date: 11/25/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8112010392
Download: ML20033B421 (2)


Text

,

Y

.

NOV 2 51981 Docket No.60-254 Docket No. 50-265 Docket No. 50-373 Commonwealth Edison Company ATTN:

Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

In the body of our letter dated November 9, 1981, an error was made in identifying the correct report number for LaSalle Unit 1.

Please make a pen and ink change so your copy of the letter reflects Inspection Report No. 50-373/81-16.

Your cooperation is appreciated.

Sincerely, W" f C. E. Norelius, Director Division of Engineering and Technical Inspection cc:

Louis 0. De1 George, Director of Nuclear Licensing N. Kalivianakis, Plant N

Superintendent a

L. J. Burke, Site if Construction Superintendent

F

"

$r"g[

-

'

T. E. Quaka, Quality

,

Assurance Supervisor g

"

R. H. Holyoak, Station

-

NOV3 01981* i)

Superintendent u.s. asatu sema^'o

'

" * *

U'

B. B. Stephenson, Project Manager 5,

.A ty cc w/ltr dtd 11/9/81:

u

)

DMB/ Document Control Desk (RIDS)

-

-

Resident Inspector, RIII Mary Jo Murray, Office of Assistant Attorney General RIII RI,II KIII RIII RI N

//f

.&b V

' &,,

Holzmer/so ftyiA11ams Reim Nore,lius

[gBaker ll/13/P/

p/;q

$2er p

11/23/81 8112010392 011125 PDR ADOCK 0S000394

)

G PDR fff

V

,

~

..

NOV 9 1981

-

Docket No. 50-254 Docket No. 50-265 Docket No. 50-373

.

Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

Thank you for your letter dated June 19, 1981, informing us of the steps you have taken to correct the noncompliance which we brought to your attention

-

in Inspection Report No. 50-254/81-07; 50-265/81-07; 50-373/81-(j) forwarded by our letter dated May 26, 1981. We note that you have had Revision 18 to the Commonwealth Edison Company Topical Report No. CE-1-A approved on July 17, 1981. This revision clarified the procurement of replacement parts from original manufacturers where originally no specific quality assurance program requirements had been identified because of procurement prior to the

'

effective date of Appendix B to 10 CFR 50.

We will examine these matters during a subsequent inspection.

,

Your cooperation with us is appreciated.

Sincerely, ift't.

C. E. Noreliuf, Director Division of Engineering and Technical Inspection

_

ec: Louis 0. De1 George, Director of Nuc. Lic.

-

N. Kalivianakis, Plant Supt.

L. J. Burke, Site Const. Supt.

T. E. Quaka, QA Supervisor R. H. Holyoak, Station Supt.

B. B. Stephenson, Project Mgr.

cc w/1tr dtd 6/19/81:

DMB/ Document Control Desk (RIDS)

Resident Inspectors, RIII i

,

Mary Jo Hurray, Office of Assistant Attorney General i

.

O e

1