U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-373/81-47 Docket No. 50-373 License No. CPPR-99 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: LaSalle County Nuclear Power Station, Unit 1 Inspection At: LaSalle County, IL Inspection Conducted: December 8-11, 1981 Date of Last Physical Securii.y Inspection: October 5-9 and 13-15, 1981 Type of Inspection: Announced, Pre-Operational Physical Protection Inspectors: 9. h b lA vto/4
///
fd l' L. Belanger'
Date Physical Security Specialist s
,I)
-
tJ L-
/ lS' S
~G. M. Christoffer
[(
Date Physical Security Specialist Approved By:
-
b>'k/
gMyh' V
/..wJ. R. Creed, Acting Chief Date Safeguards Section
,-
Inspection Summary Inspection on December 8-11, 1981 (Report No. 50-373/81-47)
Areas Inspected:
Included a review of the status of implementation of 14 open items identified in IE Inspection Reports 50-373/81-19 and 50-373/81-39.
The inspection involved 44 inspector-hours onsite by two NRC inspectors.
Results:
Based on this pre-operational inspection, 12 of the 14 open items were closed. These items do not represent noncompliance, but only represent matters which must be considered or closed prior to fuel load.
(Details )
.