Text
.
.
.
.
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-373/81-39 Docket No. 50-373 License No. CPPR-99 Licensee:
Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: LaSalle County Nuclear Power Station, Unit 1 Inspection At: LaSalle County, IL Inspection Conducted: October 5-9 and 13-16, 1981 Date of Last Physical Security Inspection: June 8-12, 1981 Type of Inspection: Announced, Pre-operational Physical Protection Inspection Inspectors:
%
. fj*c,/A
//[2'/[9/
T. J./harfeda ~
/
fate Physicaf Security Specialist
.
Ldf
//
T G. M. Christoffer g/p Date Physical Security Specialist JwY
/ fu MkTk/
-
B. W. Stapleton~
'
/ Ddte Physical Security Intern Approved By: k.
// 38!6/
'J/ R. Creed, Acting Chief
/ Date afeguards Section Inspection Summary:
Inspection on October 5-9 and 13-16, 1981 (Report No. 50-373/81-39)
Areas Inspected:
Included a review of the status of implementation, installation, and operability of the security program and pre-operational testing program for security-related equipment.
Specifically, the 9112160081 811209 DR ADOCK 05000373 PDR
.
-
-
- - -
-
-
. -
.
-
.
.
....
.
.
..
inspection covered: Security Plan and Implementing Procedures; Security Organization - Response; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barrierr,
- Protected Area; Physical Barriers - Vital Area; Security System Power Supply; Lighting; Assessment Aids; Access Control - Personnel; Access Contrcl - Packages; Access Control - Vehicles; Detection Aids Protected Area; Detection Aids - Vital Area; Alarm _ Stations; Communications; Guard Training and Qualification Plan; and ContinRency Plan. The inspection involved 163 inspector-hours onsite by four JRC inspectors.
Results: Based on this pre-operational inspection, a total of four new findings were identified. A review of our findings showed that of 41 items identified on a previous security pre-operational inspection, the inspectors were able to close eight of these items. The above noted findings do nct represent noncompliance but only represent items which must be completed and/or considered prior to fuel load.
-
(Details )
-
..
-
-
-
-
-
-.
.