U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
.
REGION III
,
Report No. 50-373/81-19
<
Docket No. 50-373 License No. CPPR-99 Licensee:
Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 d
Facility Name: LaSalle County Nuclear Power Station, Unit 1 Inspection A.c:
LaSalle County, Illinois Inspect'.on Conducted: June 8-12, 1981
<
Date of Last Physical Security Inspection: This was the First Inspection of Facility Security System Type of Inspection: Announced, Pre-operational Physical Protection Inspection J
Inspectors:
%_.b. bd 4 M kMf$(
-
'
J.CL. Belanger" Date Physical Security Specialist
.V Ouh 1/2o/E/
J. R. Creed, Acting Chief
/
Ifate afeguards Section
,
/[OMA 2oP/
f T. J. Madeda
/
eate Physical Security Specialist sme Af
)
fY i
1. W. Stapleto r
/
/
// Dgte Physical Security Intern
.M
h!8[
Approved By:
J R. Creed, Acting Chief
/
Date afeguards Section
~8108110217 810805 PDR ADOCK 05000373 G
--
. _ _
_.
, _ _ _.
_..
. - _ _.
_ _
_.
_._.. _ _,.
-
_ - _ -. _.
- _-
.
.
-.
.
.
Inspection Summary:
.
Inspection on June 8-12, 1981 (Report No. 50-373/81-19)
Areas Inspected:
Included a review of the status of implementation, installation, and operability of the security program and pre-operational testing program for security-related equipment. Specifically, the in-spectors covered: Security Plan, Security Program Audit; Security Organization; Protected Area Physical Barriers; Vital Area Physical Barriers; Lighting; Access Control (Identification, Authorization, and Badging); Access Control (Search); Access Control (Escorting); Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids;
!
Testing and Maintenance; Compensatory Measures; Power Supply; Response, Locks, Keys, and Combinations. The inspection involved 122 inspector-hours onsite by four NRC inspectors.
Results: Based on the limited pre-operational inspection, a total of 41 findings were noted. These findings do not represent noncompliances, but only represent items which must be completed and/or considered prior to fuel load.
,
(Details Contain 2.790(d) Information)