IE Preoperational Physical Protection Insp Rept 50-373/81-39 on 811005-09 & 13-16.No Noncompliance Noted.Major Areas Inspected:Status of Implementation & Operability of Security Program.Details Withheld (Ref 10CFR73.21)
ML20038D125
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 11/30/1981
From: Christoffer G, Creed J, Madeda T, Bern Stapleton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20038D116 List:
References
50-373-81-39, NUDOCS 8112160081
Download: ML20038D125 (2)


Text

.

.

.

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-373/81-39 Docket No. 50-373 License No. CPPR-99 Licensee:

Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: LaSalle County Nuclear Power Station, Unit 1 Inspection At: LaSalle County, IL Inspection Conducted: October 5-9 and 13-16, 1981 Date of Last Physical Security Inspection: June 8-12, 1981 Type of Inspection: Announced, Pre-operational Physical Protection Inspection Inspectors:

%

. fj*c,/A

//[2'/[9/

T. J./harfeda ~

/

fate Physicaf Security Specialist

.

Ldf

//

T G. M. Christoffer g/p Date Physical Security Specialist JwY

/ fu MkTk/

-

B. W. Stapleton~

'

/ Ddte Physical Security Intern Approved By: k.

// 38!6/

'J/ R. Creed, Acting Chief

/ Date afeguards Section Inspection Summary:

Inspection on October 5-9 and 13-16, 1981 (Report No. 50-373/81-39)

Areas Inspected:

Included a review of the status of implementation, installation, and operability of the security program and pre-operational testing program for security-related equipment.

Specifically, the 9112160081 811209 DR ADOCK 05000373 PDR

.

-

-

- - -

-

-

. -

.

-

.

.

....

.

.

..

inspection covered: Security Plan and Implementing Procedures; Security Organization - Response; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barrierr,

- Protected Area; Physical Barriers - Vital Area; Security System Power Supply; Lighting; Assessment Aids; Access Control - Personnel; Access Contrcl - Packages; Access Control - Vehicles; Detection Aids Protected Area; Detection Aids - Vital Area; Alarm _ Stations; Communications; Guard Training and Qualification Plan; and ContinRency Plan. The inspection involved 163 inspector-hours onsite by four JRC inspectors.

Results: Based on this pre-operational inspection, a total of four new findings were identified. A review of our findings showed that of 41 items identified on a previous security pre-operational inspection, the inspectors were able to close eight of these items. The above noted findings do nct represent noncompliance but only represent items which must be completed and/or considered prior to fuel load.

-

(Details )

-

..

-

-

-

-

-

-.

.